Callahan Tunnel

Coordinates: 42°22′04″N 71°2′46″W / 42.36778°N 71.04611°W / 42.36778; -71.04611
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by TUFKAAP (talk | contribs) at 16:57, 15 September 2018 (→‎Alternatives). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Callahan Tunnel
The entrance to the tunnel just past I-93 Southbound Exit 24B to Logan Airport.
Overview
LocationBoston, Massachusetts
StatusOpen
Route
Route 1A north
StartDowntown Boston
EndEast Boston
Operation
Constructedhigh-strength steel and concrete infill
OpenedNovember 11, 1961; 62 years ago (November 11, 1961)
OwnerCommonwealth of Massachusetts
OperatorMassachusetts Department of Transportation
TollBetween $0.20 and $2.05 depending on payment method and residency
Technical
Length.96 mi (1.54 km)
No. of lanes2
Operating speed40 mph (64 km/h)
Tunnel clearance13.4 ft (4.1 m)[1]
Width24.2 ft (7.4 m)[1]

The Callahan Tunnel, officially the Lieutenant William F. Callahan Jr. Tunnel is one of four tunnels, and one of three road tunnels, beneath Boston Harbor in Boston, Massachusetts. It carries motor vehicles from the North End to Logan International Airport and Route 1A in East Boston. Ordinarily, this tunnel is only used to carry traffic out of the city, and with the completion of the Big Dig it only collects traffic from I-93 southbound (right after traffic merges from Storrow Drive) and downtown Boston. As of 2016, a toll of $1.50 is charged for non-commercial two-axle vehicles with a Massachusetts E-ZPass, while non-Massachusetts E-ZPass holders are charged $1.75. Vehicles without EZ-Passes are charged $2.05 through MassDOT's Pay By Plate MA program. For residents of certain Boston zip codes, a discount is in effect using an E-ZPass transponder, costing $0.20.

Alternatives

Traffic flowing between Logan International Airport and directions south of the city on I-93 and west of the city on the Mass Pike (I-90) normally uses the Ted Williams Tunnel rather than the Callahan and Sumner Tunnels. Logan traffic can also use East Boston surface roads to and from Chelsea (Chelsea Street Bridge), Revere (Massachusetts Route 1A) and Winthrop (Massachusetts Route 145).

History

Map showing the Callahan Tunnel (in red)

The tunnel was opened in 1961. It was named for the son of Turnpike chairman William F. Callahan, who was killed in Italy just days before the end of World War II. Operatic tenor William Flavin, of Milton, Massachusetts, sang the Star-Spangled Banner and Danny Boy at the opening of the Callahan Tunnel in 1961.

In 2016, booth-less toll systems were installed in both directions, entering the Sumner Tunnel and exiting the Callahan Tunnel as part of a plan to revolutionize toll collection the Boston area.[2]

Historically, control signals were used to reverse direction of one lane in this tunnel or the Sumner Tunnel, when the opposite tunnel was closed for maintenance or emergencies. Under the relevant Turnpike regulations, a yellow signal light means "proceed only as directed", on penalty of a $50 fine. As the signals are almost always yellow, this rule is universally ignored by drivers.[citation needed] Other markings in the tunnel include a "double white line" in the center, intended to discourage drivers from changing lanes, to be penalized with a $100 fine.

The Callahan Tunnel was repaired in the 1990s.[3]

A major overhaul began in December 2013, which will completely replace the deck, curbs, and wall panels; and clean and repair its ceiling and vent systems (above the ceiling and below the deck). It was planned for three phases: complete closure from December 27, 2013 to March 12, 2014 during deck and curb replacement; closures 11pm-5am from March 13, 2014 to late August 2014 for wall panel replacement; and finish work until November, 2014. McCourt Construction of South Boston was awarded the $19.3M contract in August.[4] During closures, Logan-bound traffic is diverted into the Ted Williams Tunnel, Tobin Bridge, and Massachusetts Route 1A South via Revere or East Boston.[5] Starting with the Accelerated Bridge Program in the late 2000s, MassDOT began employing accelerated construction techniques, in which it signed contracts with incentives for early completion and penalties for late completion, and used intense construction during longer periods of complete closure to shorten the overall project duration and reduce cost.[6] These techniques are also being used for the Callahan Tunnel Rehabilitation Project.[5]

References

  1. ^ a b "Rehabilitation of the Sumner/Callahan Tunnels" (PDF). Concrete Repair Bulletin. International Concrete Repair Institute, Inc. May–June 2002. Archived from the original (PDF) on 30 December 2013. Retrieved 7 May 2013. {{cite journal}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  2. ^ "Toll Rates". EZDRIVEMA. Retrieved 2 December 2016.
  3. ^ Hanson, Melissa (27 December 2013). "Callahan Tunnel closure begins at 11 p.m." Boston Globe. Retrieved 28 December 2013.
  4. ^ Chesto, Jon (17 November 2013). "Here's what you need to know about the Callahan Tunnel's three-month closure". Boston Business Journal. Retrieved 31 March 2014.
  5. ^ a b "Callahan Tunnel Rehabilitation Project". Massachusetts Department of Transportation. Retrieved 30 December 2013.
  6. ^ Moran, Jack (May–June 2012). "The Fast 14 Project". Public Roads. 75 (6). United States Federal Highway Administration.

See also