Taihe station
Appearance
This article needs additional citations for verification. (March 2021) |
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 太和站 | ||||||||||
Traditional Chinese | 太和站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Guangcong Highway (G105), Dali Road, Kequan Road, Baiyun District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 14 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 14 04 | ||||||||||
History | |||||||||||
Opened | 28 December 2018 | ||||||||||
Services | |||||||||||
|
Taihe station (Chinese: 太和站), is a station of Line 14 of the Guangzhou Metro. It started operations on 28 December 2018.[1]
The station has an underground island platform. Platform 1 is for trains heading to Dongfeng, whilst platform 2 is for trains heading to Jiahewanggang, along with 2 unused bypass tracks next to the stopping tracks.
Exits
There are 4 exits, lettered A, C, D and E. Exit E is accessible. All exits are located on Guangcong No. 3 Road.
Gallery
-
Concourse
-
Platform 1 Panorama
-
Artwork
-
Exit E
References
- ^ "Line 14 Service Time". Guangzhou Metro. Guangzhou Metro. Retrieved 31 December 2017.