Jump to content

Minto Flywheel Facility

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Transpoman (talk | contribs) at 11:41, 15 November 2023 (Reformatted and expanded content of references; added archived link for dead URL). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

The Minto Flywheel Facility for grid frequency regulation was the first in Canada.[1]

The 2 MW (for 15 min)[2] flywheel storage facility in Minto Ontario, Canada opened in 2014.[1]

The flywheel system (developed by NRStor and built by Temporal Power) uses 10 spinning steel flywheels on magnetic bearings.[1]

References

[edit]
  1. ^ a b c Willis, Ben (2014-07-23). "Canada's first grid storage system launches in Ontario". PV-Tech Storage. Archived from the original on 2015-11-22.
  2. ^ "IESO Expedited System Impact Assessment - Minto Flywheel Facility" (PDF). Independent Electricity System Operator. 2013. Archived from the original (PDF) on 2016-01-29.