Jump to content

Matiri Project

Coordinates: 41°39′43″S 172°20′4″E / 41.66194°S 172.33444°E / -41.66194; 172.33444
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Nzacdp (talk | contribs) at 06:17, 13 August 2020 (Update. Scheme is now under construction.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Matiri Project
Map
CountryNew Zealand
LocationMatiri Valley, Tasman District
Coordinates41°39′43″S 172°20′4″E / 41.66194°S 172.33444°E / -41.66194; 172.33444
StatusProposed
Owner(s)New Zealand Energy Limited
Thermal power station
Primary fuelHydropower
Power generation
Nameplate capacity4.6 MW
External links
CommonsRelated media on Commons

The Matiri Project is a hydroelectric scheme under construction by Pioneer Energy Limited at Lake Matiri and the Matiri River in the South Island of New Zealand.

The scheme was opposed by environmentalists and kayakers some of whom were angry that the resource consents were not notified nationwide.[1] The proposal was approved and it included a concession granted by the Department of Conservation to build structures on public land. Forest and Bird did not see that there would be any conservation gain in giving the approval.[2]

See also

References

  1. ^ Kidson, Sally (25 September 2008). "Split over Lake Matiri hydro plan". Nelson Mail. Retrieved 30 October 2008.
  2. ^ Murdock, Helen (26 May 2011). "DOC's hydro approval damns bats". Nelson Mail. Retrieved 26 May 2011.