Merchant aircraft carrier: Difference between revisions
m per WP:HYPHEN, sub-subsection 3, points 3,4,5, replaced: fully- → fully, typo(s) fixed: re-named → renamed, , → , , eg → e.g.; commas using AWB |
Mandrake079 (talk | contribs) New section 'Cargo arrangements'; minor edits; work in progress. |
||
Line 92: | Line 92: | ||
==Civilian status== |
==Civilian status== |
||
Despite their military appearance and combatant function, MACs were civilian ships that did not appear in the ''[[Navy List]]'' nor were they commanded by commissioned officers: this unusual status is one of their defining characteristics. The hybrid nature of the MACs raised from the outset the question of whether they would be commissioned warships like the new [[escort carriers]], or if they would operate as merchant ships under the Red Ensign like the earlier [[CAM Ship|CAM ships]]. The Admiralty's preference was to operate them as regular warships but it soon became clear that there were not enough personnel available to man them to naval standards without causing serious shortfalls in other areas, in particular the large numbers of escort carriers that would soon arrive.<ref>TNA:PRO, FO 371/32584, Waldock to Steel dated 27 December 1942.</ref> The Admiralty and Ministry of War Transport therefore agreed that the MACs would be civilian-manned. |
Despite their military appearance and combatant function, MACs were civilian ships that did not appear in the ''[[Navy List]]'' nor were they commanded by commissioned officers: this unusual status is one of their defining characteristics. The hybrid nature of the MACs raised from the outset the question of whether they would be commissioned warships like the new [[escort carriers]], or if they would operate as merchant ships under the Red Ensign like the earlier [[CAM Ship|CAM ships]]. The Admiralty's preference was to operate them as regular warships but it soon became clear that there were not enough personnel available to man them to naval standards without causing serious shortfalls in other areas, in particular the large numbers of escort carriers that would soon arrive.<ref>TNA:PRO, FO 371/32584, Waldock to Steel dated 27 December 1942.</ref> The Admiralty and Ministry of War Transport therefore agreed that the MACs would be civilian-manned. Serious reservations about the proposed civilian status were raised, however, by Foreign Office officials, who were concerned that the ships would be ''de-facto'' warships under international law but, without the protection afforded by the 1907 [[Hague Conventions of 1899 and 1907|Hague Convention]] which applied only to members of the armed forces, their civilian crews would be liable to be treated as unlawful combatants, or ''[[francs-tireurs]]''.<ref>TNA:PRO, FO 371/32584, Construction of Merchant Ship Aircraft Carriers, Steel to Dean dated 29 October 1942.</ref> The potential for such action had been clearly demonstrated by the execution in 1916 of [[Captain Fryatt]], for attempting to ram a U-boat with his cross-Channel ferry. The risk to MAC crews was considered so great that it was explicitly put before the War Cabinet: |
||
::"The greater the effect of air action on the U-boat campaign, the more the enemy may be tempted to try to damage the morale of M.A.C. crews by court martialling and shooting any Merchant Service personnel they may capture from such ships."<ref name="TNA FO371/32584(271042)"/> |
::"The greater the effect of air action on the U-boat campaign, the more the enemy may be tempted to try to damage the morale of M.A.C. crews by court martialling and shooting any Merchant Service personnel they may capture from such ships."<ref name="TNA FO371/32584(271042)"/> |
||
Line 100: | Line 100: | ||
==Ship details == |
==Ship details == |
||
The new-build grain ship MACs were based on the Ministry of War Transport's standard tramp hull which could just accommodate the Admiralty's revised requirement for a flight deck of not less than 390 ft. length and 62 ft. breadth: they were eventually built with flight decks of between 413 ft. and 424 ft. The standard design used for the new-build tankers enabled a longer flight deck of approximately 460 ft. with minor variations between individual ships.<ref name=lenaghan /> An important enhancement was specified for the MACs' machinery. A standard diesel tramp engine developed 2500 |
The new-build grain ship MACs were based on the Ministry of War Transport's standard tramp hull which could just accommodate the Admiralty's revised requirement for a flight deck of not less than 390 ft. length and 62 ft. breadth: they were eventually built with flight decks of between 413 ft. and 424 ft. The standard design used for the new-build tankers enabled a longer flight deck of approximately 460 ft. with minor variations between individual ships.<ref name=lenaghan /> An important enhancement was specified for the MACs' machinery. A standard diesel tramp engine developed 2500 BHP to give a service speed of 11 kts. but to provide some margin for flying operations, all the new-build MACs were fitted with engines rated at 3300 BHP which, in the grain ships, produced a speed of about 12 kts. The new-build tankers with their higher displacements were still capable of 11 kts. while the pre-existing 'Triple Twelves' had a service speed of about 10.5 kts.<ref name=lenaghan /> The most obvious modification was the flight deck and its supporting structure which was arranged in sections (three on the grain ships; four in the case of tankers) with expansion joints between each.<ref name=lenaghan /> The flight deck was built at the level that would normally have been occupied by the wheelhouse and in the 'Triple Twelves' this entailed removal of the existing wheelhouse and the funnel. The space immediately under the flight deck was utilised for the arrester gear mechanisms, four wires to each MAC with an additional unit fitted to the tankers to operate the trickle wire and safety barrier.<ref name=lenaghan /> A small island structure contained the bridge and wheelhouse and, in the tanker MACs, a chartroom that could be used as a pilots' briefing room. Less apparent modifications included; accommodation for 107 crew (about 50 more than normal); improved internal subdivision; additional ventilation, including exhaust arrangements that could be adjusted to vent to the leeward side; changes to lifeboat positions; and magazines for the safe stowage of bombs, depth charges, ammunition and pyrotechnics.<ref name=lenaghan /> There were minor variations between the types. In the grain MACs, the armament [[sponsons]] or '[[zareba]]s' could not project outboard of the moulded line of the hull which necessitated them encroaching onto the flight deck area so that the ship would not be prevented from using commercial berths, but this constraint did not apply to the tankers whose zarebas were extended outboard of the side. One centre cargo tank in each tanker was adapted for the carriage of aircraft fuel (or '[[Avgas]]') but in the grain ships this necessitated a special compartment containing two pressurised fuel tanks, together with a control room and associated piping.<ref name=lenaghan /> |
||
The most significant difference between the grain ship and tanker MACs was the provision of hangar space within the grain ships. The three after holds were converted to provide a hangar 142 ft. long, 38 ft. wide to a height of 24 ft. in which the ship's full complement of four [[Fairey Swordfish|Swordfish]] aircraft could be stowed with wings folded.<ref name=lenaghan /> An elevator platform could lift a fully loaded aircraft from hangar to deck level in less than a minute.<ref name=lenaghan /> It was impracticable to fit tanker MACs with a hangar as this would have entailed very extensive structural alterations and a significant reduction in cargo capacity. Tanker MACs were limited to embarking three aircraft which had to be kept on deck: parked aircraft had to be moved to the forward end when other aircraft were landing on, and a collapsible safety barrier was fitted to prevent collisions. Hinged side screens or 'palisades' were fitted around the aft end of the flight deck to provide weather protection for parked aircraft but with only limited effect.<ref name=brand>{{cite book |
The most significant difference between the grain ship and tanker MACs was the provision of hangar space within the grain ships. The three after holds were converted to provide a hangar 142 ft. long, 38 ft. wide to a height of 24 ft. in which the ship's full complement of four [[Fairey Swordfish|Swordfish]] aircraft could be stowed with wings folded.<ref name=lenaghan /> An elevator platform could lift a fully loaded aircraft from hangar to deck level in less than a minute.<ref name=lenaghan /> It was impracticable to fit tanker MACs with a hangar as this would have entailed very extensive structural alterations and a significant reduction in cargo capacity. Tanker MACs were limited to embarking three aircraft which had to be kept on deck: parked aircraft had to be moved to the forward end when other aircraft were landing on, and a collapsible safety barrier was fitted to prevent collisions. Hinged side screens or 'palisades' were fitted around the aft end of the flight deck to provide weather protection for parked aircraft but with only limited effect.<ref name=brand>{{cite book |
||
Line 118: | Line 118: | ||
The net result of the modifications was a reduction in cargo capacity of about 10 per cent in the case of the tankers but almost 30 per cent for the grain ships, the higher figure on account of the space taken up by the hangar.<ref name=lenaghan /> The modifications themselves were conceptually simple and with standardised designs and extensive use (about 51 per cent by weight of steel) of prefabricated components, the average conversion time was just over five months, but there were significant differences between the average time required to convert new-builds (about 14 weeks) and existing ships (about 27 weeks).<ref name=lenaghan /> There were wide variations within groups; the first 'Triple Twelve', ''Rapana'' was converted in five months while the final one, ''Macoma'', took ten months.<ref name=lenaghan /> Delays arose through a variety of reasons including labour relations and conflicting priorities in the shipyards, but the supply of arrester gear which was also in high demand for the escort carrier programme was a particular bottleneck that limited the rate at which MACs could be completed.<ref>TNA:PRO, ADM 1/15553, First Lord of the Admiralty to War Cabinet dated 4 May 1943.</ref><ref>University of Glasgow Archive Services (UGAS), DC 035/43, Papers of Sir James Lithgow, 1883-1952; Shipbuilder and Industrialist: Lithgow to Powell dated 25 April 1942.</ref><ref>UGAS, DC 035/66, Lithgow to Wake-Walker dated 14 April 1943.</ref><ref>NMM, Ship's Cover 667Y, Lenaghan to Bartlett dated 6 August 1942</ref> |
The net result of the modifications was a reduction in cargo capacity of about 10 per cent in the case of the tankers but almost 30 per cent for the grain ships, the higher figure on account of the space taken up by the hangar.<ref name=lenaghan /> The modifications themselves were conceptually simple and with standardised designs and extensive use (about 51 per cent by weight of steel) of prefabricated components, the average conversion time was just over five months, but there were significant differences between the average time required to convert new-builds (about 14 weeks) and existing ships (about 27 weeks).<ref name=lenaghan /> There were wide variations within groups; the first 'Triple Twelve', ''Rapana'' was converted in five months while the final one, ''Macoma'', took ten months.<ref name=lenaghan /> Delays arose through a variety of reasons including labour relations and conflicting priorities in the shipyards, but the supply of arrester gear which was also in high demand for the escort carrier programme was a particular bottleneck that limited the rate at which MACs could be completed.<ref>TNA:PRO, ADM 1/15553, First Lord of the Admiralty to War Cabinet dated 4 May 1943.</ref><ref>University of Glasgow Archive Services (UGAS), DC 035/43, Papers of Sir James Lithgow, 1883-1952; Shipbuilder and Industrialist: Lithgow to Powell dated 25 April 1942.</ref><ref>UGAS, DC 035/66, Lithgow to Wake-Walker dated 14 April 1943.</ref><ref>NMM, Ship's Cover 667Y, Lenaghan to Bartlett dated 6 August 1942</ref> |
||
The 'triple Twelves' retained their original names, but the new-builds were prefixed "[[Empire ship|Empire]]" in accordance with the policy for ships owned by the [[Ministry of War Transport]] and names that began with "Mac-", in a reference to their designation as MACs. ''[[Empire MacKendrick]]'' which was originally to have been named ''Empire MacKenzie'' had the unusual distinction of being renamed while still under construction in tribute to ''[[HMS Audacity]]'', whose captain, Commander D W McKendrick RN, had been killed when she was sunk on convoy escort duty in 1941.<ref>TNA:PRO, ADM 1/15553, MAC Ship Programme dated 5 October 1943.</ref><ref name=lenaghan /> Eventually, to avoid confusion with ordinary merchant ships, the Admiralty formally directed that |
The 'triple Twelves' retained their original names, but the new-builds were prefixed "[[Empire ship|Empire]]" in accordance with the policy for ships owned by the [[Ministry of War Transport]] and names that began with "Mac-", in a reference to their designation as MACs. ''[[Empire MacKendrick]]'' which was originally to have been named ''Empire MacKenzie'' had the unusual distinction of being renamed while still under construction in tribute to ''[[HMS Audacity]]'', whose captain, Commander D W McKendrick RN, had been killed when she was sunk on convoy escort duty in 1941.<ref>TNA:PRO, ADM 1/15553, MAC Ship Programme dated 5 October 1943.</ref><ref name=lenaghan /> Eventually, to avoid confusion with ordinary merchant ships, the Admiralty formally directed that MACs should be designated 'MAC Ship' in all correspondence.<ref>TNA:PRO, MT 59/1966, Signal from Admiralty dated 22 September 1943.</ref> |
||
==Cargo Arrangements== |
|||
Although the most distinctive feature of MACs is their aircraft carrier function, they were conceived at at time when a shortage of shipping capacity threatened to undermine the Allied invasion of North Africa and beyond, and careful planning was needed to maximise their military effectiveness with as little detriment as possible to the carriage of cargo.<ref>Redford, Duncan, 'The March 1943 Crisis in the Battle of the Atlantic: Myth and Reality' in ''History: The Journal of the Historical Association'', Vol. 92, No. 305 (January 2007), p. 80.</ref> In their trading role MACs operated under the aegis of the Ministry of War Transport, with day-to-day management falling to their owners or allotted shipping companies, while control of military aspects fell to the Admiralty, with a new section (the Trade Division [[DEMS]] Air Section) specially set up to act as co-ordinating authority.<ref>TNA:PRO, ADM 1/14179, Draft Acquaint and minutes dated 3–18 March 1943.</ref> The MACs operated on the North Atlantic route primarily in support of the [[ON convoys|'ON']] and [[HX convoys|'HX']] series of convoys. An alternative plan to operate tanker MACs between the United Kingdom and Curacao was rejected because convoys on that route were too fast.<ref name="TNA ADM1/13087(040343)">TNA:PRO, ADM 1/13087, Minute by DTD dated 4 March 1943.</ref> Tankers on the North Atlantic route ordinarily loaded at New York but this was undesirable for the MACs because it would have been military wasteful to run them between the ON/HX landfall port of [[Halifax, Nova Scotia]] and [[New York]] where convoys were already under the umbrella of land-based aircraft. An 'oil pool' was therefore established at Halifax specifically to enable the tankers MACs to load there, while grain MACs were already able to use the port's pre-existing bulk loading facility.<ref name="TNA ADM1/13087(040343)" /> The [[Firth of Clyde]] was initially designated as the UK terminus for all MAC cargoes because of its superior aviation training facilities.<ref name="TNA ADM1/13087(040343)" /> On discovering that it would take more than a week to unload a single ship at the un-modernised facility in Glasgow, it was decided that grain MACs would discharge at [[Alexandra Dock, Liverpool]], where two grain ships could be unloaded simultaneously in thirty-six hours.<ref>TNA:PRO, ADM 1/13087, Admiralty to Ministry of War Transport dated 7 May 1943.</ref>. Tanker MACs normally discharged on the Clyde, with the Mersey as an alternative. |
|||
==Aviation== |
|||
==Air party== |
==Air party== |
Revision as of 10:32, 31 October 2014
Merchant aircraft carrier (MAC) ships were bulk grain ships and oil tankers fitted with flight decks enabling them to operate anti-submarine aircraft in support of convoys during the Battle of the Atlantic. Despite their quasi-military function, MACs retained their mercantile status, continued to carry cargo and operated under civilian command. MACs began entering service in May 1943 and although originally intended as an interim measure pending the introduction of escort carriers, they remained operational until the end of the war in Europe.[1][2]
Development
Various schemes for converting merchant ships into aircraft carriers had been suggested to the Admiralty as far back as the First World War but none seem to have been taken up.[3] In 1940, Captain M S Slattery RN, Director of Air Material at the Admiralty, resurrected the idea as a follow-up to the CAM Ship project.[4][5] Slattery proposed fitting a flight deck equipped with two arrester wires and a safety barrier onto an existing merchant ship hull. The resulting 'auxiliary fighter carrier' would be capable of operating six Hurricane fighters while retaining its cargo-carrying ability. The stumbling block for Slattery's proposal turned out to be objections from the Ministry of Supply that combining the merchant and aircraft carrier roles would be too complicated.[5] While this would turn out to be over-stated, it seems to have had the effect of diverting attention away from the idea of hybrid merchant-warships towards the alternative of converting merchant ships into fully-fledged warships designated 'auxiliary aircraft carriers', the first of which, converted from the captured German cargo ship Hannover, entered service as Empire Audacity (later HMS Audacity) in June 1941.[5][6]
The hybrid concept re-emerged early in 1942 when, in the face of mounting losses from U-Boat attacks, it became apparent that escort carriers building in the US could not be delivered quickly enough in the numbers required.[7] Various people have been credited with re-inventing the idea, including Captain B B Schofield RN, Director Trade Division, and Mr John Lamb, Marine Technical Manager of the Anglo-Saxon Petroleum Company.[8][9][10] Sir James Lithgow, Controller of Merchant Shipbuilding and Repair and joint-owner of Lithgows Ltd, the Clyde-based shipbuilders, also helped overcome Admiralty reservations about MACs. Lithgow is said to have sketched a rough design for one on the back of an envelope and offered to convert two ships about to be built at his family's shipyard on condition that "I am not interfered with by the Admiralty".[1] While the timing of Lithgow's possibly apocryphal intervention is uncertain, his deputy, Sir Amos Ayre, the Director of Merchant Shipbuilding, was certainly discussing the requirements for MACs by May 1942.[11] Ayre himself credits Sir Douglas Thomson of Ben Line and the Ministry of War Transport with having first suggested the idea.[9]
There was some initial resistance to the MAC concept, in particular through concerns about operating aircraft from short, relatively slow ships. The Admiralty considered that a flight deck length of 460 ft. was needed for safe take-offs and landings and a speed of 15 kts. to provide a sufficient margin over convoy speeds and they were especially doubtful that tankers, with their low freeboards and volatile cargoes, could be utilised.[5][12] As the U-Boat situation worsened, however, such concerns were out-weighed by the urgent need to provide convoy air support and once it was accepted that the grain ship variant at least could be made to work, the Admiralty became more enthusiastic about the project. By September 1942, the Admiralty was asking for 'about 50' MACs to be made available, to allow one to be included in every North Atlantic convoy and in October the requirement was set at 52.[13][14] This ambitious target had been scaled back to 40 by the time the MAC project was formally endorsed by the War Cabinet in October 1942 but it was apparent that even this reduced number could not be produced sufficiently quickly without American help.[12][15] The US was therefore asked to begin construction of 30 MACs to be delivered during the first half of 1943, but a Navy Department committee specially formed to consider the request turned it down because of concerns about the experimental nature of the ships.[16][17] In the event, all the MACs were built and/or converted in British shipyards.
Conversion programme
The first two MACs were ordered in June 1942 from the Burntisland Shipbuilding Company on the Firth of Forth and William Denny & Brothers of Dumbarton. These ships, which were not strictly conversions but brand-new grain ships that had not yet been laid down, would eventually enter service as Empire MacAlpine and Empire MacAndrew respectively.[18] Empire MacAlpine was launched on 23 December 1942 and completed more-or-less on schedule on 21 April 1943. Five more new-build grain ships, Empire MacAndrew, Empire MacRae, Empire MacCallum, Empire MacKendrick and Empire MacDermott followed at approximately two-month intervals, Empire MacDermott entering service in March 1944.
By late September 1942 it was finally agreed that tanker-MACs could be operated safely subject to various limitations about the cargoes they would be allowed to carry. Four new-build tankers were scheduled for conversion but work on these did not start until May 1943. Empire MacKay entered service in October 1943, followed at intervals by Empire MacCabe, Empire MacMahon and Empire MacColl in November 1943. Additional hulls were still needed, however, and it was decided that existing tankers would have to be withdrawn from trade. The most efficient way to approach the task of converting these was to select ships of similar design and, at the beginning of 1943, the Anglo-Saxon Petroleum Company, which had actively promoted the MAC concept, offered up its entire fleet of British-registered 'Triple Twelve' tankers (sometimes referred to as the Rapana class) for government charter.[19][20][21]
The desirability of converting foreign-owned tankers was also considered and in January 1943 the Ministry of War Transport asked the Norwegian government-in-exile if the modern Norwegian tanker B.P. Newton could be converted to a MAC under British command. The initial response was not helpful with Norway insisting on financial arrangements that War Transport officials described as "wholly unreasonable as between allies", but although these were later ameliorated, the proposal eventually foundered because the design effort was judged too much for what would have been a one-off conversion.[22][23] At about the same time however, a further three tankers of the same class as the Anglo-Saxon 'Triple Twelves' were identified operating under Dutch registry (Anglo-Saxon Petroleum was a subsidiary of Royal Dutch Shell). The Netherlands authorities approved the British request but on condition that the ships, as MACs, would fly the Dutch flag and be under Dutch civilian command to which the Admiralty, citing potential language difficulties, only reluctantly agreed.[24][25] In the event, only two of the Dutch ships were taken up as MACs but these, Gadila and Macoma, crewed entirely by Dutch merchant seamen and with aircraft flights drawn from the Royal Netherlands Navy-manned 860 Naval Air Squadron would have the distinction of becoming the Netherlands' first aircraft carriers.
Civilian status
Despite their military appearance and combatant function, MACs were civilian ships that did not appear in the Navy List nor were they commanded by commissioned officers: this unusual status is one of their defining characteristics. The hybrid nature of the MACs raised from the outset the question of whether they would be commissioned warships like the new escort carriers, or if they would operate as merchant ships under the Red Ensign like the earlier CAM ships. The Admiralty's preference was to operate them as regular warships but it soon became clear that there were not enough personnel available to man them to naval standards without causing serious shortfalls in other areas, in particular the large numbers of escort carriers that would soon arrive.[26] The Admiralty and Ministry of War Transport therefore agreed that the MACs would be civilian-manned. Serious reservations about the proposed civilian status were raised, however, by Foreign Office officials, who were concerned that the ships would be de-facto warships under international law but, without the protection afforded by the 1907 Hague Convention which applied only to members of the armed forces, their civilian crews would be liable to be treated as unlawful combatants, or francs-tireurs.[27] The potential for such action had been clearly demonstrated by the execution in 1916 of Captain Fryatt, for attempting to ram a U-boat with his cross-Channel ferry. The risk to MAC crews was considered so great that it was explicitly put before the War Cabinet:
- "The greater the effect of air action on the U-boat campaign, the more the enemy may be tempted to try to damage the morale of M.A.C. crews by court martialling and shooting any Merchant Service personnel they may capture from such ships."[15]
The War Cabinet ordered a review of the situation but the manning difficulties could not be resolved. The Foreign Office reluctantly agreed that the MACs would have to operate under the Red Ensign, provided that the merchant seamen and their unions were made aware of the risks involved, and that every possible precaution would be taken to ensure that the men did not fall into enemy hands.[28] In the event, there is little to suggest that the MACs' crews were ever formally notified that they might be at special risk. There is evidence, however, that the authorities remained sensitive about the status of MAC ships which were specifically excluded from the publicity that was arranged for other 'special service' merchant ships, e.g. rescue ships.[29] As late as September 1944, masters were reminded to point out to their crews the need to maintain secrecy about the MACs' operations and functions.[30]
Ship details
The new-build grain ship MACs were based on the Ministry of War Transport's standard tramp hull which could just accommodate the Admiralty's revised requirement for a flight deck of not less than 390 ft. length and 62 ft. breadth: they were eventually built with flight decks of between 413 ft. and 424 ft. The standard design used for the new-build tankers enabled a longer flight deck of approximately 460 ft. with minor variations between individual ships.[9] An important enhancement was specified for the MACs' machinery. A standard diesel tramp engine developed 2500 BHP to give a service speed of 11 kts. but to provide some margin for flying operations, all the new-build MACs were fitted with engines rated at 3300 BHP which, in the grain ships, produced a speed of about 12 kts. The new-build tankers with their higher displacements were still capable of 11 kts. while the pre-existing 'Triple Twelves' had a service speed of about 10.5 kts.[9] The most obvious modification was the flight deck and its supporting structure which was arranged in sections (three on the grain ships; four in the case of tankers) with expansion joints between each.[9] The flight deck was built at the level that would normally have been occupied by the wheelhouse and in the 'Triple Twelves' this entailed removal of the existing wheelhouse and the funnel. The space immediately under the flight deck was utilised for the arrester gear mechanisms, four wires to each MAC with an additional unit fitted to the tankers to operate the trickle wire and safety barrier.[9] A small island structure contained the bridge and wheelhouse and, in the tanker MACs, a chartroom that could be used as a pilots' briefing room. Less apparent modifications included; accommodation for 107 crew (about 50 more than normal); improved internal subdivision; additional ventilation, including exhaust arrangements that could be adjusted to vent to the leeward side; changes to lifeboat positions; and magazines for the safe stowage of bombs, depth charges, ammunition and pyrotechnics.[9] There were minor variations between the types. In the grain MACs, the armament sponsons or 'zarebas' could not project outboard of the moulded line of the hull which necessitated them encroaching onto the flight deck area so that the ship would not be prevented from using commercial berths, but this constraint did not apply to the tankers whose zarebas were extended outboard of the side. One centre cargo tank in each tanker was adapted for the carriage of aircraft fuel (or 'Avgas') but in the grain ships this necessitated a special compartment containing two pressurised fuel tanks, together with a control room and associated piping.[9]
The most significant difference between the grain ship and tanker MACs was the provision of hangar space within the grain ships. The three after holds were converted to provide a hangar 142 ft. long, 38 ft. wide to a height of 24 ft. in which the ship's full complement of four Swordfish aircraft could be stowed with wings folded.[9] An elevator platform could lift a fully loaded aircraft from hangar to deck level in less than a minute.[9] It was impracticable to fit tanker MACs with a hangar as this would have entailed very extensive structural alterations and a significant reduction in cargo capacity. Tanker MACs were limited to embarking three aircraft which had to be kept on deck: parked aircraft had to be moved to the forward end when other aircraft were landing on, and a collapsible safety barrier was fitted to prevent collisions. Hinged side screens or 'palisades' were fitted around the aft end of the flight deck to provide weather protection for parked aircraft but with only limited effect.[31]
The net result of the modifications was a reduction in cargo capacity of about 10 per cent in the case of the tankers but almost 30 per cent for the grain ships, the higher figure on account of the space taken up by the hangar.[9] The modifications themselves were conceptually simple and with standardised designs and extensive use (about 51 per cent by weight of steel) of prefabricated components, the average conversion time was just over five months, but there were significant differences between the average time required to convert new-builds (about 14 weeks) and existing ships (about 27 weeks).[9] There were wide variations within groups; the first 'Triple Twelve', Rapana was converted in five months while the final one, Macoma, took ten months.[9] Delays arose through a variety of reasons including labour relations and conflicting priorities in the shipyards, but the supply of arrester gear which was also in high demand for the escort carrier programme was a particular bottleneck that limited the rate at which MACs could be completed.[32][33][34][35]
The 'triple Twelves' retained their original names, but the new-builds were prefixed "Empire" in accordance with the policy for ships owned by the Ministry of War Transport and names that began with "Mac-", in a reference to their designation as MACs. Empire MacKendrick which was originally to have been named Empire MacKenzie had the unusual distinction of being renamed while still under construction in tribute to HMS Audacity, whose captain, Commander D W McKendrick RN, had been killed when she was sunk on convoy escort duty in 1941.[36][9] Eventually, to avoid confusion with ordinary merchant ships, the Admiralty formally directed that MACs should be designated 'MAC Ship' in all correspondence.[37]
Cargo Arrangements
Although the most distinctive feature of MACs is their aircraft carrier function, they were conceived at at time when a shortage of shipping capacity threatened to undermine the Allied invasion of North Africa and beyond, and careful planning was needed to maximise their military effectiveness with as little detriment as possible to the carriage of cargo.[38] In their trading role MACs operated under the aegis of the Ministry of War Transport, with day-to-day management falling to their owners or allotted shipping companies, while control of military aspects fell to the Admiralty, with a new section (the Trade Division DEMS Air Section) specially set up to act as co-ordinating authority.[39] The MACs operated on the North Atlantic route primarily in support of the 'ON' and 'HX' series of convoys. An alternative plan to operate tanker MACs between the United Kingdom and Curacao was rejected because convoys on that route were too fast.[40] Tankers on the North Atlantic route ordinarily loaded at New York but this was undesirable for the MACs because it would have been military wasteful to run them between the ON/HX landfall port of Halifax, Nova Scotia and New York where convoys were already under the umbrella of land-based aircraft. An 'oil pool' was therefore established at Halifax specifically to enable the tankers MACs to load there, while grain MACs were already able to use the port's pre-existing bulk loading facility.[40] The Firth of Clyde was initially designated as the UK terminus for all MAC cargoes because of its superior aviation training facilities.[40] On discovering that it would take more than a week to unload a single ship at the un-modernised facility in Glasgow, it was decided that grain MACs would discharge at Alexandra Dock, Liverpool, where two grain ships could be unloaded simultaneously in thirty-six hours.[41]. Tanker MACs normally discharged on the Clyde, with the Mersey as an alternative.
Aviation
Air party
The 'air party' was the Fleet Air Arm personnel who flew and supported the aircraft. It consisted of an air staff officer (lieutenant commander), the aircrew, a doctor, a batsman (landing control officer), ten ship's gunners, four signalmen, and three or four able seamen. Under Board of Trade regulations and to comply with the Geneva Convention they were signed onto the ship's articles as merchant ship officers and ratings. Officially they were entitled to the nominal sum of 1 shilling per month on articles, but in practice this was rarely if ever paid. The Merchant Navy part of the crew might have an extra mate and/or wireless operator but was otherwise unchanged.
The aircrew on each ship formed one flight of the MAC-ship wing which consisted of 836 and 860 Naval Air Squadrons, based at HMS Shrike, RNAS Maydown, near Derry in Northern Ireland. 836 NAS was manned by the Royal Navy and 860 NAS was manned by Dutch personnel and assigned to the two Dutch MAC-ships.
An informal, illegal benefit for aircrews was their ability to smuggle contraband without paying import duties. Aircraft were flown off to RNAS Maydown laden with goods which were usually unloaded and hidden before HM Customs could intervene.[1]
Aircraft
Two aircraft types were considered for use on MAC ships: the Swordfish and the Vought SB2U Vindicator (known in British service as the "Chesapeake"). Fifty Chesapeakes were delivered, but after a three-month trial, they were deemed unsuitable by the Admiralty and relegated to a training role.
In practice, the MAC ships were successful. The apparently antiquated, but robust, Swordfish aircraft were suited to the conditions and their patrols were very effective. They flew more than 4,000 sorties in all. Wartime records show that no convoy with an accompanying MAC ship ever lost a vessel to U-boats, nor was any MAC ship lost.[1]
Ships
New-build grain carriers
Approximately 8,000 tons deep load, 12 knots, 4 aircraft, crew 107, launched December 1942-January 1944. Equipped with hangar and lift. Armament: 1 x single 4 in (102 mm) QF MK IV, 2 x single 40 mm Bofors, 4 x single 20 mm Oerlikon cannons.[42][43]
- MV Empire MacAlpine
- MV Empire MacAndrew
- MV Empire MacCallum
- MV Empire MacDermott
- MV Empire MacKendrick
- MV Empire MacRae
New-build oil tankers
Approximately 9,000 tons deep load, 11 knots, 3 aircraft, crew 122, launched May–July 1943. BP tankers. No hangar and lift; aircraft maintained and stored on deck. Armament: 1 x single 4 in (102 mm) QF MK IV, 8 x single 20 mm Oerlikon cannons.[42][43]
'Triple Twelve' oil tankers
8,000 tons standard, 16,000 tons deep load, 12 knots, 3 aircraft, crew 118 (64 RN plus 54 MN), converted 1942-44. Anglo-Saxon Petroleum Company tankers. No hangar and lift; aircraft maintained and stored on deck. Armament: 1 x single 4 in (102 mm) QF MK IV, 2 x single 40 mm Bofors, 6 x single 20 mm Oerlikon cannons.[42][43]
- MV Acavus
- MV Adula
- MV Alexia
- MV Amastra
- MV Ancylus: operated Swordfish II of ‘O’ Flight, 860 NAS
- MV Gadila: operated under the Dutch ensign with Swordfish of 'S' Flight, 860 NAS
- MV Macoma: operated under the Dutch ensign with Swordfish of 'O' (later 'F') Flight, 860 NAS
- MV Miralda
- MV Rapana: operated Swordfish II of ‘L’ Flight, 836 NAS
Amastra and Ancylus ceased operating Swordfish in late 1944, the empty decks often being used to ferry aircraft from the USA to the UK.[43]
See also
References
- ^ a b c d Wragg, David (2005). The Escort Carrier in World War II: Combustible, Vulnerable, Expendable!. Barnsley, UK: Pen & Sword Maritime. pp. 12–24. ISBN 1-84415-220-0.
{{cite book}}
: Cite has empty unknown parameter:|coauthors=
(help) - ^ The National Archives: Public Record Office (TNA:PRO), ADM 1/17628, Voyage Report - mv Alexia
- ^ TNA:PRO, ADM 1/14950, First Lord of the Admiralty to Mr G Klass dated 30 July1943
- ^ TNA:PRO, ADM 234/383, The Development of British Naval Aviation, Volume I, p. 152.
- ^ a b c d Friedman, Norman (1988). British Carrier Aviation: The Evolution of the Ships and their Aircraft. London, UK: Conway Maritime Press. pp. 179–181. ISBN 0-85177-488-1.
{{cite book}}
: Cite has empty unknown parameter:|coauthors=
(help) - ^ Roskill, Captain S.W. (1954). The War at Sea 1939-1945, Volume I. London, UK: HMSO. p. 477.
{{cite book}}
: Cite has empty unknown parameter:|coauthors=
(help) - ^ TNA:PRO, ADM 234/384, The Development of British Naval Aviation, Volume II, p. 110.
- ^ Schofield, B. B., 'The Defeat of the U-Boats During World War II' in Journal of Contemporary History Vol. 16, No. 1 (January 1981), p. 125.
- ^ a b c d e f g h i j k l m n Lenaghan, J (1983). Selected Papers on British Warship Design in World War II. London, UK: Conway Maritime Press. pp. 43–62. ISBN 0-85177-284-6.
{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - ^ Poolman, Kenneth (1972). Escort Carrier 1941-1945: An Account of British Escort carriers in Trade Protection. London, UK: Ian Allan.
{{cite book}}
: Cite has empty unknown parameter:|coauthors=
(help) - ^ National Maritime Museum (NMM), Ship's Cover 667Y, Escort Carriers Converted from Grain Ships etc.
- ^ a b TNA:PRO, MT 59/1966, Minute dated 29 June 1942
- ^ TNA:PRO, MT 59/1966, Admiralty to Ministry of War Transport dated 1 September 1942.
- ^ NMM, Ship's Cover 667Y, Controller to ACNS(T) dated 1 October 1942.
- ^ a b TNA:PRO, FO 371/32584, Construction of Merchant Aircraft Carriers: Joint Memorandum by First Lord of the Admiralty and Minister of War Transport dated 27 October 1942.
- ^ TNA:PRO, CAB 65/28.17, War Cabinet Conclusions 147(42) of 29 October 1942.
- ^ TNA:PRO, MT 59/1966, BADW to Admiralty dated 27 November 1942.
- ^ NMM, Ship's Cover 667Y, DMB to DNC dated 9 June 1942.
- ^ TNA:PRO, MT 59/1966, Minute dated 12 November 1942.
- ^ TNA:PRO, MT 59/1966, Anglo-Saxon to Ministry of War Transport dated 2 February 1943.
- ^ Howarth, Stephen (1992). Sea Shell: The Story of Shell's British Tanker Fleets 1892-1992. London, UK: Thomas Reed Publications Limited. pp. 114–119. ISBN 0-947637-32-X.
{{cite book}}
: Cite has empty unknown parameter:|coauthors=
(help) - ^ TNA:PRO, MT 59/1494, Minute dated 19 January 1943.
- ^ TNA:PRO, MT 59/1494, Edelsten to Hurcomb dated 11 February 1943.
- ^ TNA:PRO, MT 59/1494, Minute dated 17 February 1943.
- ^ TNA:PRO, MT 59/1494, Hurcomb to Moore dated 11 May 1943.
- ^ TNA:PRO, FO 371/32584, Waldock to Steel dated 27 December 1942.
- ^ TNA:PRO, FO 371/32584, Construction of Merchant Ship Aircraft Carriers, Steel to Dean dated 29 October 1942.
- ^ TNA:PRO, FO 371/32584, Le Rougetel to Waldock dated 12 January 1943.
- ^ TNA:PRO, ADM 1/16111, Minute by DTD dated 18 September 1944.
- ^ TNA:PRO, ADM 1/16111, Admiralty to the Masters mv Acavus, Amastra, Ancylus, Rapana dated 25 September 1944.
- ^ Brand, Stanley (2009). Achtung Swordfish!: Merchant Aircraft Carriers. Leeds, UK: Propagator Press. ISBN 9781-86029-805-9.
{{cite book}}
: Cite has empty unknown parameter:|coauthors=
(help) - ^ TNA:PRO, ADM 1/15553, First Lord of the Admiralty to War Cabinet dated 4 May 1943.
- ^ University of Glasgow Archive Services (UGAS), DC 035/43, Papers of Sir James Lithgow, 1883-1952; Shipbuilder and Industrialist: Lithgow to Powell dated 25 April 1942.
- ^ UGAS, DC 035/66, Lithgow to Wake-Walker dated 14 April 1943.
- ^ NMM, Ship's Cover 667Y, Lenaghan to Bartlett dated 6 August 1942
- ^ TNA:PRO, ADM 1/15553, MAC Ship Programme dated 5 October 1943.
- ^ TNA:PRO, MT 59/1966, Signal from Admiralty dated 22 September 1943.
- ^ Redford, Duncan, 'The March 1943 Crisis in the Battle of the Atlantic: Myth and Reality' in History: The Journal of the Historical Association, Vol. 92, No. 305 (January 2007), p. 80.
- ^ TNA:PRO, ADM 1/14179, Draft Acquaint and minutes dated 3–18 March 1943.
- ^ a b c TNA:PRO, ADM 1/13087, Minute by DTD dated 4 March 1943.
- ^ TNA:PRO, ADM 1/13087, Admiralty to Ministry of War Transport dated 7 May 1943.
- ^ a b c Mitchell, W H, and Sawyer, L A (1990). The Empire Ships. London, New York, Hamburg, Hong Kong: Lloyd's of London Press Ltd. ISBN 1-85044-275-4.
{{cite book}}
: Cite has empty unknown parameter:|month=
(help)CS1 maint: multiple names: authors list (link) - ^ a b c d Hobbs, David (1996). Aircraft Carriers of the Royal and Commonwealth Navies: The Complete Illustrated Encyclopedia from World War I to the Present. London: Greenhill Books. pp. 231–248. ISBN 1-85367-252-1.
{{cite book}}
: Cite has empty unknown parameter:|month=
(help)