METRORail Red Line: Difference between revisions
→Stations: rm possibly unfree images |
Added route map |
||
Line 26: | Line 26: | ||
|speed = |
|speed = |
||
|elevation = At grade before Hogan St. and at UH-Downtown, and again before Salem and after Bennington;<ref>http://www.piersystem.com/posted/1068/Chapter_2_DEIS_North_Corridor_0606.123777.pdf</ref> elevated rail between both pairs of landmarks |
|elevation = At grade before Hogan St. and at UH-Downtown, and again before Salem and after Bennington;<ref>http://www.piersystem.com/posted/1068/Chapter_2_DEIS_North_Corridor_0606.123777.pdf</ref> elevated rail between both pairs of landmarks |
||
|map = |
|map = {{Infobox rdt|Northline|navbar=1}} |
||
|}} |
|}} |
||
Revision as of 03:46, 29 April 2013
Overview | |||
---|---|---|---|
Status | Construction in progress | ||
Locale | Houston, Texas | ||
Termini |
| ||
Stations | 9 | ||
Service | |||
Type | Light rail | ||
System | METRORail | ||
Operator(s) | METRO | ||
History | |||
Opened | Scheduled for 2014[1] | ||
Technical | |||
Line length | 5.3 miles (9 km) | ||
Highest elevation | At grade before Hogan St. and at UH-Downtown, and again before Salem and after Bennington;[2] elevated rail between both pairs of landmarks | ||
|
The North/Red Line Extension[3][4] is a 5.3 mi (9 km) expansion of the existing Red Line route that will be designed, constructed, and operated by METRO in Houston, Texas.
Route
The northern terminus of this line is located at the Northline Transit Center on Fulton just north of Crosstimbers. Travelling south on Fulton, the line approaches reaches its next station at Melbourne, just north of I-610. After passing under the freeway, the next station is located at Graceland. Continuing down Fulton, the line approaches Cavalcade and Moody Park Stations. Just as the route veers onto Boundary does the line reach its next station. Turning south onto Main Street, the line stops at Quitman before reaching Burnett Station/Intermodal Facility. From there it will travel through the campus of the University of Houston–Downtown (UHD) prior to connecting the Red Line track at UH–Downtown station. The length of line south of Hogan Street will be located on an elevated structure. The remainder of the line will be at-grade.
Construction
Construction began July 2009, and was expected to continue until the line's opening in 2014,[1] though the opening date was later pushed back to 2015.[5] On December 8, 2011, the FTA announced the award of a $450 million grant from the New Starts transit program to fund construction of the North line.[5]
Stations
The following is a list of planned stations for this line, listed in order from north to south:[6]
North/Red Line Extension |
---|
Northline Transit Center Station/HCC |
Melbourne/North Lindale |
Lindale Park |
Cavalcade |
Moody Park |
Fulton/North Central |
Quitman/Near Northside |
Burnett Transit Center/Casa De Amigos |
UH–Downtown |
Expansion
A possibility for expansion of the line would take the route to George Bush Intercontinental Airport.[7]
References
- ^ a b http://www.myfoxhouston.com/dpp/news/local/100909-rail-lines-will-not-meet-oct-2013-deadline
- ^ http://www.piersystem.com/posted/1068/Chapter_2_DEIS_North_Corridor_0606.123777.pdf
- ^ http://www.gometrorail.org/go/doc/2491/406483/
- ^ http://www.metrosolutions.org/go/doc/1068/112135/
- ^ a b [foo "$http://www.rail.co/2011/12/08/900m-awarded-to-extend-houstons-light-rail-system/"]. Rail.co. December 8, 2011. Archived from the original on December 8, 2011. Retrieved December 9, 2011.
{{cite web}}
: Check|archiveurl=
value (help); External link in
(help)|title=
- ^ http://metrosolutions.org/posted/1068/North_w_statn_11x17_072908pdf.219063.pdf Retrieved 16-Jan-09
- ^ http://www.city-data.com/forum/houston/992322-metro-light-rail.html