Jump to content

Pella Sietas

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 188.108.144.228 (talk) at 16:28, 3 October 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pella Sietas GmbH
Company typeShipyard
IndustryShipbuilding
GenreIndustry
PredecessorJ.J Sietas KG Schiffswerft GmbH u. Co.
Founded1635
FounderCarsten Sietasch
HeadquartersElbe, Neuenfelde, Germany,
Cranz
,
Germany
Number of locations
1
Area served
Hamburg
Key people
Garegin G. Tsaturov
ProductsShip sections, new Ships
ServicesShip Construction, Repair
OwnerGaregin G. Tsaturov
Number of employees
~ 200
ParentPella Shipyard
Websitehttp://www.pellasietas.com

Pella Sietas is a shipbuilding company in Neuenfelde, Cranz, west-south area of Hamburg. The company is from the insolvent traditional J.J Sietas KG Schiffswerft GmbH u. Co. emerged. The company's headquarters is located in the estuary of Este river at Unterelbe.

History

The until November 2013 oldest still existing shipyard in Hamburg was founded in 1635, making it one of the oldest industry of the city. From the inception, the company was continuously owned by the family and was out until early 2009 in the ninth generation. In the early years were mainly boats built of wood, later followed Briggs and other types of ships. In Early 20th century, production was continuing shifted from wood to steel. Since the 1950s, was built on the shipyard, Ships in sectional construction. Primarily small to medium-sized, in recent years container vessels were built.

After the shipyard was experiencing financial difficulties due to rising steel prices, the rapid fall in rates for container ships and incorrect calculation of costs, the largest creditor of the shipyard, HSH Nordbank in early March 2009 had a new management, first performed by non-family member since 1635.[1]

Insolvency of old Yard

After the shake of the global recession in 2009, especially container shipping fell sharply and J.J. Sietas had to contend with numerous cancellations and dwindling backlog, turned it from container ship off and wanted to concentrate on niches in the specialty shipbuilding. These include heavy lift vessels, ferries, offshore vessels. The last container ship was completed in November 2009. On November 6, 2009, the 393rd and last container ship or feeder was delivered. In December 2010, Sietas has received an order for the first in Germany to be built offshore wind power transport and installation vessel, named Aeolus, which until February 2014 for the Dutch Van Oord-group was built, this ship was the last one and even biggest built in shipyard, before to be overtaken from Russian Pella in April 2014.[2]

At November 17, 2011 due to excessive indebtedness an application for bankruptcy made, insolvency proceedings were made by order of 1 February 2012. On 22 May 2012, the insolvency administrator Berthold Brinkmann was announced and end of June decided the creditors' committee, the three Sietas companies (Sietas shipyard, Neuenfelder Maschinenfabrik and Norderwerft) for sale separately. The Sietas shipyard was sold to Pella, the Norderwerft was sold to Bremer Lürssen and Neuenfelder Maschinenfabrik (NMF), which makes Cranes, was approved by the Norwegian TTS Group ASA to be acquired.

In February 2014, the Sietas shipyard was of the Terra Line GmbH in Hamburg, which in the St. Petersburg resident Pella Shipyard adopted. Under the agreement, the yard for at least eight years must continue to operate and 120 employees were taken back. The name of the shipyard company was after the takeover in 'Pella Sietas GmbH changed.

Situation

The shipyard employs about 200 employees (2017), which still intend to produce various types of vessels on a factory area of around 100.000m².

First ship entirely made in Yard was a small passenger ferry named Elbphilarmonie for Hadag Hamburg. [3] In addition, repairs to Hamburg Ferries and Barges were developed. A second one named Kehrwieder was also done on 2018.

Since then, several Ships' Sections were made to Meyer shipyard in Papenburg for large cruise ships and modular sections to passengers'ferry an Lake Constance [4][5]

Construction contract for eco-friendly two ends ferry hybrid ferry to finish on 2020, in which has 74.30 m in length, 13.40 m wide, draft of 1.75 m and 325 t for Norderney Frisia. With this the from 2010 Management Yard concentrates building Ferries. [6]

Gallery

Literature

  • 375 Jahre Sietas Werft. In: Schiff & Hafen, Heft 10/2010, S. 21–90, Seehafen-Verlag, Hamburg 2010, ISSN 0938-1643
  • Eckhard-Herbert Arndt: Neue Hoffnung für Traditionswerft. In: Hansa, Heft 1/2012, S. 24/25, Schiffahrts-Verlag Hansa, Hamburg 2012, ISSN 0017-7504

References

External links