List of Surat Metro stations

From Wikipedia, the free encyclopedia
(Redirected from Bimrad metro station)

This is a list of all stations of the Surat Metro,[1] an under-construction rapid transit system serving Surat City and Surat Metropolitan Region in the state of Gujarat, India.[2][3][4] The Surat Metro will be the sixth transit system to be built in India. The construction of Surat Metro was started on 18 January 2021 with 2 lines Red Line & Green Line with the total number of 38 stations, the project is expected to be completed by December 2027,[5] which will cover a distance of 41 kilometers.[6]

The metro network will allow Surat to connect with Sarthana to DREAM City (22-kilometre (14 mi)) and from Bhesan Depot to Saroli (18-kilometre (11 mi)).[7][8]

Each line of the Surat Metro is identified by a specific color. The first corridor frome Sarthana to DREAM City will be known as Red Line and The second corridor from Bhesan Depot to Saroli will be known as Green Line.[9] The system uses rolling stocks of standard gauge trains and has a combination of elevated, underground and at-grade lines.[10]

Metro stations[edit]

This list is sortable. Click on the icon in the column header to change sort key and sort order

Sr. No. Station name Line Layout Platform Layout Status Notes Refs
English Gujarati
1 Adajan Gam અડાજણ ગામ Line 2 Elevated Side Under construction
2 Althan Tenament અલથાણ ટેનામેન્ટ Line 1 Elevated Side Under construction
3 Althan Gam અલથાણ ગામ Line 1 Elevated Side Under construction
4 Anjana Farm અંજના ફાર્મ Line 2 Elevated Side Under construction
5 Athwa Chopati અઠવા ચોપાટી Line 2 Elevated Side Under construction
6 Badri Narayan Temple બદ્રી નારાયણ ટેમ્પલ Line 2 Elevated Side Under construction
7 Bharat Cancer Hospital ભારત કેન્સર હોસ્પિટલ Line 2 Elevated Side Under construction
8 Bheshan ભેસાણ Line 2 Elevated Side Under construction [11]
9 Bhimrad ભીમરાડ Line 1 Elevated Side Under construction
10 Botanical Garden બોટનિકલ ગાર્ડન Line 2 Elevated Side Under construction
11 Central Warehouse સેન્ટ્રલ વેરહાઉસ Line 1 Underground Side Under construction
12 Convention Center કન્વેન્શન સેન્ટર Line 1 Elevated Side Under construction
13 DREAM City ડ્રીમ સિટી Line 1 Elevated Side Under construction
14 Gandhi Baug ગાંધીબાગ Line 1 Underground Side Under construction
15 Jagdishchandra Bose Aquarium જગદીશચંદ્ર બોસ એક્વેરિયમ Line 2 Elevated Side Under construction
16 Kadarsha Ni Naal કાદરશા ની નાળ Line 1 Elevated Side Under construction [12]
17 Kamela Darwaja કમેલા દરવાજા Line 2 Elevated Side Under construction
18 Kapodra કાપોદ્રા Line 1 Underground Side Under construction
19 Labheshwar Chowk લાભેશ્વર ચોક Line 1 Underground Side Under construction
20 LP Savani School એલ.પી.સવાણી સ્કૂલ Line 2 Elevated Side Under construction
21 Magob મગોબ Line 2 Elevated Side Under construction
22 Majura Gate મજુરા ગેટ Line 1 Line 2 Elevated Side Under construction Interchange with Line 1 & Line 2
23 Maskati Hospital મસ્કતી હોસ્પિટલ Line 1 Underground Side Under construction
24 Model Town મોડલ ટાઉન Line 2 Elevated Side Under construction
25 Nature Park નેચર પાર્ક Line 1 Elevated Side Under construction
26 Palanpur Road પાલનપુર રોડ Line 2 Elevated Side Under construction
27 Performing Art Centre પર્ફોર્મિંગ આર્ટ સેન્ટર Line 2 Elevated Side Under construction
28 Rupali Canal રૂપાલી કેનાલ Line 1 Elevated Side Under construction
29 Sarthana સરથાણા Line 1 Elevated Side Under construction [13][14]
30 Saroli સારોલી Line 2 Elevated Side Under construction
31 Shri Swaminarayan Mandir Kalakunj શ્રી સ્વામિનારાયણ મંદિર કલાકુંજ Line 1 Elevated Side Under construction
32 Surat Railway Station સુરત રેલ્વે સ્ટેશન Line 1 Underground Side Under construction Transfer station to Surat Railway Station
33 Udhna Darwaja ઉધના દરવાજા Line 2 Elevated Side Under construction
34 Ugat Varigruh ઉગત વરિગૃહ Line 2 Elevated Side Under construction
35 Varachha Chopati Garden વરાછા ચોપાટી ગાર્ડન Line 1 Elevated Side Under construction
36 VIP Road વી.આઈ.પી રોડ Line 1 Elevated Side Under construction
37 Woman ITI વુમન આઈ.ટી.આઈ Line 1 Elevated Side Under construction

Statistics[edit]

Total number of metro stations 38
Total number of metro stations under construction 38
Number of interchange stations 1
Number of Elevated stations 32
Number of underground stations 6
Number of At-Grade stations 0

See also[edit]

References[edit]

  1. ^ "Surat Metro: PayCraft Solutions, Airtel Payments Bank roped in for automatic collection of fare". The Indian Express. 27 April 2023. Retrieved 21 November 2023.
  2. ^ Livemint (21 November 2023). "Indian Navy, DRDO test indigenously developed naval anti-ship missile | Watch". mint. Retrieved 21 November 2023.
  3. ^ "Surat Metro – Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 21 November 2023.
  4. ^ "Sadbhav Engineering share price gains 3% on bagging Rs 780-crore metro rail contract". Moneycontrol. 11 January 2021. Retrieved 22 November 2023.
  5. ^ "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". News18. 12 July 2023. Retrieved 21 November 2023.
  6. ^ "Private properties of 700 families to be acquired for Surat metro". The Indian Express. 11 September 2020. Retrieved 22 November 2023.
  7. ^ Journal, Tunnelling (4 April 2023). "TERRATEC EPBMs launched for Surat Metro". The Tunnelling Journal. Retrieved 21 November 2023.
  8. ^ www.ETInfra.com. "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail - ET Infra". ETInfra.com. Retrieved 21 November 2023.
  9. ^ "500-Year-Old African Baobab Tree Spared from Destruction in Surat Metro Rail Project". The Blunt Times. 10 October 2023. Retrieved 21 November 2023.
  10. ^ "Surat Metro phase I to start commercial run in December 2027, check stations and route details". News9live. 12 July 2023. Retrieved 21 November 2023.
  11. ^ "RVNL bags ₹198.93 crore order for construction of Bhesan Depot of Surat Metro Phase 1 | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 22 November 2023.
  12. ^ "Dilip Buildcon-RBL JV gets go-ahead for Surat Metro Rail project". cnbctv18.com. 3 October 2022. Retrieved 22 November 2023.
  13. ^ https://www.financialexpress.com/business/infrastructure-surat-metro-phase-i-to-start-operations-in-december-2027-check-route-distance-and-stations-here-3168089/
  14. ^ "Metro tunnel work to be completed by December". The Times of India. 7 June 2023. ISSN 0971-8257. Retrieved 21 November 2023.

External links[edit]