Jump to content

Template:Cecina-Volterra railway line diagram

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Zugspitz (talk | contribs) at 11:22, 14 May 2023 (Routemap). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Cecina-Volterra railway
281.592
Cecina
290.123
Riparbella
297.935
Casino di Terra
Monterufoli mining line (1972–1928)
304.584
Ponte Ginori
311.076
Volterra Saline Pomarance
start of rack (1912–1958)
end of rack
319.121
Volterra