Alto Lindoso Dam
Alto Lindoso Dam | |
---|---|
Official name | Barragem do Alto Lindoso |
Location | municipality Ponte da Barca, Viana do Castelo District, Portugal |
Purpose | Power |
Status | Operational |
Construction began | 1983 |
Opening date | 1992 |
Owner(s) | Companhia Portuguesa de Produção de Electricidade |
Dam and spillways | |
Type of dam | Concrete double curvature arch dam |
Impounds | Lima |
Height (foundation) | 110 m (360 ft) |
Length | 297 m (974 ft) |
Elevation at crest | 339 m (1,112 ft) |
Width (crest) | 4 m (13 ft) |
Width (base) | 21 m (69 ft) |
Dam volume | 308,500 m3 (10,890,000 cu ft) |
Spillway type | 2 shaft spillways |
Spillway capacity | 2,760 m3 (97,000 cu ft) |
Reservoir | |
Total capacity | 379,010,000 m3 (307,270 acre⋅ft) |
Active capacity | 347,910,000 m3 (282,060 acre⋅ft) |
Surface area | 1.05 km2 (0.41 sq mi) |
Normal elevation | 338 m (1,109 ft) |
Operator(s) | Energias de Portugal |
Commission date | 1992 |
Type | Pumped-storage |
Hydraulic head | 288 m (945 ft) (max) |
Turbines | 2 x 317 MW Francis-type |
Installed capacity | 630 MW |
Annual generation | 933.8 GWh |
Alto Lindoso Dam (Template:Lang-pt) is a concrete double curvature arch dam on the Lima River. It is located in the municipality Ponte da Barca, in Viana do Castelo District, Portugal. The dam lies in Peneda-Gerês National Park close to the border with Spain.
Construction of the dam began in 1983. The dam was completed in 1992. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power production.[1]
Dam
Alto Lindoso Dam is a 110 m tall (height above foundation) and 297 m long double curvature arch dam with a crest altitude of 339 m.[1] The width at the base is 21 m (crest 4 m).[2] The volume of the dam is 308,500 m³. The dam contains 2 shaft spillways with 3 gates each (combined maximum discharge 2,760 m³/s) and 2 bottom outlets (combined maximum discharge 400 m³/s).[1]
Reservoir
At full reservoir level of 338 m (maximum flood level of 339 m) the reservoir of the dam has a surface area of 1.05 (10.72)[2][3] km² and its total capacity is 379.01 mio. m³. Its active capacity is 347.91 (270)[4] mio. m³. Minimum operating level is 280 m.[1] With the 347.9 mio. m³ water 224.6 GWh can be produced.[5]
Power plant
The pumped-storage[3] hydroelectric power plant went operational in 1992. It is owned by CPPE, but operated by EDP. The plant has a nameplate capacity of 630[1][3][5] (634)[4] MW. Its average annual generation is 933.8[5] (909.6,[6] 910[4] or 948[1][3]) GWh.
The power station contains 2 Francis turbine-generators with 317 MW (350 MVA) each in an underground powerhouse 340 m below the surface.[2] The turbine rotation is 214.3 rpm. The minimum hydraulic head is 227 m, the maximum 288 m. Maximum flow per turbine is 125 m³/s.[5]
As lower reservoir for Alto Lindoso the reservoir of Touvedo dam is used,[3] which is connected via a tailrace tunnel with a length of 4,883 m.[2][6]
See also
References
- ^ a b c d e f "ALTO LINDOSO DAM". APA Barragens de Portugal. Retrieved 2015-02-13.
- ^ a b c d "Central do Alto Lindoso" (in Portuguese). Museu da Electricidade. Retrieved 2015-02-13.
- ^ a b c d e "Alto Lindoso Hydroelectric Power Plant Portugal". Global Energy Observatory. Retrieved 2015-02-13.
- ^ a b c "Hidroelectricidade em Portugal memória e desafio" (PDF) (in Portuguese). Rede Eléctrica Nacional, S.A. p. 30 (28). Retrieved 2015-02-13.
- ^ a b c d "Alto Lindoso Informação Técnica" (in Portuguese). Energias de Portugal. Retrieved 2015-02-13.
- ^ a b "DECLARAÇÃO AMBIENTAL 2012" (PDF) (in Portuguese). Energias de Portugal. p. 16-17 (14-15). Retrieved 2015-02-13.