Jump to content

Nanchang–Huangshan high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by John B123 (talk | contribs) at 20:31, 11 October 2020 (Added tags to the page using Page Curation (refimprove)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Nanchang–Huangshan
high-speed railway
昌景黄铁路
Overview
StatusUnder construction
Termini
Stations9
Service
Operator(s)China Railway High-speed
Technical
Line length289.9 km (180 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Nanchang–Huangshan high-speed railway is a high-speed railway currently under construction in China. The railway is 289.9 kilometres (180.1 mi) long and has a design speed of 350 kilometres per hour (220 mph). It is expected to open in 2023.[1]

History

Construction began on 25 December 2018.

Stations

References

  1. ^ "时速350公里!昌景黄高铁江西段开建(图)-江西新闻网-中国江西网首页". jiangxi.jxnews.com.cn. 26 December 2018. Retrieved 11 October 2020.