The process often starts with a planning stage in which plans are prepared by an [[architect]] and approved by the client and any regulatory authority.<ref>{{cite web | url=http://agcsf.com/approaching-home-construction/ | title=Approaching Home Construction | publisher=Aaron Gordon Construction Inc. | accessdate=13 February 2015 | author=Gordon, Aaron | deadurl=yes | archiveurl=https://web.archive.org/web/20150213114529/http://agcsf.com/approaching-home-construction/ | archivedate=13 February 2015 | df= }}</ref> Then the site is cleared, [[foundation (engineering)|foundations]] are laid and [[trench]]es for connection to services such as [[sewerage]], water, and electricity are established. If the house is wooden-framed, a framework is constructed to support the boards, siding and roof. If the house is of brick construction, then courses of bricks are laid to construct the walls. Floors, beams and internal walls are constructed as the building develops, with plumbing and wiring for water and electricity being installed as appropriate. Once the main structure is complete, internal fitting with lights and other fitments is done, and the house may be decorated and furnished with furniture, cupboards, carpets, curtains and other fittings.<ref>{{citation |url=https://books.google.com/books?id=xw3FBgoDfDwC&printsec=frontcover&dq=Building+a+House&hl=en&sa=X&ei=7T12UsbkHsG60QXmhoHICQ&ved=0CFAQ6AEwAg#v=onepage&q=Building%20a%20House&f=false|title=Building a House |author=JoAnn Early Macken |year=2009}}</ref>{{better source|date=October 2013}} |
The process often starts with a planning stage in which plans are prepared by an [[architect]] and approved by the client and any regulatory authority.<ref>{{cite web | url=http://agcsf.com/approaching-home-construction/ | title=Approaching Home Construction | publisher=Aaron Gordon Construction Inc. | accessdate=13 February 2015 | author=Gordon, Aaron | deadurl=yes | archiveurl=https://web.archive.org/web/20150213114529/http://agcsf.com/approaching-home-construction/ | archivedate=13 February 2015 | df= }}</ref> Then the site is cleared, [[foundation (engineering)|foundations]] are laid and [[trench]]es for connection to services such as [[sewerage]], water, and electricity are established. If the house is wooden-framed, a framework is constructed to support the boards, siding and roof. If the house is of brick construction, then courses of bricks are laid to construct the walls. Floors, beams and internal walls are constructed as the building develops, with plumbing and wiring for water and electricity being installed as appropriate. Once the main structure is complete, internal fitting with lights and other fitments is done, and the house may be decorated and furnished with furniture, cupboards, carpets, curtains and other fittings.<ref>{{citation |url=https://books.google.com/books?id=xw3FBgoDfDwC&printsec=frontcover&dq=Building+a+House&hl=en&sa=X&ei=7T12UsbkHsG60QXmhoHICQ&ved=0CFAQ6AEwAg#v=onepage&q=Building%20a%20House&f=false|title=Building a House |author=JoAnn Early Macken |year=2009}}</ref><ref>{{cite web| url= http://allbuild.construction| title= Home Builder }} Friday, 23 February 2018</ref>{{better source|date=October 2013}} |
||
==Phases== |
==Phases== |
Revision as of 05:14, 23 February 2018
The examples and perspective in this article may not represent a worldwide view of the subject. (February 2015) |
House-building is the construction of houses.[1]
Overview
The process often starts with a planning stage in which plans are prepared by an architect and approved by the client and any regulatory authority.[2] Then the site is cleared, foundations are laid and trenches for connection to services such as sewerage, water, and electricity are established. If the house is wooden-framed, a framework is constructed to support the boards, siding and roof. If the house is of brick construction, then courses of bricks are laid to construct the walls. Floors, beams and internal walls are constructed as the building develops, with plumbing and wiring for water and electricity being installed as appropriate. Once the main structure is complete, internal fitting with lights and other fitments is done, and the house may be decorated and furnished with furniture, cupboards, carpets, curtains and other fittings.[3][4][better source needed]
Phases
External construction
- Shallow foundation
- Light-frame construction
- Domestic water system
- Electrical wiring
- Building envelope
- Retaining walls
Internal construction
- Ventilation
- Plumbing
- Air conditioning
- Electrical wiring
- Telephone wiring
- Cable wiring
- Ethernet wiring
- Insulation
- Flooring
- Wall
- Ceilings
Finishing construction
Criticism
Some have criticized the house-building industry. Mass house-builders can be risk averse, preferring cost-efficient building methods rather than adopting new technologies for improved building performance.[5] Traditional vernacular building methods that suit local conditions and climates can be dispensed with in favour of a generic 'cookie cutter' housing type.[5]
See also
References
- ^ C. J. Richardson (1873), House-building, from a cottage to a mansion, G.P. Putnam's Sons
- ^ Gordon, Aaron. "Approaching Home Construction". Aaron Gordon Construction Inc. Archived from the original on 13 February 2015. Retrieved 13 February 2015.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ JoAnn Early Macken (2009), Building a House
- ^ "Home Builder". Friday, 23 February 2018
- ^ a b Arieff, Allison (October 2, 2011). "Shifting the Suburban Paradigm". The New York Times. Retrieved 2013-11-03.
Further reading
- Wellings, Fred British Housebuilders: History & Analysis (2006) Blackwell Publishing ISBN 978-1-4051-4918-1