Jump to content

Botevgrad-Vidin expressway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Elkost (talk | contribs) at 11:24, 31 July 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Botevgrad-Vidin expressway
Скоростен път „Ботевград-Видин“
Botevgrad-Vidin expressway highlighted
Route information
Length18.5 km (11.5 mi)
0 km (0 mi) under construction
185 km (115 mi) planned
Major junctions
FromBotevgrad,
ToVidin, New Europe Bridge; Romania
Location
CountryBulgaria
Major citiesMezdra, Vratsa, Montana
Highway system

The Botevgrad-Vidin expressway (Bulgarian: Скоростен път „Ботевград-Видин“, romanizedSkorosten pat "Botevgrad-Vidin") is a planned expressway in Bulgaria, that will link the A2 Hemus motorway with Vidin and the New Europe Bridge, at the Danube border crossing to Romania. The expressway shall provide grade-separated dual carriageway with two lanes in each direction and it shall replace or supersede the existing I-1 road.

The route is part of the Pan-European Corridor IV. It is also part of the European route E79, that runs from Miskolc (Hungary) to Thessaloniki (Greece) and part of the proposed Via Carpatia route.

In June 2014, tenders for construction of two sections between Botevgrad and Mezdra were announced.[1][2] In September 2014, the Road Infrastructure Agency announced that construction of Botevgrad-Vidin expressway shall be financed by an EIB loan.[3]

In the end of December 2015, the bypass of Montana was inaugurated.[4]

Планирани изходи

Изход km Дестинация Платна Забележка
25px 6 Видин, Брегово 90px Construction works
20px25px 8,9 Vidin, Vrashka chuka 90px Construction works
25px 9,6 Vidin-industrial zone 90px Construction works
25px 20,3 Dunavtsi,Sinagovtsi 90px Construction works
25px 30,2 Kula,Sratsimirovo 90px Construction works
25px 36 Makresh,Dimovo 90px Planned
25px 46.4 Bela,Dimovo 90px Planned
25px 51,6 25п|link=Републикански път I-1 90px Planned
25px 58,6 25п|link=Републикански път I-1 90px Planned
25px 72,4 25п|link=Републикански път I-1 90px Planned
25px 84,9 25п|link=Републикански път I-1 90px Planned
20px25px 98 Монтана25п|link=Републикански път I-1 90px Planned
25px 102,7 Монтана 90px Planned
20px25px 114,5 90px Planned
25px 120 Крапчене 90px Planned
25px 127,5 Сумер 90px Planned
20px25px 143 25п|link=Републикански път I-1 90px Planned

References

  1. ^ ""Определяне на изпълнител за допълнително проектиране и строителство на обект: "Път І–1 (Е-79) "Мездра – Ботевград" Лот 1, от км 174+800 до км 194+122"" (in Bulgarian). 2014-06-27. Archived from the original on 2015-09-23.
  2. ^ ""Определяне на изпълнител за допълнително проектиране и строителство на обект: "Път І–1 (Е-79) "Мездра – Ботевград" Лот 2, от км 161+367 до км 174+800"" (in Bulgarian). Archived from the original on 2015-09-23.
  3. ^ "Развитието на коридор №4 по направлението Видин – Ботевград е ключов приоритет на АПИ" (in Bulgarian). RIA. 01.09.2014. {{cite news}}: Check date values in: |date= (help)
  4. ^ "Над 46,5 млн. лв. са инвестирани в изграждането на обходния път на Монтана" (in Bulgarian). RIA. 29 December 2015.