Talk:Siemens Wind Power/Archives/2015

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Employment

Removed:

450 people were hired in Aalborg to make blades for the 6MW direct drive turbine.[1]

The article states that the take on is temporary, the data is a single sample .. could be reintegrated in a more meaningful sense later.83.100.174.82 (talk) 12:06, 16 March 2015 (UTC)

  1. ^ Hansen, Theis Holtz (6 March 2014), "Siemens søger 450 til vindmøllejob", ing.dk (in Danish)

Other removals

The D6 has Top Head Mass of 34 tonnes per MW.[1]

As above, a single sample, engineering detail that does not relate to the rest of the article. "Erratic" or "patchwork" data - not encyclopedic.83.100.174.82 (talk) 12:09, 16 March 2015 (UTC)

  1. ^ Wittrup, Sanne. "Så er den første af Siemens' kæmpemøller rejst til havs " Ingeniøren, 15 August 2014. Accessed: 19 February 2015.