Dýrafjarðargöng

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Auric (talk | contribs) at 22:55, 23 October 2016 (Added {{unreferenced}} tag to article (TW)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Dýrafjarárgöng
Overview
StatusIn planning
Route62
Operation
Work begun2017
Opens2020
OperatorVegagerðin
TrafficAutomotive
Technical
Length5.6km
No. of lanes2

Dýrafjarðargöng is a tunnel in Iceland that is planned to open in 2020 with construction starting in 2017. The tunnel will be 5.6 km long and will shorten the route of the Vestfjarðarvegur by 26 km. Tunnels lies between Arnarfjörður and Dýrafjörður in the Westfjords and is and important in linking north and south parts of the Westfjords. It relieves the mountain pass that is unpaved and closed most of the year. The estimated cost of the tunnel is ISK 9.2 million(2016 prices). The construction will begin in 2017.