Halfway tram stop (Great Orme)
Halfway (Great Orme) | |
---|---|
General information | |
Location | Conwy |
Platforms | 2 |
History | |
Original company | Great Orme Tramway |
Key dates | |
31st July 1902 | Lower platform opened |
8th July 1903 | Higher platform opened |
Not to be confused with Halfway station on the Snowdon Mountain Railway.
The Halfway tram stop is a tram stop situated at the mid-point of the Great Orme Tramway on the slopes of the Great Orme in Llandudno, Wales. The Great Orme Tramway operates as a two-section funicular, and passengers must change at Halfway between the lower section (to and from the Victoria stop) and the upper section (to and from the Summit stop). The stop is also convenient for the nearby Bronze Age Copper Mines.[1][2]
As well as being the point at which passengers change cars, the Halfway stop is also the control centre for the Great Orme Tramway. The electric motors which drive the cables that propel the cars are located in the central building of the stop, as are the winchmen who control them.[3]
Trams run approximately every ten minutes to the Summit stop, and roughly every twenty minutes to Victoria, increasing to ten minutes in peak hours.[citation needed] Trams run only from late March to late October.[2]
Preceding station | Heritage railways | Following station | ||
---|---|---|---|---|
Victoria | Great Orme Tramway | Summit |
References
- ^ Turner, Keith (2003). The Great Orme Tramway – over a century of service. Llanrwst: Gwasg Carreg Gwalch. ISBN 978-0-86381-817-2.
- ^ a b "Visitor Information". Great Orme Tramway. Retrieved 28 October 2016.
- ^ "How it works". Great Orme Tramway. Retrieved 29 October 2016.