Incheon Bridge

Coordinates: 37°24′50″N 126°34′0″E / 37.41389°N 126.56667°E / 37.41389; 126.56667
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ZéroBot (talk | contribs) at 11:33, 8 January 2012 (r2.7.1) (Robot: Adding pl:Most Incheon). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Incheon Bridge
Incheon Bridge
Incheon Bridge under construction
Coordinates37°24′50″N 126°34′0″E / 37.41389°N 126.56667°E / 37.41389; 126.56667
Carries6-lane motorway[1][2]
LocaleIncheon, South Korea[1]
Characteristics
DesignCable-stayed bridge[1]
Total length21.38 kilometres (13.28 mi)[3]
Width33.4 metres (110 ft)[2]
Height230.5 metres (756 ft) (pylons)[3]
Longest span800 metres (2,600 ft)[3]
No. of spans5[1]
Clearance below74 metres (243 ft)[3]
History
Construction start2005[1]
Construction end2009[1]
Incheon Bridge is located in South Korea
Incheon Bridge
Location
Map

The Incheon Bridge (also called the Incheon Grand Bridge) is a newly-constructed reinforced concrete bridge in South Korea. At its opening in October 2009, it became the second connection between Yeongjong Island and the mainland of Incheon. The Incheon Bridge is South Korea's longest spanning cable-stayed bridge.[4] In comparison, the Incheon Bridge is the world's seventh longest cable-stayed bridge as of October 2010.[5] The main purpose of the bridge is to provide direct access between Songdo and Incheon International Airport, reducing travel time between them by up to one hour.

The sea crossing bridge section, whose concessionaire is Incheon Bridge Corporation, is funded by the private sector. Korea Expressway Corporation and the Korean Ministry of Land, Transport and Maritime Affairs (MLTM) managed the project.

Construction

The main design and build contractor was Samsung C&T Corporation. Additional contractors that contributed to the construction of the bridge were Halcrow, Dasan Consultants, and Arup.[4] Total costs exceeded $1.4 billion (~1.25 trillion KRW) to build. The 21.38 kilometres (13.3 mi) long highway project consisted of government-built sections at three ends and a 12.34 kilometres (7.7 mi) section in the middle built with private capital, the bridge section is 18,384 metres (60,315 ft) long. The bridge has a cable stayed section over the main sea route to Incheon port. This was the most difficult part to construct, with a main tower 230.5 metres (756.2 ft) high, vertical clearance of 74 m (243 ft), and five spans: a centre span of 800 m (2,625 ft) flanked on either side by spans of 260 m (853 ft) and 80 m (262 ft). Adjacent to the center section are approach spans consisting of a series of 150 m (492 ft) balanced cantilever spans. Lower level viaducts consisting of 50 m (164 ft) spans connect to land at each end of the bridge.

Design

Because the bridge is situated in a known seismically-active region, a seismic design of the substructure was adopted.[4]

Notable Incidents

On May 20, 2010, twelve passengers were killed in a bus crash at Incheon Bridge, Seoul. [6]

References

  1. ^ a b c d e f Incheon Bridge at Structurae
  2. ^ a b "Incheon Bridge, Seoul - Road Traffic Technology". London, United Kingdom; Melbourne, Australia: Net Resources International. Retrieved 2009-10-18. {{cite web}}: Cite has empty unknown parameters: |trans_title=, |month=, |separator=, and |coauthors= (help)
  3. ^ a b c d [1]
  4. ^ a b c "Incheon bridge". arup.com. Retrieved 2011-01-02.
  5. ^ "Halcrow: Incheon bridge". halcrow.com. Retrieved 2011-01-02.
  6. ^ On July 3rd 2010, Eleven killed in bus crash in Incheon Bridge, Seoul

External links