Festiniog Railway 0-4-0TT
Festiniog Railway 0-4-0TT | |||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
|
The Festiniog Railway 0-4-0TT were six 0-4-0 steam locomotives built by George England and Co. for the Festiniog Railway between 1863 and 1867.[1][2] The locomotives were built to two designs: the first four were originally side tank locomotives and are collectively known as the Small England class; the final two locomotives were delivered with saddle tanks and are known as the Large England class.
The designation "TT" indicates a tank locomotive with a tender. Water is carried in tanks on the locomotive while fuel (coal) is carried in the tender.
Small England class
The Festiniog Railway was originally built to be worked by gravity, with horses used to haul the empty slate wagons uphill from Porthmadog to Blaenau Ffestiniog. By the late 1850s it was clear that the line was reaching its carrying capacity, while the production from the slate quarries was continuing to expand. To increase the amount of slate that could be carried by the railway. In order to increase capacity, in 1860 the board began investigating the use of steam locomotives for the railway. Although steam had been used on narrow gauge railways before this, it had only rarely been used on a gauge as narrow as the Festiniog's.[3]
In 1862, the railway advertised in The Locomotive magazine asking for manufacturers to bid to supply an 0-6-0T locomotive to the railway. Although they received 29 expressions of interest, none were accepted. Charles Menzies Holland was acting as locomotive designer for the Festiniog Railway and he approached George England who lived near him in London. England agreed to bid for the contract and in February 1863 he proposed building three 0-4-0T locomotives primarily to his own design. This bid was accepted and construction began. England's design was for a small 0-4-0 locomotive with side tanks and tender. The locomotives had a low center of gravity and were extremely small to fit within the restricted loading gauge of the railway.[3]
The first two locomotives Mountaineer and The Princess arrived in July 1863. They were delivered without domes, over the objection of England. As a result, they suffered badly from priming and domes were hastily fitted in Wales before the locomotives could be run on service trains. The first formal steam-hauled train on the Festiniog Railway ran on 23rd. October 1863.[3]
A fourth locomotive was added to the order and The Prince and Palmerston arrived in 1864. These were to the same basic design as the first two locomotives, but were delivered with domes already fitted. The introduction of the initial locomotives was a great success, allowing the railway to handle the increasing slate traffic and its first formal passenger trains.[3]
No. | Name | Date built | Status | Image | Notes |
---|---|---|---|---|---|
1 | The Princess (later Princess) | 1863 | Static display | Rebuilt in 1882 with a cast iron weight giving the appearance of a saddle tank. In 1895 she was rebuilt with a saddle tank, cab and given the name Princess. She' was reboilered in 1923 and she worked the last train on the original railway in 1943. After preservation, Princess has remained in her 1946 condition, although cosmetically restored in 1963 and 1981 after which she was displayed in Spooner's Bar at Harbour Station. In 2013 she was removed and repainted in a lined red livery and displayed at Paddington Station to celebrate her 150th. anniversary.[3] | |
2 | The Prince (later Prince) | 1864[3] | In service | Overhauled in 1881 with cast iron weights. In 1890 a half-open cab was added. In 1892 a full cab, new boiler and saddle tank were fitted. Prince was withdrawn with a worn out boiler in 1936. In 1955 after preservation, Prince was the first steam locomotive restored. In 1962 new frames and cylinders were fitted but Prince was withdrawn in 1968. In 1980 Prince returned to traffic with superheating and a larger cab fitted and converted to oil firing. In 2013, Prince was again overhauled and converted back to coal firing.[3] | |
3 | Mountaineer | 1863 | Scrapped | Remained in substantially original condition, including side tanks for all of its working life. Withdrawn and dismantled 1879.[3] | |
4 | Palmerston | 1864 | In service | In 1880, Palmerston was the first of the Small Englands to receive a saddle-like cast iron weight. In 1886 this was replaced with a true saddle tank along with a new boiler and full cab. In 1891, the cab was shortened by 8 inches to allow Palmerston to enter the slate wharves. In 1933 the boiler was repaired with parts from Little Giant but Palmerston was withdrawn in 1940 and was used as a stationary boiler at Boston Lodge during World War II. After preservation parts from Palmerston were used to restore Prince and the rusted remains were sold to a group in Staffordshire in 1974. In 1987 the remains of the locomotive were repatriated to the Festiniog Railway and restored to working order in 1993.[3] |
Large England class
By 1867, traffic on the Festiniog Railway had outgrown the capabilities of the four new Small Englands, so an order for two further locomotives was placed with George England and Co.. In the light of the experience with the initial class, these two new locomotives were built to a larger and improved design and they are known as the Large England class. Welsh Pony and Little Giant were delivered in 1867 and had saddle tanks fitted instead of side tanks. They also had a longer wheelbase and larger driving wheels than the Small Englands, to counteract the smaller locomotives' "violent vertical oscillations".[3]
No. | Name | Date built | Status | Image | Notes |
---|---|---|---|---|---|
5 | Welsh Pony | 1867 | Under restoration | Welsh Pony worked, with minor overhauls, until 1891 when most of its components were replaced and an overall cab fitted. In 1915 a new boiler was fitted and underwent a substantial overhaul for most of 1929. In 1939, Welsh Pony was withdrawn from traffic and left in the shed at Boston Lodge. In the 1960s and 1970s she was stored in the open and deteriorated significantly. In 1984 she was repainted red and put on display outside Harbour Station where she remained until 2002 when she was moved to Glan y Pwll shed. In 2013 the locomotive was cosmetically restored.[3] | |
6 | Little Giant | 1867 | Dismantled by 1932 | Little Giant worked hard during the early years and in 1875 underwent a 6-month heavy overhaul. With minor repairs, this saw the locomotive working until 1887 when the boiler, smokebox and chimney were replaced. In 1904 Little Giant was back at Boston Lodge for another new boiler and replacement cylinders and cab front-sheet. By 1932, the locomotive was withdrawn and parts were being used to rebuild other Englands. Some parts still survive.[3] |