Jump to content

Halfway tram stop (Great Orme)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Redrose64 (talk | contribs) at 23:28, 29 November 2016 (References: stub sorting). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Halfway (Great Orme)
General information
LocationConwy
Platforms2
History
Original companyGreat Orme Tramway
Key dates
31st July 1902Lower platform opened
8th July 1903Higher platform opened

Not to be confused with Halfway station on the Snowdon Mountain Railway.

The Halfway tram stop is a tram stop situated at the mid-point of the Great Orme Tramway on the slopes of the Great Orme in Llandudno, Wales. The Great Orme Tramway operates as a two-section funicular, and passengers must change at Halfway between the lower section (to and from the Victoria stop) and the upper section (to and from the Summit stop). The stop is also convenient for the nearby Bronze Age Copper Mines.[1][2]

As well as being the point at which passengers change cars, the Halfway stop is also the control centre for the Great Orme Tramway. The electric motors which drive the cables that propel the cars are located in the central building of the stop, as are the winchmen who control them.[3]

Trams run approximately every ten minutes to the Summit stop, and roughly every twenty minutes to Victoria, increasing to ten minutes in peak hours.[citation needed] Trams run only from late March to late October.[2]

Preceding station Heritage Railways  Heritage railways Following station
Victoria   Great Orme Tramway   Summit

References

  1. ^ Turner, Keith (2003). The Great Orme Tramway – over a century of service. Llanrwst: Gwasg Carreg Gwalch. ISBN 978-0-86381-817-2.
  2. ^ a b "Visitor Information". Great Orme Tramway. Retrieved 28 October 2016.
  3. ^ "How it works". Great Orme Tramway. Retrieved 29 October 2016.