Jump to content

SERC Reliability Corporation

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ionmars10 (talk | contribs) at 17:45, 1 June 2020 (top: clean up, replaced: in January 14 → on January 14). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The three major and two minor NERC Interconnections, and the nine NERC Regional Reliability Councils.

The SERC Reliability Corporation (SERC) is responsible for ensuring a reliable and secure electric grid across 16 southeastern and central states. The SERC region lies within the Eastern Interconnection, and includes the states of Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia, Mississippi, Iowa, Illinois, Kentucky, Virginia, Oklahoma, Arkansas, Louisiana, Texas and Florida.

SERC is authorized to perform this important responsibility under a Federal Energy Regulatory Commission approved delegation agreement with North American Electric Reliability Corporation (NERC). SERC was originally formed on January 14, 1970 by the functional merger of four smaller regional reliability entities: the CARVA Pool, Tennessee Valley Authority (TVA), Southern Company (SOCO) and the Florida Electric Power Coordinating Group (FEPCG).

SERC's offices are located in Charlotte, North Carolina.