Jump to content

Coburg–Sonneberg railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by John of Reading (talk | contribs) at 10:15, 11 January 2016 (→‎History: Typo fixing, replaced: In 1 September 1947 → On 1 September 1947 using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Coburg–Sonneberg
Overview
Line number5121
LocaleBavaria, Germany
Service
Route number820
Technical
Line length19.5 km (12.1 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Template:BS-map

The Coburg–Sonneberg railway is a single-track, electrified, 20 kilometre-long main line railway from Coburg in the German state of Bavaria via Neustadt to Sonneberg in Thuringia. It was opened in 1858 and is one of the oldest railways in Germany.

History

In 1841 the Grand Duchy of Saxe-Weimar-Eisenach and the duchies of Saxe-Coburg and Gotha and Saxe-Meiningen signed a treaty to establish a railway from Eisenach to Coburg. This also covered the construction of a line from Coburg to Sonneberg, connecting Sonneberg with the city of Meiningen and south to Bavaria.

Passenger train with class 86 steam locomotive at Coburg, Kalenderweg level crossing in 1958

in 1855 the newly formed Werra Railway Company (Werra-Eisenbahn-Gesellschaft) received a concession to build and operate the line and on 1 November 1858 the Werra Railway was opened. 28 years later, on 1 October 1886, a 19.2 km long extension was opened from Sonneberg to Lauscha.

On 1 October 1895, the Werra-Railway Company, including this line, was acquired by the Prussian government and it was administered by the railway administration of the Deutsche Reichsbahn in Erfurt until 1945. The timetable of the German State Railway (Deutsche Reichsbahn) in 1939 included 14 daily passenger trains and an express train in each direction with a running time on the line of 20 minutes for the expresses.

After the occupation by Thuringia by Soviet troops in July 1945, operations between Sonneberg and Neustadt were interrupted. On 1 September 1947, freight services resumed over the Inner German Border, with a break during the Berlin Blockade. Two pairs of freight trains each day had been approved by the occupying powers for the transport of coke from Neustadt to Sonneberg, but traffic was small and irregular. On 30 September 1951 the last run took place, which was followed by the dismantling of the tracks in the spring of 1952.

Coburg station

The Coburg–Neustadt section was electrified in 1975 with a financial subsidy from the State of Bavaria. This allowed the avoiding of a locomotive change to a class 86 steam locomotive or a class 280 diesel locomotive in Coburg. Instead the class 144 electric locomotives continued to Neustadt. In 1979, Oeslau station was renamed Rödental station and a new station building was opened. A year later rail operation on weekends were abandoned.

After the fall of the Inner German Border the line through the gap between Neustadt and Sonneberg was immediately reinstated. Some of the land had to be bought back as only a few years earlier part of the line had been sold to the Bavarian forest service. On 28 September 1991 the 3.5 km long, former cross-border section from Neustadt to Sonneberg was returned to service, it was electrified from the first day.

From 2004 to 2006, DB Station&Service rehabilitated platforms along the line (at Neustadt, Mönchröden and Rödental stations) and adapted them for disabled people. In addition, the new halts of Coburg Nord and Rödental Mitte were built and put into operation on 11 December 2005.

Operations

Sonneberg Hauptbahnhof
Train hauled by 143-128 at Coburg–Kalenderweg level crossing in 2008

Regionalbahn services run on the line every two hours, alternating with Deutsche Bahn Regional-Express trains (route number 820). The latter usually run via Bamberg to Nuremberg, while the Regionalbahn services mostly end in Lichtenfels. On week days, twenty pairs of services operate between 4:30 AM and 22 PM, usually requiring 22 minutes for the route, stopping at all stations. The Regional-Express and Regionalbahn services together provide services at approximately hourly intervals. The regional express trains consist of double-deck carriages hauled by class 111 and 146 locomotives. The Regionalbahn services running during the week are hauled by class 143 locomotives; on weekends they are operated by class 642 (Siemens Desiro) diesel multiple units.

Scheduled freight traffic has been re-established. When required, IntEgro Verkehr GmbH operates container trains from Monday to Fridays from Hof to Sonneberg Ost and return.

References

  • Wolfgang Bleiweis, Stefan Goldschmidt and Bernd Schmitt: Eisenbahn im Coburger Land. Verlag Eisenbahnfreunde Steinachtalbahn-Coburg, Coburg 1996, ISBN 3-9802748-4-5
  • Steffen Dietsch, Stefan Goldschmidt, Hans Löhner: Die Werrabahn. Verlag Eisenbahnfreunde Steinachtalbahn-Coburg, Coburg 2008, ISBN 978-3-9810681-3-9
  • Eisenbahnatlas Deutschland (German railway atlas) 2007/2008 edition. Schweers + Wall. 2007. ISBN 978-3-89494-136-9.

External links