Jump to content

Tawatinâ Bridge

Coordinates: 53°32′24.9″N 113°28′37.9″W / 53.540250°N 113.477194°W / 53.540250; -113.477194
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 68.148.230.9 (talk) at 03:19, 3 February 2020 (fix coords). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Tawatinâ Bridge is a dedicated LRT bridge crossing the North Saskatchewan River in Edmonton, Alberta, currently under construction. It will be a part of the Valley Line LRT, which is scheduled to open in 2021.

Tawatinâ means "valley" in Cree.[1]

References

  1. ^ Lagesse, Nina. "New Tawatinâ Bridge an important act of reconciliation". The Gateway. No. 3 February 2016. Retrieved 9 April 2018.

53°32′24.9″N 113°28′37.9″W / 53.540250°N 113.477194°W / 53.540250; -113.477194