Pasila Rail Tunnel

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by The Anomebot2 (talk | contribs) at 00:00, 25 November 2022 (Adding geodata: {{coord missing|Finland}}). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Pasila rail tunnel
The tunnel abandoned in 2009.
Overview
Other name(s)Vallila Rail Tunnel
Kumpula Rail Tunnel
LineSörnäinen harbour rail
StatusAbandoned (2008–2021), indoor running track since 2021
CrossesItä-Pasila
Startnear Pasila railway station (the former classification yard)
EndVallilanlaakso (Vallila)
Operation
Constructed1960s
Opened1965[1]
ClosedNovember 2008 (traffic ended)
Technical
Length650 metres (2,130 ft)

Pasila Rail Tunnel is a former 650-meter railway tunnel under Itä-Pasila residential area in Helsinki, Finland. It used to serve as part of the Sörnäinen harbour rail from 1965 to 2008. The west end of the tunnel located near Pasila railway station and ended up in Vallila in the east.

The decision to build the tunnel came from the need for a more durable and less interrupted way from Pasila to Sörnäinen Harbour (today's Kalasatama). The railway built in 1863 ran directly along today's Teollisuuskatu. As the street was built, narrower at that time, the rail traffic soon became troublesome in the area. The new route was established through Vallilanlaakso and Kyläsaari, with the 650-meter (2,130 ft) tunnel included.

The tunnel portal in Vallila in 2009
The tunnel shut in Itä-Pasila in 2021

Reuse

[edit]

The harbour railway was dismantled in 2009–2010, though the tunnel remained walkable for almost a decade after. An initiative was made for the tunnel to be renovated into a cycling tunnel, similar to Baana in the city centre, but the idea was soon shot down by the city planners.[2] The tunnel remained abandoned until 2020 when the eastern entrance was shut and notable renovation started to turn part of the tunnel into 138-metre long (151 yd) indoor running track.[3] The track, as part of the new Urhea campus, was opened in summer 2021.

References

[edit]
  1. ^ "Kumpulan satamarata käyttöön" [Kumpula harbour railway into use] (in Finnish). Helsingin Sanomat. 19 October 1965. Retrieved 1 November 2022.
  2. ^ "Kaupunkisuunnittelulautakunnan lausunto kaupunginhallitukselle valtuustoaloitteesta, joka koskee Pasilan ja Vallilanlaakson välistä junatunnelia" [Reply to City Board about the Council initiative considering the Pasila-Vallila rail tunnel] (in Finnish). City of Helsinki. 2016. Retrieved 1 November 2022.
  3. ^ "Helsingin Mäkelänrinteeseen nousee Suomen suurin valmennuskeskus" [Finland's biggest training center to be built in Mäkelänrinne, Helsinki] (in Finnish). Rakennuslehti. 3 March 2020. Retrieved 1 November 2022.
[edit]