500 Capitol Mall: Difference between revisions
Appearance
Content deleted Content added
Rizessoc07 (talk | contribs) No edit summary |
Rizessoc07 (talk | contribs) |
||
Line 20: | Line 20: | ||
500 Capitol Mall is a 24-story 433,508 square foot high-rise under construction in downtown [[Sacramento, California]] with a 10-level, 800 stall parking garage. The building will consist of a 3-story lobby, ground floor retail, office space, and a 2-level penthouse restaurant and meeting facility.<ref>{{cite web|title=Emporis.com - 500 Capitol Mall|url=http://www.emporis.com/en/wm/bu/?id=streetparstreetnon-sacramento-ca-usa}}</ref> The structure will have a steel frame and will feature granite with precast panels on the exterior. The project is scheduled for completion in the 1st quarter of 2009. |
500 Capitol Mall is a 24-story 433,508 square foot high-rise under construction in downtown [[Sacramento, California]] with a 10-level, 800 stall parking garage. The building will consist of a 3-story lobby, ground floor retail, office space, and a 2-level penthouse restaurant and meeting facility.<ref>{{cite web|title=Emporis.com - 500 Capitol Mall|url=http://www.emporis.com/en/wm/bu/?id=streetparstreetnon-sacramento-ca-usa}}</ref> The structure will have a steel frame and will feature granite with precast panels on the exterior. The project is scheduled for completion in the 1st quarter of 2009. |
||
[[Image: |
[[Image:500CM031708.JPG|250px]] |
||
==Gallery== |
==Gallery== |
Revision as of 17:57, 17 March 2008
500 Capitol Mall | |
---|---|
General information | |
Status | Under construction |
Location | Sacramento, California, United States |
Coordinates | 38°34′41″N 121°30′08″W / 38.57806°N 121.50222°W |
Opening | Spring 2009 |
Height | |
Roof | 396 ft (121 m) |
Technical details | |
Floor count | 25 |
Design and construction | |
Architect(s) | E.M. Kado & Associates |
Developer | Tsakopoulos Investments |
500 Capitol Mall
500 Capitol Mall is a 24-story 433,508 square foot high-rise under construction in downtown Sacramento, California with a 10-level, 800 stall parking garage. The building will consist of a 3-story lobby, ground floor retail, office space, and a 2-level penthouse restaurant and meeting facility.[1] The structure will have a steel frame and will feature granite with precast panels on the exterior. The project is scheduled for completion in the 1st quarter of 2009.
Gallery
Project's Status
500 Capitol Mall Webcam
The project is currently in the steel erection phase and is on time for target completion date.
References
See also