USS Macdonough (DDG-39)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 07:11, 31 January 2014 (→‎References: Fix CS1 deprecated date parameter errors). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

USS MacDonough (DDG-39)
USS MacDonough (DDG-39)
History
US
NamesakeThomas Macdonough
BuilderFore River Shipyard, Bethlehem Steel Corporation
Laid down15 April 1958
Launched9 July 1959
Commissioned4 November 1961
Decommissioned23 October 1992
Stricken30 November 1992
FateAs of August 2004 Metro Machine was scrapping MacDonough pierside in Philadelphia.
General characteristics
Class and typeFarragut-class destroyer
Displacement5,800 tons
Length512.5 ft (156.2 m)
Beam52 ft (15.8 m)
Draft25 ft (7.6 m)
Propulsion4 1200psi boilers, 2 geared turbines
Speed33 knots
Complement377 (21 officers + 356 enlisted)
Armamentone Mk 42 5-inch/54 (127mm/54) caliber gun, Mk 46 torpedoes from two Mk-32 triple mounts, one Mk 16 ASROC Missile Launcher, one Mk 10 Mod 0 Missile Launcher for Standard Missile, two Mk 141 Harpoon missile launchers

USS MacDonough (DLG-8/DDG-39) named for Commodore Thomas Macdonough was the 4th ship of the United States Navy to be named for him.

The fourth Macdonough was projected as DL-8, but redesignated DLG-8 prior to keel laying by the Fore River Shipyard, Bethlehem Steel Co., Quincy, Massachusetts, 16 April 1958; launched 9 July 1959, sponsored by Mrs. Agnes Macdonough Wilson, great-granddaughter of Commodore Thomas Macdonough; and commissioned 4 November 1961, Comdr. Wm. G. Hurley in command.

The guided-missile frigate Macdonough, having undergone an extended shakedown and training period, reported to her home port at Charleston, S.C., 23 September 1962 and assumed duties as flagship for Commander, Cruiser-Destroyer Flotilla 6, U.S. Atlantic Fleet. A month later she joined other units of the U.S. 2nd Fleet in enforcing the Cuban quarantine, remaining with that force until it was dissolved on Thanksgiving Day. The first 3 months of 1963 were spent firing missiles off the coast of Florida under the auspices of the Operational Test and Evaluation Force. She returned to Charleston in March and operated in the Charleston-Norfolk area until departing on her first U.S. 6th Fleet deployment 4 June.

The frigate cruised the Mediterranean until the following fall, taking part in scheduled fleet exercises and training operations. Upon her return to the East Coast, 26 October, she resumed operations in the Charleston area. With the new year, 1964, Macdonough steamed south to Puerto Rico for training exercises with the 2nd Fleet. During these exercises; she participated in an Atlantic Fleet live-firing antiair warfare exercise, which included missile firing at drone aircraft. The ship returne d to Charleston for 2 weeks in February, and then put out to sea again for carrier exercises off the East Coast followed by helicopter evaluation tests in the Atlantic.

Macdonough's second Mediterranean deployment, 10 July to 22 December 1964, was followed by a 6-month overhaul at the Charleston Naval Shipyard. Coastal operations out of home port occupied the frigate until mid-September 1965, when she proceeded to the Atlantic Fleet Missile Range and then to Guantanamo Bay, Cuba, for training exercises. Having returned to her Charleston home port in early November, Macdonough prepared for another Mediterranean deployment, departing Charleston at the end of the month. Macdonough served as flagship for the recovery effort of the Palomares Incident during the third Mediterranean deployment.[1]

On 8 April 1966, Macdonough returned to South Carolina and once again resumed operations and fleet and squadron exercises along the southern east coast and in the Caribbean. During the summer a midshipman training cruise took the frigate to several east coast ports and to the Caribbean. After participating in "LANTFLEX 66," and AAW/ASW/amphibious exercise, she returned to Charleston 16 December.

After conducting further exercises off the east coast, Macdonough prepared once again for overseas movement; and, on 2 May 1967, she departed Charleston for her fourth Mediterranean cruise. She conducted summer midshipmen training, visited various Mediterranean ports and participate in several joint exercises with ships of Allied navies, returning to South Carolina 28 October.

Macdonough continued operating with the 2nd Fleet until May 1968 when she again deployed to the Mediterranean, returning to her home port in September. She remained off the east coast into 1969.


Notes

  1. ^ Melson, June 1967, p.31

References

  • Public Domain This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
  • Melson, Lewis B., CAPT USN (June 1967). "Contact 261". United States Naval Institute Proceedings. {{cite journal}}: Cite journal requires |journal= (help)CS1 maint: multiple names: authors list (link)

External links