Jump to content

Prospekt Metalurhiv (Kryvyi Rih Metrotram)

Coordinates: 47°53′51″N 33°23′37″E / 47.8976°N 33.3935°E / 47.8976; 33.3935
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Shwabb1 (talk | contribs) at 17:36, 22 February 2024 (Added routes 3 and 4). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Prospect Metalurhiv
Kryvyi Rih Metrotram
Prospect Metalurhiv
General information
Location Metallurgical District, Socic Town, Metallurgists Avenue
 Kryvyi Rih,  Ukraine
Coordinates47°53′51″N 33°23′37″E / 47.8976°N 33.3935°E / 47.8976; 33.3935
Owned byKryvyi Rih City Council
Operated by Kryvyi Rih Metro
History
Opened2 May 1989
ElectrifiedYes
Services
Preceding station Kryvyi Rih Metrotram Following station
Kiltseva
Terminus
Route 1 Budynok Rad
Route 2 Budynok Rad
towards Zarichna
KNEU Route 3
KNEU
towards PivdHZK
Route 4

Prospect Metalurhiv (lit.'Metallurgists Avenue', Template:Lang-uk) is a station on the Kryvyi Rih Metro. Opened on 2 May 1989 as part of the second segment of the second stage.

The construction is the same standard as the Kharkiv Metro single vault layout, with a provision for the platform to be raised. Decoratively, a large monolithic concrete vault with a series of niches with suspended luminescent chandeliers. Red brickwork and gray marble is used on walls whilst red and gray granite cover the floor.

The system reaches its deepest point, 22 meters between the two stations, Prospect Metalurhiv and Budynok Rad.

The station is situated on the intersection between the Metalurgists Avenue (Prospect Metalurhiv) and Unity (Sobornosti) Street near the Metalurh Stadium, home ground to FC Kryvbas Kryvyi Rih. The station has two underground vestibules, interconnected with subways.