Jump to content

Lianyungang–Xuzhou high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 00:49, 26 January 2021 (Task 18 (cosmetic): eval 3 templates: hyphenate params (2×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Lianyungang–Xuzhou
high-speed railway
连徐客运专线
Overview
StatusUnder construction
Termini
Stations6
Service
Operator(s)China Railway High-speed
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Minimum radius7000 m
5500 m in difficult areas
Operating speed350 km/h (217 mph)

The Lianyungang–Xuzhou high-speed railway (Chinese: 连徐客运专线) is a high-speed railway currently under construction in China. The railway has a design speed of 350 kilometres per hour (220 mph).[1]

The railway runs parallel to the Longhai railway and interchanges with it at Lianyungang and Donghaixian. It is the eastern-most section of the Eurasia Continental Bridge passageway.

History

Construction began on 6 November 2016.[2] The railway was expected to open by the end of 2020,[3] but this was pushed back.

Stations

References

  1. ^ "关于新建连云港至徐州铁路可行性研究报告的批复(发改基础[2016]1979号)". web.archive.org. 19 October 2016. Retrieved 12 October 2020.
  2. ^ "连徐高铁连云港先行开工段开工建设-中青在线". zqb.cyol.com. Retrieved 12 October 2020.
  3. ^ "盐通高铁、连徐高铁预计"岁末年初"通车!这些铁路也有新进展_新华报业网". www.xhby.net. Retrieved 2020-12-11.