Jump to content

Fehmarn Sound Tunnel

Coordinates: 54°24′0″N 11°6′50″E / 54.40000°N 11.11389°E / 54.40000; 11.11389
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jexio (talk | contribs) at 07:08, 16 September 2023 (add map). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Fehmarn Sound Tunnel
The tunnel will connect the German mainland (to the south of the Fehmarn Sound) with the island of Fehmarn (to the north.)
Overview
Official nameFehmarnsundtunnel
LineLübeck–Puttgarden railway
Coordinates54°24′0″N 11°6′50″E / 54.40000°N 11.11389°E / 54.40000; 11.11389
RouteBundesautobahn 1
CrossesFehmarn Sound
StartDecided, not under construction yet
Operation
Opens2028
Trafficrail and road
Technical
Length1700 m
No. of tracks2
No. of lanes4
Electrifiedyes
Route map
Map

The Fehmarn Sound Tunnel is a planned tunnel between the German mainland and the island of Fehmarn, which is projected to be built by 2028, to replace the Fehmarn Sound Bridge. It is projected to cost €718 million.[1] The tunnel will be near Großenbrode.

Background

The treaty of 2008 between Germany and Denmark provides that the hinterland connection to the Fehmarnbelt link is to be expanded on the German side, but the Fehmarnsund Crossing connection should remain two-lane road and single-track railway. The bridge was considered to be able to handle the increase in traffic.

It was later decided that the increase of traffic can't be handled by the existing Fehmarn Sound Bridge, especially the rail traffic.[2]

In March 2020 the Federal Ministry for Transport and Digital Infrastructure and Deutsche Bahn announced[3] that they compared all investigated variants and opted for an immersed tunnel for road and rail (estimated cost: 714 million euros) and that the Fehmarnsund Bridge is to be preserved.

Design

Close-up showing the Fehmarn Sound

The design of the tunnel is very similar to the standard elements of the Fehmarn Belt Fixed Link currently being built. This is to be expected since both tunnels have been designed by groups with COWI involved. It has even been proposed to have the needed elements be built at the factory making the elements for the Fehmarn Belt Fixed Link, since the Fehmarn Sound is around 900 meters and the elements for the Fehmarn Belt Fixed Link is 217 meters so the Fehmarn Sound would consist of 4 or 5 such elements. Also, suggestions have been made to preserve the factory for future projects.

References

  1. ^ "Immersed tunnel to relieve Fehmarnsund bridge". Railway Gazette. 3 March 2020.
  2. ^ Deutsche Bahn. Entscheidung zur neuen Fehmarnsundquerung. (in German) Retrieved 11 June 2021
  3. ^ "Entscheidung zur neuen Fehmarnsundquerung". Internetauftritt. DB Netze. 2020-03-03.