Jump to content

Wikipedia:WikiProject U.S. Roads/2013 goals

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Fredddie (talk | contribs) at 02:11, 1 January 2014 (removing any conditional code, effectively archiving the page). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
  • 4.4 Relative WikiWork
This year, the goal is to improve articles by enough steps to get the relative WikiWork of the project to 4.400. Improving a Stub to a Start is a one-class improvement; Stub to B is 3 classes. Completed on December 31!
  • De-Stub 25 states
To build off of the 4.4 goal, we would like to have half of the 50 states be destubbed. There are now 25 states with no stubs. Completed on December 31!
  • Interstate and US Highway cleanup drive
Destub and generally improve all Interstate and US Highway articles, including the parent/national-level articles. The goal would be to get any last stubs improved to at least Start-, if not C-Class by the end of the year. We should pay special attention to the articles on our popular pages list. These articles get the most traffic, therefore they should get the most attention first. 544 starts remain. All stubs cleared!