Line SFMA

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mjdestroyerofworlds (talk | contribs) at 02:56, 11 August 2020 (added Category:Railway lines opened in 2012 using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line SFMA
Overview
Stations20
Service
TypeCommuter rail
SystemTurin SFM
Operator(s)GTT
Rolling stockMinuetto
History
Opened9 December 2012 (2012-12-09)
Technical
Track gauge1,435 mm (4 ft 8+12 in)
map_name

Ceres
Mezzenile
Pessinetto
Losa
Traves
Funghera
Germagnano
Lanzo
Balangero
Mathi
Villanova-Grosso
Nole
San Maurizio
Caselle Aeroporto Turin Airport
Caselle
Borgaro
Venaria
Rigola-Stadio
Madonna di Campagna
Torino Dora
Torino Porta Susa
 1  2  4  6  7 

Line SFMA, part of the Turin metropolitan railway service, links Ceres to Turin (at Dora GTT Station), passing through Turin Caselle airport, Venaria Reale and nearby Allianz Stadium. The line was inaugurated on 9 December 2012.[1]

Future Development

A railway tunnel is planned to be built under Corso Grosseto, a major east-west artery in the city, to link the current Turin-Ceres line with Porta Susa station. The duration of the construction is estimated to be 3 years, but will happen in stages to minimise impact on local residents and business owners. Once completed, the 2.7km long tunnel will include its own underground station, which will replace the current Madonna di Campagna station. Two overpasses on Corso Grosseto will be demolished, and replaced by a signalled intersection. In order to reduce traffic, a 400 meter underpass will also be built under Largo Grosseto.[2]

On December 14, 2017, the demolition of the overpasses on Corso Grosseto were halted due to the discovery of asbestos within the structure. The revelation could delay the demolition work by two months.[3]

References

  1. ^ "La Stampa". Archived from the original on 2012-09-15.
  2. ^ "Torino-Ceres, svelati i dettagli del progetto che rivoluzionerà la città: costi, tempi e viabilità". torino.diariodelweb.it. Diario di Torino. November 2, 2017. Retrieved January 4, 2018.
  3. ^ Diego Longhin (December 14, 2017). "Corso Grosseto, cantiere bloccato: nel cavalcavia da abbattere c'è l'amianto". torino.repubblica.it. La Repubblica. Retrieved January 4, 2018.