Ngakawau Hydro Project

Coordinates: 41°36′40″S 171°52′30″E / 41.611°S 171.875°E / -41.611; 171.875
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Scotty1141 (talk | contribs) at 09:32, 9 November 2022. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Ngakawau Hydro Project
Map
Country
  • New Zealand
LocationWest Coast, South Island, New Zealand
Coordinates41°36′40″S 171°52′30″E / 41.611°S 171.875°E / -41.611; 171.875
StatusPlanned
OwnerHydro Developments Ltd
Thermal power station
Primary fuelHydropower
Power generation
Nameplate capacity24 MW (32,000 hp)[1]

The Ngakawau Hydro Project is a proposed hydroelectric power station planned on the Ngakawau River in the northern section of the West Coast of the South Island of New Zealand. The project is being developed by Hydro Developments Limited.

In December 2008 Hydro Developments applied for resource consent for a 20MW hydro scheme (the Stockton Plateau Hydro Project) using polluted water from the Stockton Mine.[2] Consent was granted in January 2010.[3] The scheme was expected to reduce acid mine drainage from the mine into the Ngakawau River,[4] and was supported by the Green Party of Aotearoa New Zealand.[5]

In February 2010 Solid Energy applied for resource consent for a 49MW plant in the same area (the Stockton Hyydro Scheme).[6][7] In October 2010 both parties announced that they had reached an agreement on using water from the Stockton plateau for hydro-electricity and that they would abandon their respective Environment Court appeals of the others' scheme.[8][9] Solid Energy's application was rejected in mid-2010,[10] but consent was granted by the Environment Court of New Zealand in May 2012.[11][12] Solid Energy went into voluntary administration in August 2015,[13] and the Stockton mine site was sold to Phoenix Coal.[14]

In November 2019 Hydro Developments applied for its projects resource consents to be extended.[15] The schemes were subsequently merged into a single project called the Ngakawau scheme, and the consents were extended until 2026.[1]

See also

References

  1. ^ a b "Hydro generation stack update for large-scale plant". Roaring40s. 24 September 2020. p. 15. Retrieved 1 July 2021.
  2. ^ "Stockton Plateau Hydro Project". West Coast Regional Council. Archived from the original on 8 February 2013.
  3. ^ "Buller hydro scheme gets green light". RNZ. 20 January 2010. Retrieved 1 July 2021.
  4. ^ "Pro-green hydro scheme gets tick". New Zealand Herald. 1 February 2010. Retrieved 1 July 2021.
  5. ^ "Green Party thanked for supporting hydro scheme". RNZ. 31 January 2009. Retrieved 1 July 2021.
  6. ^ "Solid Energy seeks approval for hydro scheme". RNZ. 3 February 2010. Retrieved 1 July 2021.
  7. ^ Amy Glass (18 May 2010). "Hydro scheme would power 22,000 homes - Solid Energy". Stuff. Retrieved 1 July 2021.
  8. ^ "Stockton hydro stoush resolved". NBR. 1 October 2010. Retrieved 1 July 2021.
  9. ^ NZPA (1 October 2010). "Buller power scheme gets the green light". Television New Zealand News. Archived from the original on 3 October 2010. Retrieved 2 October 2010.
  10. ^ Amy Glass (6 July 2010). "Concern over river halts Ngakawau plan". Stuff. Retrieved 1 July 2021.
  11. ^ "Solid Energy gets consent for hydro project in Buller". RNZ. 2 May 2012. Retrieved 1 July 2021.
  12. ^ "Stockton hydro-electricity scheme gains consents". Scoop. 2 May 2012. Retrieved 1 July 2021.
  13. ^ English, Bill; McClay, Todd (13 August 2015). "Solid Energy into temporary voluntary administration" (Press release). New Zealand Government.
  14. ^ Lee Scanlon (2 November 2016). "Phoenix to pay $46m for West Coast coal mines". New Zealand Herald. Retrieved 1 July 2021.