Jump to content

Garden City Northern Railway

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Cabayi (talk | contribs) at 13:21, 26 May 2018 (top: per Wikipedia:Templates for discussion/Log/2018 March 4#Template:Infobox rail standard gauge, replaced: {{Infobox SG rail → {{Infobox rail | gauge={{Track gauge|ussg|allk=on}} using AWB). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Garden City Northern Railway
Overview
HeadquartersGarden City, Kansas
Reporting markGCN
LocaleKansas
Dates of operationSeptember 7, 1989–September 1, 1991
SuccessorGarden City Western Railway
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The Garden City Northern Railway (reporting mark GCN) line ran from Garden City to Shallow Water, Kansas about 31 miles (50 km). This trackage was originally built by the Garden City, Gulf and Northern Railway (GCG&N) on January 4, 1907. In July 1911, the GCG&N and its entire line came under Atchison, Topeka and Santa Fe Railway (ATSF) control. The ATSF operated the line until September 7, 1989, when GCN took over the line. The GCN was combined with parent Garden City Western Railway in September 1991.