This is an old revision of this page, as edited by Iain Bell(talk | contribs) at 06:35, 14 July 2017(remove {defaultsort} - not appropriate since page move). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 06:35, 14 July 2017 by Iain Bell(talk | contribs)(remove {defaultsort} - not appropriate since page move)
The LC-2 was an improved version of the N&W LC-1, which Westinghouse, with Baldwin, had built for the N&W in 1914–1915. The locomotives were a third more powerful than their predecessors.[1]
History
After World War I the N&W extended electrification on the Elkhorn Grade to a total of 52 miles (84 km) and required additional electric power to handle demand. Westinghouse and ALCO delivered four LC-2s in 1924–1925, which the N&W operated alongside the older LC-1s.[1] Following World War II the N&W bypassed the existing Elkhorn Tunnel with a new tunnel twice as long as the original, double-tracked, and on a gentler 1.4% grade. These improvements eliminated the need for electrification. On the opening of the new tunnel on June 26, 1950 the N&W retired the LC-2s.[2][3]