Jump to content

Niagara Falls Suspension Bridge: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Bibliography: Archived link
Revamp citation format; update Walsh's date based on tombstone
Line 42: Line 42:
Throughout its years of service, the Suspension Bridge stood strong and allowed thousands of passengers and trains to pass over it safely. Its success proved that, contrary to general opinion, a safe and operational railway suspension bridge was tenable, and allayed concerns induced by the 1854 collapse of the [[Wheeling Suspension Bridge]]. Slowly decaying, the bridge's wooden structures were replaced with steel and iron versions by 1886, and the renovated bridge was stronger, capable of bearing a heavier load. By the end of the 19th century, the weight of trains had increased greatly and far exceeded the maximum capacity of the bridge. The Suspension Bridge was finally replaced by the Steel Arch Bridge, which was later renamed the [[Whirlpool Rapids Bridge]], on August 27, 1897. When the Suspension Bridge was dismantled, its wire cables were found not to have noticeably degraded, a testament to its strength and design.
Throughout its years of service, the Suspension Bridge stood strong and allowed thousands of passengers and trains to pass over it safely. Its success proved that, contrary to general opinion, a safe and operational railway suspension bridge was tenable, and allayed concerns induced by the 1854 collapse of the [[Wheeling Suspension Bridge]]. Slowly decaying, the bridge's wooden structures were replaced with steel and iron versions by 1886, and the renovated bridge was stronger, capable of bearing a heavier load. By the end of the 19th century, the weight of trains had increased greatly and far exceeded the maximum capacity of the bridge. The Suspension Bridge was finally replaced by the Steel Arch Bridge, which was later renamed the [[Whirlpool Rapids Bridge]], on August 27, 1897. When the Suspension Bridge was dismantled, its wire cables were found not to have noticeably degraded, a testament to its strength and design.


==Conception and building==
== Conception and building ==
In the middle of the 19th century, the hinterlands of the North American East Coast were opened up rapidly; colonists moved further inland, pushing back the wilderness and establishing settlements that grew into towns and cities. The growth of these centers of civilization was fueled by the increasing number of [[trade route|routes set up to facilitate trade]] among the settlements.<ref>Grant (2006), 43.</ref> Canadian entrepreneur and politician [[William Hamilton Merritt]] was a major contributor to the establishment of several trade routes in his country. His primary focus was on the lakes and the dredging of waterways to open up trade between the lake cities. He also showed interest in railroads, envisioning a network that connected cities on both sides of the United States–Canadian border from the Atlantic coast in the East to the new territories in the West. Merritt's dream would lead to the creation of a man-made structure, a railway [[suspension bridge]], that spanned the [[Niagara River]] alongside the river's acclaimed natural feature, the [[Niagara Falls]].<ref>Talman (2000).</ref>
In the middle of the 19th century, the hinterlands of the North American East Coast were opened up rapidly; colonists moved further inland, pushing back the wilderness and establishing settlements that grew into towns and cities. The growth of these centers of civilization was fueled by the increasing number of [[trade route|routes set up to facilitate trade]] among the settlements.{{Sfn|Grant|Jones|2006|p=43}} Canadian entrepreneur and politician [[William Hamilton Merritt]] was a major contributor to the establishment of several trade routes in his country. His primary focus was on the lakes and the dredging of waterways to open up trade between the lake cities. He also showed interest in railroads, envisioning a network that connected cities on both sides of the United States–Canadian border from the Atlantic coast in the East to the new territories in the West. Merritt's dream would lead to the creation of a man-made structure, a railway [[suspension bridge]], that spanned the [[Niagara River]] alongside the river's acclaimed natural feature, the [[Niagara Falls]].{{Sfn|Talman|2000}}


[[File:William Hamilton Merritt (engraving).jpg|left|thumb|upright|alt=A white-haired man in a suit and bowtie faces the right.|[[William Hamilton Merritt]] was the chief proponent for the Suspension Bridge, persevering to obtain charters for the bridge.]]
[[File:William Hamilton Merritt (engraving).jpg|left|thumb|upright|alt=A white-haired man in a suit and bowtie faces the right.|[[William Hamilton Merritt]] was the chief proponent for the Suspension Bridge, persevering to obtain charters for the bridge.]]
Merritt's vision for the Niagara Suspension Bridge was conceived at the Niagara River itself.{{Ref label|start|a|none}} In the summer of 1844 while taking a picnic on the river shores, near what was then the town of [[Clifton Hill (Niagara Falls)|Clifton]], Merritt read a letter from his sons to his wife. The younger Merritts were touring Europe and visited the town of [[Fribourg]], Switzerland. Amazed by the Freiburg Suspension Bridge,<ref>Buck (1898), 125.</ref> they wrote to their parents, describing the wonders of the bridge in eloquent terms. Their writing had a profound effect on their parents, and the elder Merritts wondered if such a suspension bridge could be built across the Niagara.<ref>Merritt (1875), "1844", 279.</ref> Merritt was driven to realize that vision, and he approached the relevant authorities, including the Queen of England,<ref>Merritt (1875), "1846", 313.</ref> for permission to start the construction of the suspension bridge. His efforts were rewarded in 1846; the state of New York and the government of Canada approved the charters to form the Niagara Falls International Bridge Company and the Niagara Falls Suspension Bridge Company, respectively.<ref>Tyrrell (1911), 222–223.</ref>
Merritt's vision for the Niagara Suspension Bridge was conceived at the Niagara River itself.{{#tag:ref|Merritt was not alone in dreaming of a suspension bridge across the Niagara. Engineers Francis Hall, Charles Ellet, Jr., and Charles B. Stuart had individually spoke about such an idea in the years before the Suspension Bridge was started.<ref>{{Harvnb|Irwin|1996|pp=32&ndash;33}}; {{Harvnb|Bianculli|2003|pp=68&ndash;69}}</ref>|group=nb}} In the summer of 1844 while taking a picnic on the river shores, near what was then the town of [[Clifton Hill (Niagara Falls)|Clifton]], Merritt read a letter from his sons to his wife. The younger Merritts were touring Europe and visited the town of [[Fribourg]], Switzerland. Amazed by the Freiburg Suspension Bridge,{{Sfn|Buck|Buck|1898|p=125}} they wrote to their parents, describing the wonders of the bridge in eloquent terms. Their writing had a profound effect on their parents, and the elder Merritts wondered if such a suspension bridge could be built across the Niagara.{{Sfn|Merritt|1875|p=279}} Merritt was driven to realize that vision, and he approached the relevant authorities, including the Queen of England,{{Sfn|Merritt|1875|p=313}} for permission to start the construction of the suspension bridge. His efforts were rewarded in 1846; the state of New York and the government of Canada approved the charters to form the Niagara Falls International Bridge Company and the Niagara Falls Suspension Bridge Company, respectively.{{Sfn|Tyrrell|1911|pp=222&ndash;223}}


In the years before the first bridge was built over the Niagara River, the river was crossed entirely by boats. Powered by steam engines, vessels ferried people and carriages across the raging river at calmer points of the water. One of these vessels was the ''[[Maid of the Mist]]'', the first tourist boat to ply the waters of the Niagara River. Named after a local legend, the steamer began service in 1846.<ref>Wilson (1990), 26–27.</ref> Launching from a point {{convert|2|mi|km}} below the [[Horseshoe Falls]], it chugged up to the base of the falls, offering a close-up view of the natural wonder to its passengers, before moving to the opposite shore. The site for the Suspension Bridge was half a mile (0.8&nbsp;km) from the ''Maid of the Mist''{{'}}s landings.<ref>Disturnell (1864), 121.</ref> The selection of the bridge site was based more on aesthetics than technical ease; it was the narrowest point of the gorge—{{convert|800|ft|m}} across and {{convert|230|ft|m}} deep—that allowed a full view of the falls from the American side.<ref name=Irwin>Irwin (1996), 33.</ref>{{Ref label|fall|b|none}}
In the years before the first bridge was built over the Niagara River, the river was crossed entirely by boats. Powered by steam engines, vessels ferried people and carriages across the raging river at calmer points of the water. One of these vessels was the ''[[Maid of the Mist]]'', the first tourist boat to ply the waters of the Niagara River. Named after a local legend, the steamer began service in 1846.{{Sfn|Wilson|1990|pp=26&ndash;27}} Launching from a point {{convert|2|mi|km}} below the [[Horseshoe Falls]], it chugged up to the base of the falls, offering a close-up view of the natural wonder to its passengers, before moving to the opposite shore. The site for the Suspension Bridge was half a mile (0.8&nbsp;km) from the ''Maid of the Mist''{{'}}s landings.{{Sfn|Disturnell|1864|p=121}} The selection of the bridge site was based more on aesthetics than technical ease; it was the narrowest point of the gorge—{{convert|800|ft|m}} across and {{convert|230|ft|m}} deep—that allowed a full view of the falls from the American side.{{Sfn|Irwin|1996|p=33}}{{#tag:ref|The Horseshoe Falls have receded 3&ndash;6&nbsp;feet (0.9&ndash;1.8&nbsp;metres) per year before the 1950s and are receding at a rate of 1&ndash;2&nbsp;feet (0.3&ndash;0.6&nbsp;metres) per year thereafter. Due to this erosion, it may no longer be visible from the location stated in the article.{{Sfn|Tesmer|Bastedo|1981|pp=90, 199}}|group=nb}}


After the bridge companies were founded, they invited engineers to submit plans and cost estimates for a suspension bridge that carried a railway. The invitation was met with skepticism among the engineering community. At that time, there was not a suspension bridge that could allow a train to pass over it safely.<ref>Irwin (1996), 34.</ref> While the Europeans were erecting suspension bridges by the hundreds,<ref>Scott (2001), "Modern Beginnings in America and Europe", 2–7.</ref> the Americans mostly ignored them out of safety concerns; in 1831 Sir [[Samuel Brown (Royal Navy officer)|Samuel Brown]]'s [[Broughton Suspension Bridge]] in Britain had collapsed under the marching feet of a troop of soldiers, sending those on its deck into the [[River Irwell]].<ref>Scott (2001), "Modern Beginnings in America and Europe", 3.</ref>{{Ref label|brou|c|none}} Furthermore, many American bridges had collapsed without experiencing weight and pressure equivalent to railroad traffic, and American engineers feared that any railway bridge would likely fail—especially a suspension bridge.<ref name=mc73>McCullough (2001), "The Genuine Language of America", 73.</ref>
After the bridge companies were founded, they invited engineers to submit plans and cost estimates for a suspension bridge that carried a railway. The invitation was met with skepticism among the engineering community. At that time, there was not a suspension bridge that could allow a train to pass over it safely.{{Sfn|Irwin|1996|p=34}} While the Europeans were erecting suspension bridges by the hundreds,{{Sfn|Scott|2001|pp=2&ndash;7}} the Americans mostly ignored them out of safety concerns; in 1831 Sir [[Samuel Brown (Royal Navy officer)|Samuel Brown]]'s [[Broughton Suspension Bridge]] in Britain had collapsed under the marching feet of a troop of soldiers, sending those on its deck into the [[River Irwell]].{{Sfn|Scott|2001|p=3}}{{#tag:ref|According to the Skempton source, the Broughton Suspension Bridge's designer could instead be Thomas Cheek Hewes, a manufacturer who also built bridges.{{Sfn|Skempton|Chrimes|2002|p=321}}|group=nb}} Furthermore, many American bridges had collapsed without experiencing weight and pressure equivalent to railroad traffic, and American engineers feared that any railway bridge would likely fail—especially a suspension bridge.{{Sfn|McCullough|2001|p=73}}


Four engineers responded: Edward Serrell, Samuel Keefer, [[Charles Ellet, Jr.]], and [[John A. Roebling|John Augustus Roebling]]. All submitted designs for a suspension bridge. At the time of the bidding, Ellet and Roebling were acknowledged as masters of suspension bridge building in America. Roebling submitted two designs, a conservative single-deck suspension bridge and a double-decked version,<ref>Griggs (November 2006), 81.</ref> both with meticulous calculations and drawings. Instead of relying solely on submissions, Charles Ellet, Jr. took a proactive approach. When he got wind of the project in 1845, he wrote to [[Charles B. Stuart]], chief engineer of the [[Great Western Railway (Ontario)|Great Western Railway]],{{Ref label|Stu|d|none}} boldly proclaiming that he could build a bridge for any likely purpose across the Niagara. After the charters had been obtained, Ellet helped Stuart to sell the bridge companies' stock and offered to buy [[United States dollar|US$]]30,000{{Ref label|money|e|none}} worth of stock himself. His efforts earned him the $190,000 bridge contract on November 9, 1847.<ref>Griggs (October 2006), 51–52.</ref>
Four engineers responded: Edward Serrell, Samuel Keefer, [[Charles Ellet, Jr.]], and [[John A. Roebling|John Augustus Roebling]]. All submitted designs for a suspension bridge. At the time of the bidding, Ellet and Roebling were acknowledged as masters of suspension bridge building in America. Roebling submitted two designs, a conservative single-deck suspension bridge and a double-decked version,{{Sfn|Griggs|2006b|p=81}} both with meticulous calculations and drawings. Instead of relying solely on submissions, Charles Ellet, Jr. took a proactive approach. When he got wind of the project in 1845, he wrote to [[Charles B. Stuart]], chief engineer of the [[Great Western Railway (Ontario)|Great Western Railway]],{{#tag:ref|Stuart and Merritt, at this time, were leading the joint ventures that formed the bridge companies.{{Sfn|Irwin|1996|p=33}}|group=nb}} boldly proclaiming that he could build a bridge for any likely purpose across the Niagara. After the charters had been obtained, Ellet helped Stuart to sell the bridge companies' stock and offered to buy [[United States dollar|US$]]30,000{{#tag:ref|All monetary units in this article are of the United States dollar. According to the [[Bank of Canada]], the US$ was used in Canada up to the 1850s and '60s; moreover, the Canadian dollar&mdash;during its inception in the 1860s and '70s&mdash;was equal in value to the US$.{{Sfn|Powell|1999}}|group=nb}} worth of stock himself. His efforts earned him the $190,000 bridge contract on November 9, 1847.{{Sfn|Griggs|2006a|pp=51&ndash;52}}


===Charles Ellet, Jr.'s temporary bridge===
=== Charles Ellet, Jr.'s temporary bridge ===
{{details|Charles Ellet, Jr.|the engineer}}
{{details|Charles Ellet, Jr.|the engineer}}
[[File:Charles Ellet Jr Daguerreotype.jpg|thumb|upright|alt=Side profile of a man who has his hair combed back|[[Charles Ellet, Jr.]], the first American-born civil engineer with European education in engineering, campaigned for suspension bridges in United States.]]
[[File:Charles Ellet Jr Daguerreotype.jpg|thumb|upright|alt=Side profile of a man who has his hair combed back|[[Charles Ellet, Jr.]], the first American-born civil engineer with European education in engineering, campaigned for suspension bridges in United States.]]
While growing up on a farm in Pennsylvania, Charles Ellet, Jr. scraped through odd jobs, but saved enough money to finance an education at the [[École nationale des Ponts et Chaussées]] in France.<ref>Griggs (October 2006), 50.</ref> After attending four months of lectures, he toured Europe before returning to the United States as the only native-born American with European education in engineering. Ellet announced his ambitions to build suspension bridges in his country of birth by proposing to span the [[Potomac River]] with one. His proposal was ignored; few were willing to heed a young, inexperienced and impetuous engineer.<ref>Trachtenberg (1979), 53.</ref> To gain experience, Ellet started to work on railroads and canals, and later became the chief engineer on the [[James River and Kanawha Canal]] project. He further improved his reputation by contributing articles about suspension bridges to respected engineering journals, such as ''American Railroad Journal''; eventually, Ellet built his first suspension bridge over the [[Schuylkill River]], Pennsylvania, in 1842.<ref>Griggs (October 2006), 50–51.</ref>
While growing up on a farm in Pennsylvania, Charles Ellet, Jr. scraped through odd jobs, but saved enough money to finance an education at the [[École nationale des Ponts et Chaussées]] in France.{{Sfn|Griggs|2006a|p=50}} After attending four months of lectures, he toured Europe before returning to the United States as the only native-born American with European education in engineering. Ellet announced his ambitions to build suspension bridges in his country of birth by proposing to span the [[Potomac River]] with one. His proposal was ignored; few were willing to heed a young, inexperienced and impetuous engineer.{{Sfn|Trachtenberg|1979|p=53}} To gain experience, Ellet started to work on railroads and canals, and later became the chief engineer on the [[James River and Kanawha Canal]] project. He further improved his reputation by contributing articles about suspension bridges to respected engineering journals, such as ''American Railroad Journal''; eventually, Ellet built his first suspension bridge over the [[Schuylkill River]], Pennsylvania, in 1842.{{Sfn|Griggs|2006a|pp=50&ndash;51}}


Ellet had the looks of an actor,<ref name=mc74>McCullough (2001), "The Genuine Language of America", 74.</ref> which were complemented by his entertaining oratorical skills.<ref name=mc73 /> He took advantage of these characteristics, and used showmanship and dramatics to market his proposals. These skills helped to win him attention and raise his profile both in the public and within the industry. However, his imperiousness also ruffled the feathers of people, which caused conflicts.<ref>Trachtenberg (1979), 51, 54.</ref> Nonetheless, his capability to promote himself had won him the contracts for the Suspension Bridge and the later [[Wheeling Suspension Bridge]]; the Wheeling contract was won in July 1847 while Ellet's plan for the Niagara Suspension Bridge was still in its initial stages of construction. Ellet's initial design for the bridge at Niagara placed all forms of transportation on a single deck. The [[Rail tracks|railway track]] was in the middle of the deck, sandwiched between carriageways and footpaths on the outer sides.<ref>Griggs (October 2006), 52.</ref> Moreover, trains would not go over the bridge; their cars would be disconnected from the heavy locomotives and pulled across the bridge by horses, cables, or lighter {{convert|6|ST|t|lk=on|adj=on}} engines.<ref name=bian70>Bianculli (2003), 70.</ref> Before the work could begin, Ellet faced the problem of all suspension bridge construction: getting a line across the gap.
Ellet had the looks of an actor,{{Sfn|McCullough|2001|p=74}} which were complemented by his entertaining oratorical skills.{{Sfn|McCullough|2001|p=73}} He took advantage of these characteristics, and used showmanship and dramatics to market his proposals. These skills helped to win him attention and raise his profile both in the public and within the industry. However, his imperiousness also ruffled the feathers of people, which caused conflicts.{{Sfn|Trachtenberg|1979|pp=51, 54}} Nonetheless, his capability to promote himself had won him the contracts for the Suspension Bridge and the later [[Wheeling Suspension Bridge]]; the Wheeling contract was won in July 1847 while Ellet's plan for the Niagara Suspension Bridge was still in its initial stages of construction. Ellet's initial design for the bridge at Niagara placed all forms of transportation on a single deck. The [[Rail tracks|railway track]] was in the middle of the deck, sandwiched between carriageways and footpaths on the outer sides.{{Sfn|Griggs|2006a|p=52}} Moreover, trains would not go over the bridge; their cars would be disconnected from the heavy locomotives and pulled across the bridge by horses, cables, or lighter {{convert|6|ST|t|lk=on|adj=on}} engines.{{Sfn|Bianculli|2003|p=70}} Before the work could begin, Ellet faced the problem of all suspension bridge construction: getting a line across the gap.


Ellet's brainstorming sessions with his men raised several ideas that could enable a line to be suspended across the gorge; these included firing cannon balls with the line attached, towing it across the river with a steamer, and tying it to a rocket that would then be launched across the gorge. Ultimately the bridge engineer chose an idea inspired by [[Benjamin Franklin]]'s experiment with a [[kite]].<ref>Robertson (1851), 73.</ref> It was similar to 15th century inventor [[Leonardo da Vinci]]'s plan to span a gap.<ref>MacKenzie (2003).</ref> Ellet also took the opportunity to generate publicity for his project. Organizing a kite-flying contest, he offered $5{{Ref label|A|f|none}} to any boy who flew a kite across the gorge and secured the kite string to the other side.<ref name=mc74 /> Youths from nearby towns flocked in to participate. Unlike the other boys who flew their kites from the United States side of the gorge, 15-year-old Homan Walsh{{Ref label|B|g|none}} crossed the river by a ferry upstream and walked to the Canadian side of the bridge site to launch his kite. He almost succeeded on his first attempt; his kite flew across but crashed just short of the shore. After resting several days at a friend's house, Walsh finally got his kite across the gorge and secured its line to a tree.<ref name=rob>Robinson (2005).</ref>
Ellet's brainstorming sessions with his men raised several ideas that could enable a line to be suspended across the gorge; these included firing cannon balls with the line attached, towing it across the river with a steamer, and tying it to a rocket that would then be launched across the gorge. Ultimately the bridge engineer chose an idea inspired by [[Benjamin Franklin]]'s experiment with a [[kite]].{{Sfn|Robertson|1851|p=73}} It was similar to 15th century inventor [[Leonardo da Vinci]]'s plan to span a gap.{{Sfn|MacKenzie|2003}} Ellet also took the opportunity to generate publicity for his project. Organizing a kite-flying contest, he offered $5{{#tag:ref|The prize money was stated to be $5 or $10 among various sources. This article follows the McCullough source.{{Sfn|McCullough|2001|p=74}}|group=nb}} to any boy who flew a kite across the gorge and secured the kite string to the other side.{{Sfn|McCullough|2001|p=74}} Youths from nearby towns flocked in to participate. Unlike the other boys who flew their kites from the United States side of the gorge, 16-year-old Homan Walsh{{#tag:ref|Similarly, Homan Walsh was either a 10-year-old or 15-year-old boy depending on the source. Bob White, a kite flying enthusiast and authority, found that Walsh's birth was inscribed as March 24, 1831 on his tombstone. This article follows the age as determined from the tombstone.{{Sfn|White|2010}}|group=nb}} crossed the river by a ferry upstream and walked to the Canadian side of the bridge site to launch his kite. He almost succeeded on his first attempt; his kite flew across but crashed just short of the shore. After resting several days at a friend's house, Walsh finally got his kite across the gorge and secured its line to a tree.{{Sfn|Robinson|2005}}


[[File:Ellet's Niagara car.jpg|thumb|left|alt=A basket made of iron bars sit among artefacts, such as plaques, portrait collages, and cannon.|The basket, in which Charles Ellet crossed the Niagara Gorge, is on display at the [[Buffalo and Erie County Historical Society Building|Buffalo Historical Society]].]]
[[File:Ellet's Niagara car.jpg|thumb|left|alt=A basket made of iron bars sit among artefacts, such as plaques, portrait collages, and cannon.|The basket, in which Charles Ellet crossed the Niagara Gorge, is on display at the [[Buffalo and Erie County Historical Society Building|Buffalo Historical Society]].]]
Charles Ellet and his team tied a heavier line to the kite string and pulled the joined lines across. They pulled successive heavier and stronger lines across until the final bridge cable—{{convert|7/8|in|cm|lk=on}} thick—was hanging across the gorge. The cable was suspended between two wooden towers {{convert|40|ft|m}} feet tall, and it was attached to an iron basket. Ellet planned to use this system as a basket ferry to shuttle workers and materials across the gorge, saving time that would otherwise have been spent on land and ferry travel.<ref>Kostoff (2008), 117.</ref> Through media coverage and word-of-mouth, many people knew of Ellet's efforts and flocked to the site to watch the construction. On March 13, 1848, the system was completed, and the team planned to test it by pulling the empty basket across. They hit a snag when the basket kept getting stuck halfway and could not move ahead. Pulling back the basket, Ellet decided to assure the watching crowd that the system was workable. He stepped into the basket, and it moved towards the opposite shore. When Ellet reached the problematic spot, he spotted the issue; the basket's rollers could not pass over a portion of the cable that had been accidentally flattened during the construction.<ref>Kostoff (2008), 119.</ref> He fixed the problem and proceeded to cross to the Canadian side and back, becoming the first person to cross the gorge.<ref name=mc75>McCullough (2001), "The Genuine Language of America", 75.</ref> Although the bridge companies had prohibited Ellet from collecting tolls, he charged each person $1.00{{Ref label|toll|h|none}} for the chance to "observe first hand the engineering wonder of bridging the Niagara".<ref name=rob /> On some days, the basket ferry conveyed up to 125 people across the gorge.<ref name=crab>Crabtree (1901), 360.</ref>
Charles Ellet and his team tied a heavier line to the kite string and pulled the joined lines across. They pulled successive heavier and stronger lines across until the final bridge cable—{{convert|7/8|in|cm|lk=on}} thick—was hanging across the gorge. The cable was suspended between two wooden towers {{convert|40|ft|m}} feet tall, and it was attached to an iron basket. Ellet planned to use this system as a basket ferry to shuttle workers and materials across the gorge, saving time that would otherwise have been spent on land and ferry travel.{{Sfn|Kostoff|2008|p=117}} Through media coverage and word-of-mouth, many people knew of Ellet's efforts and flocked to the site to watch the construction. On March 13, 1848, the system was completed, and the team planned to test it by pulling the empty basket across. They hit a snag when the basket kept getting stuck halfway and could not move ahead. Pulling back the basket, Ellet decided to assure the watching crowd that the system was workable. He stepped into the basket, and it moved towards the opposite shore. When Ellet reached the problematic spot, he spotted the issue; the basket's rollers could not pass over a portion of the cable that had been accidentally flattened during the construction.{{Sfn|Kostoff|2008|p=119}} He fixed the problem and proceeded to cross to the Canadian side and back, becoming the first person to cross the gorge.{{Sfn|McCullough|2001|p=75}} Although the bridge companies had prohibited Ellet from collecting tolls, he charged each person $1.00{{#tag:ref|Although Robinson stated the "toll" as $1.25,{{Sfn|Robinson|2005}} this article follows the $1.00 fee stated by Crabtree and Tyrell.{{Sfn|Crabtree|1901|p=360}}{{Sfn|Tyrrell|1911|p=223}}|group=nb}} for the chance to "observe first hand the engineering wonder of bridging the Niagara".{{Sfn|Robinson|2005}} On some days, the basket ferry conveyed up to 125 people across the gorge.{{Sfn|Crabtree|1901|p=360}}


Continuing his construction, Ellet built two footbridges and joined them together to form an {{convert|8|ft|m||adj=on}} wide suspension bridge. He intended to use this temporary bridge as a scaffold for the construction of the permanent railway bridge.<ref>Irwin (1996), 36.</ref> On July 29, 1848, the bridge builder inaugurated the span in his typical manner; standing in his horse-buggy like a [[gladiator]] in his chariot, Ellet sped across the bridge, which had railings for only a third of its length at that time. His stunt garnered further publicity for the bridge, and the toll collected from the span proved lucrative; $5,000 was collected in less than a year since its official opening on August 1, 1848. Disputes arose between the bridge companies and Ellet over their shares of the money, and their relations turned bitter. The companies charged that Ellet was late in his schedule and withheld payment. Ellet retaliated by mounting cannons at the bridge to claim ownership over it. In the end the matter went to court. The bridge companies paid $10,000 to Charles Ellet, and he left the project to work full-time on the Wheeling Suspension Bridge.<ref>Griggs (October 2006), 52; McCullough (2001), "The Genuine Language of America", 75.</ref>
Continuing his construction, Ellet built two footbridges and joined them together to form an {{convert|8|ft|m||adj=on}} wide suspension bridge. He intended to use this temporary bridge as a scaffold for the construction of the permanent railway bridge.{{Sfn|Irwin|1996|p=36}} On July 29, 1848, the bridge builder inaugurated the span in his typical manner; standing in his horse-buggy like a [[gladiator]] in his chariot, Ellet sped across the bridge, which had railings for only a third of its length at that time. His stunt garnered further publicity for the bridge, and the toll collected from the span proved lucrative; $5,000 was collected in less than a year since its official opening on August 1, 1848. Disputes arose between the bridge companies and Ellet over their shares of the money, and their relations turned bitter. The companies charged that Ellet was late in his schedule and withheld payment. Ellet retaliated by mounting cannons at the bridge to claim ownership over it. In the end the matter went to court. The bridge companies paid $10,000 to Charles Ellet, and he left the project to work full-time on the Wheeling Suspension Bridge.<ref>{{Harvnb|Griggs|2006a|p=52}}; {{Harvnb|McCullough|2001|p=75}}</ref>


The Niagara Suspension Bridge project was in hiatus for three years before the bridge companies engaged another renowned civil engineer, John Augustus Roebling, to complete it. The delay caused Roebling to miss out on the honor of building the first permanent bridge to span the Niagara; Serrell completed the Lewiston Suspension bridge in 1851.<ref name=Mc69>McCullough (2001), "The Genuine Language of America", 69.</ref> Roebling would, however, achieve other honors in building his Niagara Railway Suspension Bridge.<ref name=reier11>Reier (2000), 11.</ref>
The Niagara Suspension Bridge project was in hiatus for three years before the bridge companies engaged another renowned civil engineer, John Augustus Roebling, to complete it. The delay caused Roebling to miss out on the honor of building the first permanent bridge to span the Niagara; Serrell completed the Lewiston Suspension bridge in 1851.{{Sfn|McCullough|2001|p=69}} Roebling would, however, achieve other honors in building his Niagara Railway Suspension Bridge.{{Sfn|Reier|2000|p=11}}


===John Augustus Roebling's railway bridge===
=== John Augustus Roebling's railway bridge ===
{{details|John A. Roebling|the engineer}}
{{details|John A. Roebling|the engineer}}
[[File:Patent no. 4945 - Apparatus for Passing Suspension-Wires for Bridges Across Rivers.jpg|thumb|right|alt=On the top is a cross-sectional sketch of a river. Spanning the gap is a wire, which is suspended between two posts; the ends of the wire are attached to two devices on the opposing banks. At the bottom-left is a wheel traveling on the wire, and at the bottom-right is the cross-sectional view of the wheel.|Roebling's patent no. 4945 for the method to draw wires across gaps. This device was used to build the Suspension Bridge.]]
[[File:Patent no. 4945 - Apparatus for Passing Suspension-Wires for Bridges Across Rivers.jpg|thumb|right|alt=On the top is a cross-sectional sketch of a river. Spanning the gap is a wire, which is suspended between two posts; the ends of the wire are attached to two devices on the opposing banks. At the bottom-left is a wheel traveling on the wire, and at the bottom-right is the cross-sectional view of the wheel.|Roebling's patent no. 4945 for the method to draw wires across gaps. This device was used to build the Suspension Bridge.]]
Born in [[Prussia]] (later a part of Germany), John Augustus Roebling obtained his first conditional engineering degree (''Feldmesserprüfung'') at [[Erfurt]] in 1824. He attended two semesters of lessons at Berlin's [[Bauakademie]] and worked for the Prussian government, constructing military roads.<ref>Roebling (2008), 8.</ref> Tired of the bureaucracy, he resigned his position and left for the United States in 1830, arriving with his brother in Philadelphia on August 6, 1831. Instead of continuing an engineering profession, he took up farming for a living. After five years he married a tailor's daughter, and had eight children with her over the next decade. Agrarian work was unsatisfactory to John Roebling, and in 1837, after the death of his brother and the birth of his first child, he returned to engineering.<ref>Griggs (November 2006), 79.</ref>
Born in [[Prussia]] (later a part of Germany), John Augustus Roebling obtained his first conditional engineering degree (''Feldmesserprüfung'') at [[Erfurt]] in 1824. He attended two semesters of lessons at Berlin's [[Bauakademie]] and worked for the Prussian government, constructing military roads.{{Sfn|Roebling|2008|p=8}} Tired of the bureaucracy, he resigned his position and left for the United States in 1830, arriving with his brother in Philadelphia on August 6, 1831. Instead of continuing an engineering profession, he took up farming for a living. After five years he married a tailor's daughter, and had eight children with her over the next decade. Agrarian work was unsatisfactory to John Roebling, and in 1837, after the death of his brother and the birth of his first child, he returned to engineering.{{Sfn|Griggs|2006b|p=79}}


Roebling first signed on as a surveyor for the Beaver River canal system, launching his career with a string of canal and railroad projects.<ref>Roebling (2008), 37.</ref> Aside from writing articles in engineering journals, Roebling designed his own wire cables<ref name=grigg80>Griggs (November 2006), 80.</ref> and started his own company to manufacture them; the John A. Roebling Company was the first [[wire rope]] manufacturer in the United States.<ref name=tro567>Troyano (2003), "The Second Generation", 567.</ref> Gradually gaining fame for his civil engineering,<ref>Reier (2000), 13.</ref> Roebling finally got to build suspension bridges.<ref name=grigg80 /> His first bridge was the Allegheny Suspension Aqueduct in Pittsburgh. The structure, completed in 1845, was the first suspension aqueduct in the world and the first large American suspension bridge that had multiple spans. Furthermore, it was the first suspension structure built with modern cable spinning techniques—Roebling's own invention.<ref name=scott8>Scott (2001), "Maturity in America—Ellet and Roebling", 8.</ref> Earlier bridge building techniques involved fabricating the main cables at a factory, transporting them to the bridge site, and then stretching the heavy cables over the gap to erect them over the bridge. Roebling, during his experiments with wire ropes, conceived and patented a [[Suspension bridge#Construction sequence (wire strand cable type)|new construction method]] for these main cables. A long line&mdash;the traveler rope&mdash;formed a loop around two horizontal wheels, one on each side of the gorge. A lightweight wheel, "the traveling wheel", was attached to this line, and a wire threaded around this wheel. Like a [[belt (mechanical)|belt]] in a mechanical system, the traveler rope and its wheel moved across the gap as the horizontal wheels turned, pulling the wire along. The traveling wheel effectively hauled two lengths of the same wire (running above and under the traveling wheel) across the gap at a time. The lengths of wire were collected and bound at intervals to form thicker strands, which were later compressed together into the main cables.<ref>McCullough (2001), "The Gigantic Spinning Machine", 63, 377&ndash;381.</ref> which supported themselves and later the proportional weight of the bridge as they were formed.<ref>Troyano (2003), "Stages in Bridge Building", 251.</ref> The method became the standard for suspension bridge construction, and remained unchanged for many years. In the 20th century, suspension bridges were still built with this pulley winding system, albeit with more sophisticated equipment.<ref>Carson (2005).</ref>
Roebling first signed on as a surveyor for the Beaver River canal system, launching his career with a string of canal and railroad projects.{{Sfn|Roebling|2008|p=37}} Aside from writing articles in engineering journals, Roebling designed his own wire cables{{Sfn|Griggs|2006b|p=80}} and started his own company to manufacture them; the John A. Roebling Company was the first [[wire rope]] manufacturer in the United States.{{Sfn|Troyano|2003|p=567}} Gradually gaining fame for his civil engineering,{{Sfn|Reier|2000|p=13}} Roebling finally got to build suspension bridges.{{Sfn|Griggs|2006b|p=80}} His first bridge was the Allegheny Suspension Aqueduct in Pittsburgh. The structure, completed in 1845, was the first suspension aqueduct in the world and the first large American suspension bridge that had multiple spans. Furthermore, it was the first suspension structure built with modern cable spinning techniques—Roebling's own invention.{{Sfn|Scott|2001|p=8}} Earlier bridge building techniques involved fabricating the main cables at a factory, transporting them to the bridge site, and then stretching the heavy cables over the gap to erect them over the bridge. Roebling, during his experiments with wire ropes, conceived and patented a [[Suspension bridge#Construction sequence (wire strand cable type)|new construction method]] for these main cables. A long line&mdash;the traveler rope&mdash;formed a loop around two horizontal wheels, one on each side of the gorge. A lightweight wheel, "the traveling wheel", was attached to this line, and a wire threaded around this wheel. Like a [[belt (mechanical)|belt]] in a mechanical system, the traveler rope and its wheel moved across the gap as the horizontal wheels turned, pulling the wire along. The traveling wheel effectively hauled two lengths of the same wire (running above and under the traveling wheel) across the gap at a time. The lengths of wire were collected and bound at intervals to form thicker strands, which were later compressed together into the main cables.{{Sfn|McCullough|2001|pp=63, 377&ndash;381}} which supported themselves and later the proportional weight of the bridge as they were formed.{{Sfn|Troyano|2003|p=251}} The method became the standard for suspension bridge construction, and remained unchanged for many years. In the 20th century, suspension bridges were still built with this pulley winding system, albeit with more sophisticated equipment.{{Sfn|Carson|2005}}


[[File:John A Roebling.jpg|thumb|upright|left|alt=A man in a suit and bowtie looks to the front. His hairline has receded to the top of his head and he sports a short beard and mustache.|[[John A. Roebling|John Augustus Roebling]] built several prominent suspension bridges in the United States, earning him the esteem of the engineering community.]]
[[File:John A Roebling.jpg|thumb|upright|left|alt=A man in a suit and bowtie looks to the front. His hairline has receded to the top of his head and he sports a short beard and mustache.|[[John A. Roebling|John Augustus Roebling]] built several prominent suspension bridges in the United States, earning him the esteem of the engineering community.]]
John Roebling was a contrasting character to Charles Ellet. Whereas Ellet embellished his proposals with fanciful words and deeds, Roebling presented papers filled with meticulous calculations and drawings.<ref name=mc75 /> The elder engineer was stern and driven to achieve, taking a scientific approach to all interests.<ref name=scott8 /> Rarely did he show emotions in his dealings, even to his closest associates.<ref>McCullough (2001), "Man of Iron", 36–37.</ref> The man, however, dared to confront his detractors and make bold exaltations about his work. He openly called European suspension bridges—including American suspension bridges built with European techniques—weak, and occasionally sniped at Ellet's and Stephenson's works.<ref>Scott (2001), "Maturity in America—Ellet and Roebling", 9–10.</ref><ref>Billington (1985), 76–77.</ref> He announced that his [[Brooklyn Bridge]], when completed, "will not only be the greatest bridge in existence, but it will be the greatest engineering work of this continent, and of the age."<ref name=reier11 /> Roebling's history with Ellet started before the bidding for the Niagara Suspension Bridge, early in their careers. During the bidding for the Schuylkill Suspension Bridge project, Ellet had written a proposal that was published in the ''American Railroad Journal''. Mistakenly believing Ellet had won the contract, Roebling wrote to offer his congratulations and requested to be Ellet's assistant. He received a formal reply without any reference to his request, and his subsequent letter was ignored.<ref name=mc74 /> When Roebling learned that a contractor had won the bid, he successfully applied to be the contractor's chief engineer. Ellet, however, persisted with his tactics and snatched the project away from the contractor; he promoted himself to the bridge company and offered to accept [[Lot (real estate)|land]] instead of cash as payment. From then on, Ellet and Roebling became rivals, vying with each other for suspension bridge projects in North America. Roebling learned from their rivalry. His losses to Ellet showed him that he needed to promote himself and gain backers to effectively secure the contracts he desired.<ref>Trachtenberg (1979), 51, 54–55.</ref>
John Roebling was a contrasting character to Charles Ellet. Whereas Ellet embellished his proposals with fanciful words and deeds, Roebling presented papers filled with meticulous calculations and drawings.{{Sfn|McCullough|2001|p=75}} The elder engineer was stern and driven to achieve, taking a scientific approach to all interests.{{Sfn|Scott|2001|p=8}} Rarely did he show emotions in his dealings, even to his closest associates.{{Sfn|McCullough|2001|pp=36&ndash;37}} The man, however, dared to confront his detractors and make bold exaltations about his work. He openly called European suspension bridges—including American suspension bridges built with European techniques—weak, and occasionally sniped at Ellet's and Stephenson's works.{{Sfn|Scott|2001|pp=9&ndash;10}}{{Sfn|Billington|1985|pp=76–77}} He announced that his [[Brooklyn Bridge]], when completed, "will not only be the greatest bridge in existence, but it will be the greatest engineering work of this continent, and of the age."{{Sfn|Reier|2000|p=11}} Roebling's history with Ellet started before the bidding for the Niagara Suspension Bridge, early in their careers. During the bidding for the Schuylkill Suspension Bridge project, Ellet had written a proposal that was published in the ''American Railroad Journal''. Mistakenly believing Ellet had won the contract, Roebling wrote to offer his congratulations and requested to be Ellet's assistant. He received a formal reply without any reference to his request, and his subsequent letter was ignored.{{Sfn|McCullough|2001|p=74}} When Roebling learned that a contractor had won the bid, he successfully applied to be the contractor's chief engineer. Ellet, however, persisted with his tactics and snatched the project away from the contractor; he promoted himself to the bridge company and offered to accept [[Lot (real estate)|land]] instead of cash as payment. From then on, Ellet and Roebling became rivals, vying with each other for suspension bridge projects in North America. Roebling learned from their rivalry. His losses to Ellet showed him that he needed to promote himself and gain backers to effectively secure the contracts he desired.{{Sfn|Trachtenberg|1979|pp=51, 54&ndash;55}}


When Roebling was called to the Niagara Suspension Bridge project in 1851, he had six suspension structures to his name.<ref>Buck (1898), 126.</ref> He found Ellet's final plan to be impractical; the bridge would have been too heavy and expensive.<ref name=bian69>Bianculli (2003), 69.</ref> Roebling had another design in mind: the double-deck bridge he had proposed earlier during the bidding.{{Ref label|C|i|none}} The lower deck, level with the edge of the chasm, would convey passengers and carriages, and the upper deck, {{convert|18|ft|m}} above, would allow fully laden trains to continue their journeys non-stop,<ref>Holley (1883), 138.</ref> albeit at a speed of {{convert|5|mph|km/h}}. Roebling reasoned that the decks and sufficient [[truss]]es would form a rigid tube, making the bridge stiffer than a normal suspension bridge. The theory was similar to that of the [[tubular bridge]] but implemented at a lower cost.<ref>Billington (1985), 77.</ref> The engineering community was critical of Roebling's project. [[Robert Stephenson]], builder of the tubular [[Britannia Bridge]], was among those short-listed to complete the Niagara Suspension Bridge before Roebling's selection. Stephenson had submitted a design for a tubular bridge, and in 1859 he built a large and expensive tubular bridge for the [[Grand Trunk Railway]] at Montreal, Quebec. The bridge builder then said in derision of Roebling's suspension railway, "If your bridge succeeds, mine is a magnificent blunder."<ref>Irwin (1996), 37, 40, 51.</ref>
When Roebling was called to the Niagara Suspension Bridge project in 1851, he had six suspension structures to his name.{{Sfn|Buck|Buck|1898|p=126}} He found Ellet's final plan to be impractical; the bridge would have been too heavy and expensive.{{Sfn|Bianculli|2003|p=69}} Roebling had another design in mind: the double-deck bridge he had proposed earlier during the bidding.{{#tag:ref|A railway bridge with a double-deck design was suggested by civil engineer [[Squire Whipple]] during the early planning stage of the project.{{Sfn|Bianculli|2003|p=71}}|group=nb}} The lower deck, level with the edge of the chasm, would convey passengers and carriages, and the upper deck, {{convert|18|ft|m}} above, would allow fully laden trains to continue their journeys non-stop,{{Sfn|Holley|1883|p=138}} albeit at a speed of {{convert|5|mph|km/h}}. Roebling reasoned that the decks and sufficient [[truss]]es would form a rigid tube, making the bridge stiffer than a normal suspension bridge. The theory was similar to that of the [[tubular bridge]] but implemented at a lower cost.{{Sfn|Billington|1985|p=77}} The engineering community was critical of Roebling's project. [[Robert Stephenson]], builder of the tubular [[Britannia Bridge]], was among those short-listed to complete the Niagara Suspension Bridge before Roebling's selection. Stephenson had submitted a design for a tubular bridge, and in 1859 he built a large and expensive tubular bridge for the [[Grand Trunk Railway]] at Montreal, Quebec. The bridge builder then said in derision of Roebling's suspension railway, "If your bridge succeeds, mine is a magnificent blunder."{{Sfn|Irwin|1996|pp=37, 40, 51}}


In the face of criticism, Roebling completed the project in four years, using Ellet's bridge as scaffolding. The railway deck was stress-tested by the crossing of the {{convert|23|ST|t|adj=on}} steam engine ''London'' at a speed of {{convert|8|mph|km/h}} on March 8, 1855.<ref name=rob /> Ten days later the upper deck of the bridge was officially opened;<ref>Roebling (1860), 3.</ref> the lower deck had been opened to the public a year earlier.<ref name=bian70 /> As the first commercial passenger train trundled over the bridge, the two countries were finally connected by railroad across the Niagara River. The successful crossings of these and later trains made Roebling's Suspension Bridge the first working suspension railway bridge in history.<ref name=reier11 />{{Ref label|D|j|none}}
In the face of criticism, Roebling completed the project in four years, using Ellet's bridge as scaffolding. The railway deck was stress-tested by the crossing of the {{convert|23|ST|t|adj=on}} steam engine ''London'' at a speed of {{convert|8|mph|km/h}} on March 8, 1855.{{Sfn|Robinson|2005}} Ten days later the upper deck of the bridge was officially opened;{{Sfn|Roebling|1860|p=3}} the lower deck had been opened to the public a year earlier.{{Sfn|Bianculli|2003|p=70}} As the first commercial passenger train trundled over the bridge, the two countries were finally connected by railroad across the Niagara River. The successful crossings of these and later trains made Roebling's Suspension Bridge the first working suspension railway bridge in history.{{Sfn|Reier|2000|p=11}}{{#tag:ref|Sir Samuel Brown's Stockton Railway Bridge in the United Kingdom was the first suspension bridge designed to carry railway traffic, but it could not support the weight of a locomotive. Hence, it was non-operational as a railway bridge. Built in 1829, the bridge was closed in 1830.{{Sfn|Skempton|Chrimes|2002|p=87}}|group=nb}}


==Engineering==
== Engineering ==
Roebling's bridge was supported by two limestone towers on each side of the gorge. These [[Ancient Egyptian architecture|Egyptian-style]] towers<ref name=irwin39>Irwin (1996), 39.</ref> stood {{convert|88|ft|m}} tall on the American shore and {{convert|78|ft|m}} tall on the Canadian shore.<ref>Disturnell (1864), 124.</ref> With their foundations {{convert|28|ft|m}} in the earth, the limestone structures could support up to 12&nbsp;million&nbsp;pounds (5.4&nbsp;million&nbsp;kg).<ref name=bian71>Bianculli (2003), 71.</ref> Four {{convert|10.5|in|cm|adj=on}} thick main cables held up the bridge; two cables ran through iron saddles at the top of each tower. Each cable comprised 3,059 wires that were spun with Roebling's patented technique used in his Allegheny Suspension Aqueduct. The ends of each cable were secured to {{convert|6|sqft|m2|adj=on}} cast-iron plates sunk {{convert|20|-|30|ft|m}} deep in the bedrock.<ref name=edu>Ryerson (1854), 146.</ref> Support lines hung down from iron clamps that encircled the main cables, and held up the decks. Deep trusses—never before seen on a large suspension bridge{{Ref label|truss|k|none}}—lined the sides of the bridge, and joined the two decks so that the structure looked like a cage.<ref name=irwin40>Irwin (1996), 40.</ref> The trussed sides and the upper and lower decks, which spanned {{convert|825|ft|m}},{{Ref label|span|l|none}} formed a "hollow straight beam", reinforcing the rigidity of the bridge.<ref name=bian69 />
Roebling's bridge was supported by two limestone towers on each side of the gorge. These [[Ancient Egyptian architecture|Egyptian-style]] towers{{Sfn|Irwin|1996|p=39}} stood {{convert|88|ft|m}} tall on the American shore and {{convert|78|ft|m}} tall on the Canadian shore.{{Sfn|Disturnell|1864|p=124}} With their foundations {{convert|28|ft|m}} in the earth, the limestone structures could support up to 12&nbsp;million&nbsp;pounds (5.4&nbsp;million&nbsp;kg).{{Sfn|Bianculli|2003|p=71}} Four {{convert|10.5|in|cm|adj=on}} thick main cables held up the bridge; two cables ran through iron saddles at the top of each tower. Each cable comprised 3,059 wires that were spun with Roebling's patented technique used in his Allegheny Suspension Aqueduct. The ends of each cable were secured to {{convert|6|sqft|m2|adj=on}} cast-iron plates sunk {{convert|20|-|30|ft|m}} deep in the bedrock.{{Sfn|Ryerson|Hodgins|1854|p=146}} Support lines hung down from iron clamps that encircled the main cables, and held up the decks. Deep trusses&mdash;never before seen on a large suspension bridge{{#tag:ref|A similar design, proposed by engineer [[John Trautwine]], was exhibited 18 months before the construction of the Suspension Bridge. It was not used in any suspension bridges.{{Sfn|Tyrrell|1911|p=225}}|group=nb}}&mdash;lined the sides of the bridge, and joined the two decks so that the structure looked like a cage.<{{Sfn|Irwin|1996|p=40}} The trussed sides and the upper and lower decks, which spanned {{convert|825|ft|m}},{{#tag:ref|The bridge's span has been given lengths that ranged from 800 to 825&nbsp;ft by various sources. This article takes the length stated by McCullough.{{Sfn|McCullough|2001|p=69}}|group=nb}} formed a "hollow straight beam", reinforcing the rigidity of the bridge.{{Sfn|Bianculli|2003|p=69}}


The Suspension Bridge was further stiffened by [[guy-wire]]s which ran from its upper deck to the top of its towers. Criticism of suspension bridges was growing after the Wheeling Suspension Bridge collapsed under strong winds in 1854. To address these concerns, Roebling added more guy-wires to secure the lower deck to the shores below.<ref name=irwin39 /> Roebling's efforts ensured that his Suspension Bridge remained standing while other suspension bridges across the Niagara River collapsed because of strong winds.{{Ref label|E|m|none}} Although he was not the first engineer to appreciate the need for a suspension bridge to be sufficiently rigid or to implement the methods to do so, Roebling was the first to understand the principles behind the methods and combine them in the building of a suspension bridge.<ref name=bian71 /> Roebling proved that despite popular opinion, properly built suspension bridges can safely support the passage of heavy railway traffic. The engineer's combination of stiffening methods created the first modern suspension bridge.<ref>McCullough (2001), "The Genuine Language of America" ,72.</ref> Such was the rigidity of the Suspension Bridge that it withstood the shockwave caused by the nearby fall of a {{convert|5000|ST|t|adj=on}} mass of rock in 1863; the force of the impact manifested itself as a wave, rippling through the decks of the bridge from the American side to the Canadian side and back.<ref>Holley (1883), 141–142.</ref>
The Suspension Bridge was further stiffened by [[guy-wire]]s which ran from its upper deck to the top of its towers. Criticism of suspension bridges was growing after the Wheeling Suspension Bridge collapsed under strong winds in 1854. To address these concerns, Roebling added more guy-wires to secure the lower deck to the shores below.{{Sfn|Irwin|1996|p=39}} Roebling's efforts ensured that his Suspension Bridge remained standing while other suspension bridges across the Niagara River collapsed because of strong winds.{{#tag:ref|Serrell's Lewiston Suspension Bridge collapsed in 1864, and Keefer's Falls View Suspension Bridge in 1889.{{Sfn|Scott|2001|p=10}}|group=nb}} Although he was not the first engineer to appreciate the need for a suspension bridge to be sufficiently rigid or to implement the methods to do so, Roebling was the first to understand the principles behind the methods and combine them in the building of a suspension bridge.{{Sfn|Bianculli|2003|p=71}} Roebling proved that despite popular opinion, properly built suspension bridges can safely support the passage of heavy railway traffic. The engineer's combination of stiffening methods created the first modern suspension bridge.{{Sfn|McCullough|2001|p=72}} Such was the rigidity of the Suspension Bridge that it withstood the shockwave caused by the nearby fall of a {{convert|5000|ST|t|adj=on}} mass of rock in 1863; the force of the impact manifested itself as a wave, rippling through the decks of the bridge from the American side to the Canadian side and back.{{Sfn|Holley|1883|pp=141&ndash;142}}


[[File:Locomotive Crossing the Suspension Bridge.jpg|thumb|upright|alt=Three railway lines merge into one, crossing a bridge. A train engine has crossed the bridge and is moving into the left-most line.|The Suspension Bridge used combinations of four rails to serve three different railroads.]]
[[File:Locomotive Crossing the Suspension Bridge.jpg|thumb|upright|alt=Three railway lines merge into one, crossing a bridge. A train engine has crossed the bridge and is moving into the left-most line.|The Suspension Bridge used combinations of four rails to serve three different railroads.]]
From the United States, the [[Erie Railroad|New York and Erie Rail Road]]'s Canandaigua and Niagara Falls Railroad and [[New York Central Railroad]]'s [[Buffalo and Niagara Falls Railroad]] crossed over the bridge and reached into Ontario. Similarly, the Great Western Railway in Canada extended its network from Canada into New York. At the time of the bridge's opening, the three railroads were of different [[gauge (railroad)|gauge]]s: {{RailGauge|ussg|al=on|lk=on}} on the New York Central, {{RailGauge|66}} on the Great Western, and {{RailGauge|72}} on the Erie.<ref>Baer (2005), 4.</ref> Instead of accommodating three railways side-by-side on a single wide deck, the bridge saved space by [[Dual gauge#Triple gauge|overlapping the tracks]] over each other. This method used only four rails; one pair formed the track for one railway, and the other pair formed another. One rail from each pair would then form the final track.<ref name=edu /> In the first year of the bridge's operation, an average of 30 trains trundled across it each day.<ref>Roebling (1855), 3.</ref> Five years later, 45 trains passed over the structure daily.<ref>Scott (2001), "Maturity in America—Ellet and Roebling", 9.</ref>
From the United States, the [[Erie Railroad|New York and Erie Rail Road]]'s Canandaigua and Niagara Falls Railroad and [[New York Central Railroad]]'s [[Buffalo and Niagara Falls Railroad]] crossed over the bridge and reached into Ontario. Similarly, the Great Western Railway in Canada extended its network from Canada into New York. At the time of the bridge's opening, the three railroads were of different [[gauge (railroad)|gauge]]s: {{RailGauge|ussg|al=on|lk=on}} on the New York Central, {{RailGauge|66}} on the Great Western, and {{RailGauge|72}} on the Erie.{{Sfn|Baer|2005|p=4}} Instead of accommodating three railways side-by-side on a single wide deck, the bridge saved space by [[Dual gauge#Triple gauge|overlapping the tracks]] over each other. This method used only four rails; one pair formed the track for one railway, and the other pair formed another. One rail from each pair would then form the final track.{{Sfn|Ryerson|Hodgins|1854|p=146}} In the first year of the bridge's operation, an average of 30 trains trundled across it each day.{{Sfn|Roebling|1855|p=3}} Five years later, 45 trains passed over the structure daily.{{Sfn|Scott|2001|p=9}}


Roebling mandated that the trains be limited to a maximum speed of {{convert|5|mph|km/h}} to ensure absolute safety. He was confident the bridge could handle faster train traffic, but he preferred a safe operation.<ref>Roebling (1860), 5.</ref> In his tests the bridge supported a {{convert|326|ST|t|adj=on}} train, bending {{convert|10.5|in|cm}} under the weight.<ref>Roebling (1855), 11.</ref> This was within the maximum load of {{convert|450|ST|t}} specified in the design of the bridge.{{Ref label|max|n|none}} The figure was a conservative estimate.<ref name=irwin39 /> The cables and guy-wires could support {{convert|7300|ST|t}},<ref name=edu /> and travel journalist Alfred J. Pairpoint commented that it was normal to see {{convert|1200|ST|t|adj=on}} trains pass over the bridge without danger.<ref>Pairpoint (1857), 112.</ref> The bridge shook whenever a train trundled over it, although this had no effect on its integrity. When the frequency of passing trains was high, the trembling was noticeable to travelers on the lower deck and proved uncomfortable to some; writer [[Mark Twain]] noted, "You drive over to Suspension Bridge and divide your misery between the chances of smashing down two hundred feet into the river below, and the chances of having a railway-train overhead smashing down onto you. Either possibility is discomforting taken by itself, but, mixed together, they amount in the aggregate to positive unhappiness."<ref name=Mc69 /> Despite such commentaries, thousands of people crossed over the bridge safely every day.<ref name=edu />
Roebling mandated that the trains be limited to a maximum speed of {{convert|5|mph|km/h}} to ensure absolute safety. He was confident the bridge could handle faster train traffic, but he preferred a safe operation.{{Sfn|Roebling|1860|p=5}} In his tests the bridge supported a {{convert|326|ST|t|adj=on}} train, bending {{convert|10.5|in|cm}} under the weight.{{Sfn|Roebling|1855|p=11}} This was within the maximum load of {{convert|450|ST|t}} specified in the design of the bridge.{{#tag:ref|The difference between "Weight of superstructure" and "Weight of superstructure and maximum loads".{{Sfn|Ryerson|Hodgins|1854|p=146}}|group=nb}} The figure was a conservative estimate.{{Sfn|Irwin|1996|p=39}} The cables and guy-wires could support {{convert|7300|ST|t}},{{Sfn|Ryerson|Hodgins|1854|p=146}} and travel journalist Alfred J. Pairpoint commented that it was normal to see {{convert|1200|ST|t|adj=on}} trains pass over the bridge without danger.{{Sfn|Pairpoint|1857|p=112}} The bridge shook whenever a train trundled over it, although this had no effect on its integrity. When the frequency of passing trains was high, the trembling was noticeable to travelers on the lower deck and proved uncomfortable to some; writer [[Mark Twain]] noted, "You drive over to Suspension Bridge and divide your misery between the chances of smashing down two hundred feet into the river below, and the chances of having a railway-train overhead smashing down onto you. Either possibility is discomforting taken by itself, but, mixed together, they amount in the aggregate to positive unhappiness."{{Sfn|McCullough|2001|p=69}} Despite such commentaries, thousands of people crossed over the bridge safely every day.{{Sfn|Ryerson|Hodgins|1854|p=146}}


[[File:Suspension Bridge at Niagara from Toll Gate (right American Views).jpg|thumb|upright|left|alt=A square opening forms the entrance to the bridge's lower level. Vertical wooden supports line the level. Flagstones pave the entrance and a booth stands to the left. A man stands at the booth, another sits in front of the entrance, and another is walking up the stairs on the right.|View of the bridge's lower deck entrance, with a toll booth at left; deep trusses that helped reinforce the bridge's rigidity are visible.]]
[[File:Suspension Bridge at Niagara from Toll Gate (right American Views).jpg|thumb|upright|left|alt=A square opening forms the entrance to the bridge's lower level. Vertical wooden supports line the level. Flagstones pave the entrance and a booth stands to the left. A man stands at the booth, another sits in front of the entrance, and another is walking up the stairs on the right.|View of the bridge's lower deck entrance, with a toll booth at left; deep trusses that helped reinforce the bridge's rigidity are visible.]]
American engineers regard the Suspension Bridge as a major achievement of efficiency. In a fledgling country where resources—material and financial—were limited, they had to make do with whatever was available. This goal was espoused by the [[American Society of Civil Engineers]], which opined, "That is the best engineering, not which makes the most splendid, or even the most perfect work, but that which makes a work that answers the purpose well, at the least cost." Roebling had built a bridge that rivaled grander bridges of leading European nations at a much lower cost.<ref name=irwin49>Irwin (1996), 49.</ref> His Suspension Bridge used only one-sixth the material of Stephenson's Brittania Bridge, but was twice as long and had a capacity that exceeded the tubular bridge.<ref>McCullough (2001), "The Genuine Language of America", 79–80.</ref> Moreover, the expenditure on Roebling's Suspension Bridge was $400,000, whereas a tubular bridge of equivalent length and load-bearing capability would have cost $4&nbsp;million.<ref name=irwin49 /> Roebling's success established him as the master of suspension bridges. The inclined guy-wires that stretched from the top of towers to the roadway of the Suspension Bridge became the signature of his future works.<ref>Trachtenberg (1979), 55–56.</ref>
American engineers regard the Suspension Bridge as a major achievement of efficiency. In a fledgling country where resources—material and financial—were limited, they had to make do with whatever was available. This goal was espoused by the [[American Society of Civil Engineers]], which opined, "That is the best engineering, not which makes the most splendid, or even the most perfect work, but that which makes a work that answers the purpose well, at the least cost." Roebling had built a bridge that rivaled grander bridges of leading European nations at a much lower cost.{{Sfn|Irwin|1996|p=49}} His Suspension Bridge used only one-sixth the material of Stephenson's Brittania Bridge, but was twice as long and had a capacity that exceeded the tubular bridge.{{Sfn|McCullough|2001|pp=79&ndash;80}} Moreover, the expenditure on Roebling's Suspension Bridge was $400,000, whereas a tubular bridge of equivalent length and load-bearing capability would have cost $4&nbsp;million.{{Sfn|Irwin|1996|p=49}} Roebling's success established him as the master of suspension bridges. The inclined guy-wires that stretched from the top of towers to the roadway of the Suspension Bridge became the signature of his future works.{{Sfn|Trachtenberg|1979|pp=55&ndash;56}}


Although the Suspension Bridge proved that the suspension system could be safely used to carry railroads, no more suspension railway bridges were built. The outbreak of the American Civil War diverted attention from such civil engineering ventures,<ref>Nye (1996), "Bridges and Skyscrapers: The Geometrical Sublime", 79.</ref> and by the time attention was paid to building bridges again, [[cantilever bridge]]s were in vogue for railway bridges.<ref name=grigg82>Griggs (November 2006), 82.</ref> Regardless, the Suspension Bridge's success made it a model for suspension railway bridges. When the city of Quebec called for a structure to span the [[St. Lawrence River]] in 1850, it looked to the Suspension Bridge for inspiration.<ref>Middleton (2001), 8–9.</ref> Seventeen years later, the British journal ''Engineering'' called for a suspension railway to bridge the [[Straits of Messina]] and also referred to Roebling's bridge.<ref>Scott (2001), "The Allure of the Messina Strait", 322.</ref> Lastly, Stuart opened his 1871 work on the history of American engineering, ''Lives and Works of Civil and Military Engineering in America'', with an illustration of the bridge.<ref name=irwin49 />
Although the Suspension Bridge proved that the suspension system could be safely used to carry railroads, no more suspension railway bridges were built. The outbreak of the American Civil War diverted attention from such civil engineering ventures,{{Sfn|Nye|1996|p=79}} and by the time attention was paid to building bridges again, [[cantilever bridge]]s were in vogue for railway bridges.{{Sfn|Griggs|2006b|p=82}} Regardless, the Suspension Bridge's success made it a model for suspension railway bridges. When the city of Quebec called for a structure to span the [[St. Lawrence River]] in 1850, it looked to the Suspension Bridge for inspiration.{{Sfn|Middleton|2001|pp=8&ndash;9}} Seventeen years later, the British journal ''Engineering'' called for a suspension railway to bridge the [[Straits of Messina]] and also referred to Roebling's bridge.{{Sfn|Scott|2001|p=322}} Lastly, Stuart opened his 1871 work on the history of American engineering, ''Lives and Works of Civil and Military Engineering in America'', with an illustration of the bridge.{{Sfn|Irwin|1996|p=49}}


==Legacy==
== Legacy ==
As a border crossing between two large growing countries, the Suspension Bridge had throngs of travelers passing over it. Furthermore, it was the intersection of three major railroads. Coupled with its vicinity to a natural wonder, the Niagara Falls, the bridge brought a lot of railroad traffic into the region once it was opened. The towns at the ends of the bridge benefited greatly from this heavy movement of people and goods. The village of Suspension Bridge, United States, grew quickly within a few years after the opening of the bridge, acquiring shops, factories, and a hotel. Its tourism and commerce soon rivaled the town of [[Niagara Falls, New York]];<ref>Irwin (1996), 50.</ref> eventually, the village was merged into the town in 1892. Similarly, Clifton on the Canadian end of the bridge was integrated into the town of [[Niagara Falls, Ontario]].<ref>Dubinsky (1999), 109.</ref> The two Niagara Falls cities boasted commerce that surpassed neighboring settlements. Around the time of its official opening, the bridge was one of the busiest points of trade on the United States–Canadian border, carrying $12&nbsp;million of transitory goods and $2&nbsp;million of bonded materials into Canada.<ref name=edu /> To handle the large amount of goods exchanged over the border, the Lewiston customs house—the primary customs for the Niagara region—was relocated to the Niagara Suspension Bridge in 1863.<ref>Brightly (1869), 468.</ref>{{Ref label|house|o|none}}
As a border crossing between two large growing countries, the Suspension Bridge had throngs of travelers passing over it. Furthermore, it was the intersection of three major railroads. Coupled with its vicinity to a natural wonder, the Niagara Falls, the bridge brought a lot of railroad traffic into the region once it was opened. The towns at the ends of the bridge benefited greatly from this heavy movement of people and goods. The village of Suspension Bridge, United States, grew quickly within a few years after the opening of the bridge, acquiring shops, factories, and a hotel. Its tourism and commerce soon rivaled the town of [[Niagara Falls, New York]];{{Sfn|Irwin|1996|p=50}} eventually, the village was merged into the town in 1892. Similarly, Clifton on the Canadian end of the bridge was integrated into the town of [[Niagara Falls, Ontario]].{{Sfn|Dubinsky|1999|p=109}} The two Niagara Falls cities boasted commerce that surpassed neighboring settlements. Around the time of its official opening, the bridge was one of the busiest points of trade on the United States–Canadian border, carrying $12&nbsp;million of transitory goods and $2&nbsp;million of bonded materials into Canada.{{Sfn|Ryerson|Hodgins|1854|p=146}} To handle the large amount of goods exchanged over the border, the Lewiston customs house—the primary customs for the Niagara region—was relocated to the Niagara Suspension Bridge in 1863.{{Sfn|Brightly|1869|p=468}}{{#tag:ref|The [[U.S. Customhouse (Niagara Falls, New York)|Niagara customs house]] was added to the list of [[National Register of Historic Places]] in 1973;{{Sfn|National Park Service|2004}} thirty-five years later, renovation was started to transform the building into a railway station and history museum for the region.{{Sfn|Gee|2008}}|group=nb}}


[[File:Niagara rail 2.jpg|thumb|alt=A train crosses the top of the double-deck bridge. In the background is a waterfall.|Advertisement for [[Great Western Railway (Ontario)|Great Western Railway]] travel via the Niagara Falls Suspension Bridge, c. 1876]]
[[File:Niagara rail 2.jpg|thumb|alt=A train crosses the top of the double-deck bridge. In the background is a waterfall.|Advertisement for [[Great Western Railway (Ontario)|Great Western Railway]] travel via the Niagara Falls Suspension Bridge, c. 1876]]
The bridge's depiction as an engineering marvel and beautiful sight lured many visitors to the Falls. Travelers could, while crossing the bridge, enjoy a view of the Falls enhanced by the sensation of standing {{convert|250|ft|m}} in the air. The Falls, however, proved distant and indistinct to some when there was overcast weather. On the whole, the Suspension Bridge was considered as an attraction that must be seen by visitors to Niagara Falls.<ref>Irwin (1996), 36, 42–43.</ref> In paintings and prints of the bridge, the Suspension Bridge became the focus, pushing the Falls into the background. Unlike paintings of the Falls that capture the viewer's eye with their majestic views of the natural wonder, pictures of the bridge impressed viewers with the utilitarian design of the structure.<ref>Irwin (1996), 46.</ref> By 1897, the inbound trains to Niagara Falls brought 276,900 visitors during the months of May to August.<ref name=irwin55>Irwin (1996), 55.</ref> A [[Tram|streetcar system]] was established in 1882 to handle the increasing cross-border pedestrian traffic. Initially pulled by horses, the trolleys were converted to run on electricity in 1892.<ref>Dumych (1996), 97.</ref> The Suspension Bridge was the pride and symbol of the Great Western Railway,<ref>Irwin (1996), 60.</ref> which touted it as the "only Route via Niagara Falls & Suspension Bridge".{{Ref label|Ad|p|none}}
The bridge's depiction as an engineering marvel and beautiful sight lured many visitors to the Falls. Travelers could, while crossing the bridge, enjoy a view of the Falls enhanced by the sensation of standing {{convert|250|ft|m}} in the air. The Falls, however, proved distant and indistinct to some when there was overcast weather. On the whole, the Suspension Bridge was considered as an attraction that must be seen by visitors to Niagara Falls.<{{Sfn|Irwin|1996|pp=36, 42&ndash;43}} In paintings and prints of the bridge, the Suspension Bridge became the focus, pushing the Falls into the background. Unlike paintings of the Falls that capture the viewer's eye with their majestic views of the natural wonder, pictures of the bridge impressed viewers with the utilitarian design of the structure.{{Sfn|Irwin|1996|p=46}} By 1897, the inbound trains to Niagara Falls brought 276,900 visitors during the months of May to August.{{Sfn|Irwin|1996|p=55}} A [[Tram|streetcar system]] was established in 1882 to handle the increasing cross-border pedestrian traffic. Initially pulled by horses, the trolleys were converted to run on electricity in 1892.{{Sfn|Dumych|1996|p=97}} The Suspension Bridge was the pride and symbol of the Great Western Railway,{{Sfn|Irwin|1996|p=60}} which touted it as the "only Route via Niagara Falls & Suspension Bridge".{{#tag:ref|As pictured in the [[:File:Niagara rail 2.jpg|advertisement for the Great Western Railway]] shown in this article.|group=nb}}


[[File:Signorina Maria Spelterina in her high rope performance (left view).jpg|thumb|upright|left|alt=A woman is crossing on a rope over a river. She wears a wide-brim hat and holds a pole to balance herself while her feet are in buckets. A double-deck bridge, filled with audience on the lower deck, is in the background.|Daredevils such as [[Maria Spelterini]], the only woman to cross the Niagara gorge on a tightrope, performed their stunts to crowds on the shore and the Suspension Bridge.]]
[[File:Signorina Maria Spelterina in her high rope performance (left view).jpg|thumb|upright|left|alt=A woman is crossing on a rope over a river. She wears a wide-brim hat and holds a pole to balance herself while her feet are in buckets. A double-deck bridge, filled with audience on the lower deck, is in the background.|Daredevils such as [[Maria Spelterini]], the only woman to cross the Niagara gorge on a tightrope, performed their stunts to crowds on the shore and the Suspension Bridge.]]
Travelers on the Suspension Bridge witnessed several death-defying stunts performed across the Niagara Gorge. On June 30, 1859, they saw [[Charles Blondin]]'s feat of becoming the first man to cross the chasm on a tightrope.<ref>Wilson (1990), 35.</ref> In mid-crossing Blondin sat down on the rope and lowered a line to retrieve a drink from the deck of the ''Maid of the Mist'' below.<ref>Wilson (1990), 39.</ref> In his later tightrope acts at the same spot, the acrobat would perform a different stunt on each occasion. One time he cooked and ate an omelette in mid-crossing; another time he carried his manager Harry Colcord on his back. While giving Colcord a piggyback ride, Blondin stopped five times on the tightrope to rest and recover his strength; each time Colcord gingerly got off Blondin's back and stood on the tightrope, climbing back on after the acrobat had enough rest.<ref>Strand (2008), 105–107.</ref> Blondin's success inspired other acrobats, such as [[William Leonard Hunt]] ("The Great Farini"), Samuel Dixon, Clifford Calverly, and Signorina [[Maria Spelterini]], to emulate and try to surpass his acts at the same spot. The Signorina, the only woman to walk across the Niagara on a tightrope, once crossed while blindfolded and another time with her hands and legs in manacles.<ref>Dumych (1996), 91–93.</ref>
Travelers on the Suspension Bridge witnessed several death-defying stunts performed across the Niagara Gorge. On June 30, 1859, they saw [[Charles Blondin]]'s feat of becoming the first man to cross the chasm on a tightrope.{{Sfn|Wilson|1990|p=35}} In mid-crossing Blondin sat down on the rope and lowered a line to retrieve a drink from the deck of the ''Maid of the Mist'' below.{{Sfn|Wilson|1990|p=39}} In his later tightrope acts at the same spot, the acrobat would perform a different stunt on each occasion. One time he cooked and ate an omelette in mid-crossing; another time he carried his manager Harry Colcord on his back. While giving Colcord a piggyback ride, Blondin stopped five times on the tightrope to rest and recover his strength; each time Colcord gingerly got off Blondin's back and stood on the tightrope, climbing back on after the acrobat had enough rest.{{Sfn|Strand|2008|pp=105&ndash;107}} Blondin's success inspired other acrobats, such as [[William Leonard Hunt]] ("The Great Farini"), Samuel Dixon, Clifford Calverly, and Signorina [[Maria Spelterini]], to emulate and try to surpass his acts at the same spot. The Signorina, the only woman to walk across the Niagara on a tightrope, once crossed while blindfolded and another time with her hands and legs in manacles.{{Sfn|Dumych|1996|pp=91&ndash;93}}


Another group of people in America had their own risky crossings over the Niagara Gorge as they fled over the border into Canada. They were enslaved African-Americans who sought freedom by escaping to a country that declared the liberation of any slave who entered it.<ref>Switala (2006), "Operation of the Railroad", 20.</ref> The bridge was part of the [[Underground Railroad]], a network of routes designed to smuggle slaves in the United States to freedom in Canada. Before the American Civil War, fleeing slaves had only four main routes into Canada, of which one was crossing the Niagara River.<ref>Strand (2008), 112.</ref> Slaves who escaped along the Niagara route had help from several quarters. The state of New York generally favored granting freedom to slaves; this attitude emboldened African-American workers in Niagara, who frequently helped slaves flee to Canada. Before the Suspension Bridge was completed, fugitives either crossed the raging river on a boat or risked their lives by swimming at calmer points of the river. The Suspension Bridge made escape across the river easier and safer, although there was still risk. To avoid getting caught and sent back to their owners, slaves had to sneak across on foot or hide aboard trains and oxcarts.<ref>Strand (2008), 114–115, 128.</ref> Antislavery activist [[Harriet Tubman]] guided fugitives at night and bribed custom officials to turn a blind eye.<ref>Strand (2008), 114.</ref> As a result, many slaves crossed the Suspension Bridge to freedom before the United States was engulfed in civil war.<ref>Switala (2006), "New York—The Western Routes", 130–131.</ref>
Another group of people in America had their own risky crossings over the Niagara Gorge as they fled over the border into Canada. They were enslaved African-Americans who sought freedom by escaping to a country that declared the liberation of any slave who entered it.{{Sfn|Switala|2006|p=20}} The bridge was part of the [[Underground Railroad]], a network of routes designed to smuggle slaves in the United States to freedom in Canada. Before the American Civil War, fleeing slaves had only four main routes into Canada, of which one was crossing the Niagara River.{{Sfn|Strand|2008|p=112}} Slaves who escaped along the Niagara route had help from several quarters. The state of New York generally favored granting freedom to slaves; this attitude emboldened African-American workers in Niagara, who frequently helped slaves flee to Canada. Before the Suspension Bridge was completed, fugitives either crossed the raging river on a boat or risked their lives by swimming at calmer points of the river. The Suspension Bridge made escape across the river easier and safer, although there was still risk. To avoid getting caught and sent back to their owners, slaves had to sneak across on foot or hide aboard trains and oxcarts.{{Sfn|Strand|2008|pp=114&ndash;115, 128}} Antislavery activist [[Harriet Tubman]] guided fugitives at night and bribed custom officials to turn a blind eye.{{Sfn|Strand|2008|p=114}} As a result, many slaves crossed the Suspension Bridge to freedom before the United States was engulfed in civil war.{{Sfn|Switala|2006|pp=130&ndash;131}}


When the war ended and the United States turned its focus toward rebuilding, Roebling started building his [[Brooklyn Bridge]]. As the monumental task could affect naval navigation, it required state approval, and the government wanted a thorough review of the engineer's credentials; hence, a Bridge Party was organized. Comprising Roebling and his son, as well as their fellow bridge engineers, generals, businessmen, and high society figures, the party toured the country to review four bridges Roebling had built before the civil war.<ref>McCullough (2001), "Man of Iron", 34–36.</ref> The final item on their itinerary was Roebling's Niagara Suspension Bridge. At the dinner to commemorate the end of the bridge tour, civil war veteran General [[Henry Warner Slocum]] gave a toast and called the Suspension Bridge a symbol of inspiration for the United States in its rebuilding efforts. This sentiment was shared by the guests and was expressed at later dinners across the United States.<ref>McCullough (2001), "The Genuine Language of America", 80–81.</ref> The achievement of building a large suspension bridge over a gorge in the face of overwhelming adversity—constant put-downs by the professional community, American and European&mdash;gave the United States a sense of pride. Nationalism rose as the country lauded the bridge. The completion of the bridge that had been deemed impossible by the Western world gave Americans, who had lesser technical accomplishments than Europe at that time, a trophy that stood above any other.<ref>Irwin (1996), 31.</ref> The Suspension Bridge became the American symbol to brave the toughest of challenges and do the impossible, pushing their drive for industrialization even harder. [[Charles W. Woodman]] specifically drew attention to the Suspension Bridge in his 1865 address to the United States Senate for approval to build a [[Patent slip|rail system to transport a ship]] out of the water and up around the Niagara Falls.<ref name=irwin49 />
When the war ended and the United States turned its focus toward rebuilding, Roebling started building his [[Brooklyn Bridge]]. As the monumental task could affect naval navigation, it required state approval, and the government wanted a thorough review of the engineer's credentials; hence, a Bridge Party was organized. Comprising Roebling and his son, as well as their fellow bridge engineers, generals, businessmen, and high society figures, the party toured the country to review four bridges Roebling had built before the civil war.{{Sfn|McCullough|2001|pp=34&ndash;36}} The final item on their itinerary was Roebling's Niagara Suspension Bridge. At the dinner to commemorate the end of the bridge tour, civil war veteran General [[Henry Warner Slocum]] gave a toast and called the Suspension Bridge a symbol of inspiration for the United States in its rebuilding efforts. This sentiment was shared by the guests and was expressed at later dinners across the United States.{{Sfn|McCullough|2001|pp=80&ndash;81}} The achievement of building a large suspension bridge over a gorge in the face of overwhelming adversity&mdash;constant put-downs by the professional community, American and European&mdash;gave the United States a sense of pride. Nationalism rose as the country lauded the bridge. The completion of the bridge that had been deemed impossible by the Western world gave Americans, who had lesser technical accomplishments than Europe at that time, a trophy that stood above any other.{{Sfn|Irwin|1996|p=31}} The Suspension Bridge became the American symbol to brave the toughest of challenges and do the impossible, pushing their drive for industrialization even harder. [[Charles W. Woodman]] specifically drew attention to the Suspension Bridge in his 1865 address to the United States Senate for approval to build a [[Patent slip|rail system to transport a ship]] out of the water and up around the Niagara Falls.{{Sfn|Irwin|1996|p=49}}


==Maintenance and replacement==
== Maintenance and replacement ==
[[File:Renovated Suspension Bridge.jpg|thumb|alt=Towers, made of steel beams, hold up the cables that suspend a bridge.|The Suspension Bridge in 1886, after its wooden components had been replaced with steel]]
[[File:Renovated Suspension Bridge.jpg|thumb|alt=Towers, made of steel beams, hold up the cables that suspend a bridge.|The Suspension Bridge in 1886, after its wooden components had been replaced with steel]]
Budget concerns forced Roebling to build the Suspension Bridge primarily with wood;<ref name=irwin40 /> the cost of casting the components out of iron and transporting them "[way] out West" was exorbitant.<ref name=crab /> The organic material decayed and rotted because of the moisture present around Niagara Falls. As the industrialization of the United States moved forward rapidly, the introduction of the [[Bessemer process]] greatly lowered the cost of the more durable steel and iron.<ref>Irwin (1996), 53.</ref> By 1880, the Suspension Bridge's wooden trusses, beams, and flooring were replaced with steel.<ref>Tyrrell (1911), 226.</ref> The wire cables were not replaced; their cores were still in pristine condition. The outer layer of wires in the cables was, however, lightly corroded and had to be replaced.<ref>Buck (1880), 11&ndash;14.</ref> Due to severe deterioration, the limestone towers were replaced in 1886 with steel framed versions.<ref name=bian70 /> These renovations increased the bridge's strength and helped it handle heavier loads for a few more years.<ref name=tro567 />
Budget concerns forced Roebling to build the Suspension Bridge primarily with wood;{{Sfn|Irwin|1996|p=40}} the cost of casting the components out of iron and transporting them "[way] out West" was exorbitant.{{Sfn|Crabtree|1901|p=360}} The organic material decayed and rotted because of the moisture present around Niagara Falls. As the industrialization of the United States moved forward rapidly, the introduction of the [[Bessemer process]] greatly lowered the cost of the more durable steel and iron.{{Sfn|Irwin|1996|p=53}} By 1880, the Suspension Bridge's wooden trusses, beams, and flooring were replaced with steel.{{Sfn|Tyrrell|1911|p=226}} The wire cables were not replaced; their cores were still in pristine condition. The outer layer of wires in the cables was, however, lightly corroded and had to be replaced.{{Sfn|Buck|1880|pp=11&ndash;14}} Due to severe deterioration, the limestone towers were replaced in 1886 with steel framed versions.{{Sfn|Bianculli|2003|p=70}} These renovations increased the bridge's strength and helped it handle heavier loads for a few more years.{{Sfn|Troyano|2003|p=567}}


The weight of trains in North America had greatly increased by the mid-1890s. Larger and more powerful locomotives were required to pull cars that handled an increasing number of passengers and goods; compared to the {{convert|23|ST|t|adj=on}} locomotives crossing the bridge in the 1850s, {{convert|170|ST|t|adj=on}} locomotives were the common engines 40&nbsp;years later.<ref name=irwin55 /> The weight of these trains exceeded the specifications of the Suspension Bridge, and the bridge companies took the opportunity to review and request the replacement of the bridge. Civil engineer [[Leffert L. Buck]], who had been hired to maintain the Suspension Bridge, was selected to design the replacement bridge. He settled for a bridge of the [[arch bridge|arch design]]. At that time, arch bridges were the new models for railway bridges and were more cost-efficient than suspension bridges. Buck built the new bridge around and below the Suspension Bridge, replacing it a piece at a time. His plan allowed bridge traffic&mdash;train and pedestrian&mdash;to continue without disruption.<ref name=grigg82 /> By August 27, 1897, the last pieces of the Suspension Bridge were dismantled, leaving the Lower Steel Arch Bridge&mdash;later renamed the [[Whirlpool Rapids Bridge]]&mdash;in its stead.<ref name=crab /> On inspection, the cores of the cables that formerly held up the Suspension Bridge were found to be as sound as on the day the bridge was built.<ref name=bian71 />
The weight of trains in North America had greatly increased by the mid-1890s. Larger and more powerful locomotives were required to pull cars that handled an increasing number of passengers and goods; compared to the {{convert|23|ST|t|adj=on}} locomotives crossing the bridge in the 1850s, {{convert|170|ST|t|adj=on}} locomotives were the common engines 40&nbsp;years later.{{Sfn|Irwin|1996|p=55}} The weight of these trains exceeded the specifications of the Suspension Bridge, and the bridge companies took the opportunity to review and request the replacement of the bridge. Civil engineer [[Leffert L. Buck]], who had been hired to maintain the Suspension Bridge, was selected to design the replacement bridge. He settled for a bridge of the [[arch bridge|arch design]]. At that time, arch bridges were the new models for railway bridges and were more cost-efficient than suspension bridges. Buck built the new bridge around and below the Suspension Bridge, replacing it a piece at a time. His plan allowed bridge traffic&mdash;train and pedestrian&mdash;to continue without disruption.{{Sfn|Griggs|2006b|p=82}} By August 27, 1897, the last pieces of the Suspension Bridge were dismantled, leaving the Lower Steel Arch Bridge&mdash;later renamed the [[Whirlpool Rapids Bridge]]&mdash;in its stead.{{Sfn|Crabtree|1901|p=360}} On inspection, the cores of the cables that formerly held up the Suspension Bridge were found to be as sound as on the day the bridge was built.{{Sfn|Bianculli|2003|p=71}}


== Notes and references ==
==Footnotes==
<div class="references-small">
{{Col-begin}}
{{Col-2}}
:'''a.''' {{Note label|start|a|none}}Merritt was not alone in dreaming of a suspension bridge across the Niagara. Engineers Francis Hall, Charles Ellet, Jr., and Charles B. Stuart had individually spoke about such an idea in the years before the Suspension Bridge was started.<ref>Irwin (1996), 32&ndash;33; Bianculli (2003), 68&ndash;69.</ref>
:'''b.''' {{Note label|fall|b|none}}The Horseshoe Falls have receded 3&ndash;6&nbsp;feet (0.9&ndash;1.8&nbsp;metres) per year before the 1950s and are receding at a rate of 1&ndash;2&nbsp;feet (0.3&ndash;0.6&nbsp;metres) per year thereafter. Due to this erosion, it may no longer be visible from the location stated in the article.<ref>Tesmer (1981), "Fig. 4-2", 90, "Niagara Statistics", 199.</ref>
:'''c.''' {{Note label|brou|c|none}}According to the Skempton source, the Broughton Suspension Bridge's designer could instead be Thomas Cheek Hewes, a manufacturer who also built bridges.<ref>Skempton (2002), 321.</ref>
:'''d.''' {{Note label|Stu|c|none}}Stuart and Merritt, at this time, were leading the joint ventures that formed the bridge companies.<ref name=Irwin />
:'''e.''' {{Note label|money|d|none}}All monetary units in this article are of the United States dollar. According to the [[Bank of Canada]], the US$ is used in Canada up to the 1850s and '60s; moreover, the Canadian dollar&mdash;during its inception in the 1860s and '70s&mdash;was equal in value to the US$.<ref>Powell (1999).</ref>
:'''f.''' {{Note label|A|e|none}}The prize money was stated to be $5 or $10 among various sources. This article follows the McCullough source.<ref name=mc74 />
:'''g.''' {{Note label|B|f|none}}Similarly, Homan Walsh was either a 10-year-old or 15-year-old boy depending on the source. This article follows the Robinson source.<ref name=rob />
:'''h.''' {{Note label|toll|g|none}}Although Robinson stated the "toll" as $1.25, this article follows the $1.00 fee stated by Crabtree and Tyrell.<ref name=crab /><ref>Tyrrell (1911), 223.</ref>
{{Col-2}}
:'''i.''' {{Note label|C|h|none}}A railway bridge with a double-deck design was suggested by civil engineer [[Squire Whipple]] during the early planning stage of the project.<ref name=bian71 />
:'''j.''' {{Note label|D|i|none}}Sir Samuel Brown's Stockton Railway Bridge in the United Kingdom was the first suspension bridge designed to carry railway traffic, but it could not support the weight of a locomotive. Hence, it was non-operational as a railway bridge. Built in 1829, the bridge was closed in 1830.<ref>Skempton (2002), 87.</ref>
:'''k.''' {{Note label|truss|j|none}}A similar design, proposed by engineer [[John Trautwine]], was exhibited 18 months before the construction of the Suspension Bridge. It was not used in any suspension bridges.<ref>Tyrrell (1911), 225.</ref>
:'''l.''' {{Note label|span|k|none}}The bridge's span has been given lengths that ranged from 800 to 825&nbsp;ft by various sources. This article takes the length stated by McCullough.<ref name=Mc69 />
:'''m.''' {{Note label|E|l|none}}Serrell's Lewiston Suspension Bridge collapsed in 1864, and Keefer's Falls View Suspension Bridge in 1889.<ref>Scott (2001), "Maturity in America&mdash;Ellet and Roebling", 10.</ref>
:'''n.''' {{Note label|max|m|none}}The difference between "Weight of superstructure" and "Weight of superstructure and maximum loads".<ref name=edu />
:'''o.''' {{Note label|house|n|none}}The [[U.S. Customhouse (Niagara Falls, New York)|Niagara customs house]] was added to the list of [[National Register of Historic Places]] in 1973;<ref>National Park Service (2004).</ref> thirty-five years later, renovation was started to transform the building into a railway station and history museum for the region.<ref>Gee (2008).</ref>
:'''p.''' {{Note label|Ad|o|none}}As pictured in the [[:File:Niagara rail 2.jpg|advertisement for the Great Western Railway]] shown in this article.
{{Col-end}}
</div>


==References==
=== Notes ===
{{Reflist|colwidth=40em|group=nb}}
{{reflist|3}}


===Bibliography===
=== References ===
{{Reflist|colwidth=24em}}

=== Bibliography ===
'''Primary sources'''
'''Primary sources'''
{{refbegin}}
{{refbegin}}
* {{cite paper | last = Buck | first = Leffert | authorlink = Leffert L. Buck | title = Report on the Renewal of Niagara Suspension Bridge | publisher = C. W. Ames & Co | location = New York, United States | date = December 13, 1880 | url = http://books.google.com/books?id=Y5kOAAAAYAAJ | accessdate = July 3, 2008}}
* {{cite paper |last=Buck |first=Leffert |authorlink=Leffert L. Buck |title=Report on the Renewal of Niagara Suspension Bridge |publisher= C. W. Ames & Co |location= New York, United States |date=December 13, 1880 |url=http://books.google.com/books?id=Y5kOAAAAYAAJ |accessdate=July 3, 2008 |ref=harv}}
* {{cite paper | last = Buck | first = Richard | coauthors = Buck, Leffert | title = The Niagara Railway Arch: With Discussion | publisher = Self-published | date = December 20, 1898 | url = http://books.google.com/books?id=DYcOAAAAYAAJ | accessdate = July 3, 2008}}
* {{cite paper |last1=Buck |first1=Richard |last2=Buck |first2=Leffert |title=The Niagara Railway Arch: With Discussion |publisher=Self-published |date=December 20, 1898 |url=http://books.google.com/books?id=DYcOAAAAYAAJ |accessdate=July 3, 2008 |ref=harv}}
* {{cite web |author=National Park Service |authorlink=National Park Service |url=http://nationalregisterofhistoricplaces.com/NY/Niagara/state.html |title=New York&mdash;Niagara County |accessdate=September 26, 2008 |year=2004 |publisher=[[National Register of Historic Places]] |location=Washington, D.C., United States}}
* {{cite web |author=National Park Service |authorlink=National Park Service |url=http://nationalregisterofhistoricplaces.com/NY/Niagara/state.html |title=New York&mdash;Niagara County |accessdate=September 26, 2008 |year=2004 |publisher=[[National Register of Historic Places]] |location=Washington, D.C., United States |ref=CITEREFNational_Park_Service2004}}
* {{cite paper | last = Roebling | first = John | title = Final Report of John A. Roebling, Civil Engineer, to the Presidents and Directors of the Niagara Falls Suspension and Niagara Falls International Bridge Companies | publisher = Steam Press of Les, Mann & Co | location = New York, United States | date = May 1, 1855 | url = http://digital.lib.lehigh.edu/cdm4/bridges_viewer.php?ptr=1550&view=de | accessdate = July 3, 2008}}
* {{cite paper |last=Roebling |first=John |title= Final Report of John A. Roebling, Civil Engineer, to the Presidents and Directors of the Niagara Falls Suspension and Niagara Falls International Bridge Companies |publisher= Steam Press of Les, Mann & Co |location=New York, United States |date=May 1, 1855 |url=http://digital.lib.lehigh.edu/cdm4/bridges_viewer.php?ptr=1550&view=de |accessdate=July 3, 2008 |ref=harv}}
* {{cite paper | last = Roebling | first = John | title = Report of John A. Roebling, Civil Engineer, to the Presidents and Directors of the Niagara Falls Suspension and Niagara Falls International Bridge Companies, on the Condition of the Niagara Railway Suspension Bridge | publisher = Murphy and Bechtel | location = New York, United States | date = August 1, 1860 | url = http://books.google.com/books?id=Di6x5SMUdl4C&printsec=frontcover | accessdate = July 3, 2008}}
* {{cite paper |last=Roebling |first=John |title= Report of John A. Roebling, Civil Engineer, to the Presidents and Directors of the Niagara Falls Suspension and Niagara Falls International Bridge Companies, on the Condition of the Niagara Railway Suspension Bridge |publisher=Murphy and Bechtel |location= New York, United States |date=August 1, 1860 |url=http://books.google.com/books?id=Di6x5SMUdl4C&printsec=frontcover |accessdate=July 3, 2008 |ref=harv}}
{{refend}}
{{refend}}


'''Secondary sources'''
'''Secondary sources'''
{{refbegin}}
{{refbegin}}
* {{cite web |url=http://www.prrths.com/Hagley/PRR1855%20Mar%2005.pdf |title=PRR Chronology 1855 |accessdate=July 7, 2008 |last=Baer |first=Christopher |year=2005 |month=March |format=PDF |publisher=Pennsylvania Railroad Technical & Historical Society |location=Pennsylvania, United States }}
* {{cite web |url=http://www.prrths.com/Hagley/PRR1855%20Mar%2005.pdf |title=PRR Chronology 1855 |accessdate=July 7, 2008 |last=Baer |first=Christopher |year=2005 |month=March |format=PDF |publisher=Pennsylvania Railroad Technical & Historical Society |location=Pennsylvania, United States |ref=harv}}
* {{cite book|last=Bianculli|first=Anthony|title=Trains and Technology: The American Railroad in the Nineteenth Century|year=2003|url=http://books.google.com/?id=tbtdcXXnq5kC|accessdate=July 15, 2008|volume=Vol. 4|publisher=[[University of Delaware Press]]|location=Delaware, United States|isbn=0-874-13803-5|chapter=Bridges&mdash;Suspension bridges|month=November}}
* {{cite book |last=Bianculli |first=Anthony |title=Trains and Technology: The American Railroad in the Nineteenth Century |year=2003 |url=http://books.google.com/?id=tbtdcXXnq5kC |accessdate=July 15, 2008 |volume=Vol. 4 |publisher=[[University of Delaware Press]] |location=Delaware, United States |isbn=0-874-13803-5 |chapter=Bridges&mdash;Suspension Bridges |month=November |ref=harv}}
* {{cite book|last=Billington|first=David|title=The Tower and the Bridge: The New Art of Structural Engineering|origyear=1983|year=1985|url=http://books.google.com/?id=5MTrpQFvWE8C&printsec=frontcover|accessdate=August 15, 2008|publisher=[[Princeton University Press]]|location=New Jersey, United States|isbn=0-691-02393-X|chapter=John Roebling and the Suspension Bridge|month=December}}
* {{cite book |last=Billington |first=David |title=The Tower and the Bridge: The New Art of Structural Engineering |origyear=1983 |year=1985 |url=http://books.google.com/?id=5MTrpQFvWE8C&printsec=frontcover |accessdate=August 15, 2008 |publisher=[[Princeton University Press]] |location=New Jersey, United States |isbn=0-691-02393-X |chapter=John Roebling and the Suspension Bridge |ref=harv}}
* {{cite book|last=Brightly|first=Frederick|title=An Analytical Digest of the Laws of the United States|year=1869|url=http://books.google.com/?id=VVsUAAAAYAAJ|accessdate=September 22, 2008|volume=Vol. 2|publisher=Kay & Brother|location=Philadelphia, United States|chapter=New York&mdash;Collection Districts}}
* {{cite book |last=Brightly |first=Frederick |title=An Analytical Digest of the Laws of the United States |year=1869 |url=http://books.google.com/?id=VVsUAAAAYAAJ |accessdate=September 22, 2008 |volume=Vol. 2 |publisher=Kay & Brother |location=Philadelphia, United States |chapter=New York&mdash;Collection Districts |ref=harv}}
* {{cite news |first=Rob |last=Carson |title=Spinning into History |url=http://www.thenewstribune.com/937/story/79126.html |work=[[The News Tribune]] |publisher=Tacoma News |location=Washington, United States |date=October 16, 2005 |accessdate=September 17, 2008 }}
* {{cite news |first=Rob |last=Carson |title=Spinning into History |url=http://www.thenewstribune.com/937/story/79126.html |work=[[The News Tribune]] |publisher=Tacoma News |location=Washington, United States |date=October 16, 2005 |accessdate=September 17, 2008 |ref=harv}}
* {{cite book|last=Crabtree|first=Jerome|title=The Marvels of Modern Mechanism and Their Relations to Social Betterment|year=1901|url=http://books.google.com/?id=SyRDAAAAIAAJ|accessdate=September 4, 2008|volume=Vol. 1|publisher=The King-Richardson Company|location=Massachusetts, United States|chapter=Iron and Steel Working}}
* {{cite book |last=Crabtree |first=Jerome |title=The Marvels of Modern Mechanism and Their Relations to Social Betterment |year=1901 |url=http://books.google.com/?id=SyRDAAAAIAAJ |accessdate=September 4, 2008 |volume=Vol. 1 |publisher=The King-Richardson Company |location=Massachusetts, United States |chapter=Iron and Steel Working |ref=harv}}
* {{cite book|last=Disturnell|first=John|title=The Traveler's Guide to the Hudson River, Saratoga Springs, Lake George, Falls of Niagara and Thousand Islands: Also, to the Green and White Mountains, and Other Parts of New England, Forming the Fashionable Northern Tour Through the United States and Canada|year=1864|url=http://books.google.com/?id=cDYWAAAAYAAJ|accessdate=July 15, 2008|publisher=American News Co|location=New York, United States}}
* {{cite book |last=Disturnell |first=John |title=The Traveler's Guide to the Hudson River, Saratoga Springs, Lake George, Falls of Niagara and Thousand Islands: Also, to the Green and White Mountains, and Other Parts of New England, Forming the Fashionable Northern Tour Through the United States and Canada |year=1864 |url=http://books.google.com/?id=cDYWAAAAYAAJ |accessdate=July 15, 2008 |publisher=American News Company |location=New York, United States |ref=harv}}
* {{cite book|last=Dubinsky|first=Karen|title=The Second Greatest Disappointment: Honeymooning and Tourism at Niagara Falls|year=1999|url=http://books.google.com/?id=NxkE2wRfjAQC|accessdate=September 14, 2008|publisher=[[Rutgers University Press]]|location=New Jersey, United States|isbn=1-896-35723-7|chapter=The People's Niagara at the Turn of the Century|month=March}}
* {{cite book |last=Dubinsky |first=Karen |title=The Second Greatest Disappointment: Honeymooning and Tourism at Niagara Falls |year=1999 |url=http://books.google.com/?id=NxkE2wRfjAQC |accessdate=September 14, 2008 |publisher=[[Rutgers University Press]] |location=New Jersey, United States |isbn=1-896-35723-7 |chapter=The People's Niagara at the Turn of the Century |month=March |ref=harv}}
* {{cite book|last=Dumych|first=Daniel|title=Niagara Falls|year=1996|url=http://books.google.com/?id=2YKEeldLysoC|accessdate=July 27, 2008|publisher=[[Arcadia Publishing]]|location=New Hampshire, United States|isbn=0-738-53736-5|month=July}}
* {{cite book |last=Dumych |first=Daniel |title=Niagara Falls |year=1996 |url=http://books.google.com/?id=2YKEeldLysoC |accessdate=July 27, 2008 |publisher=[[Arcadia Publishing]] |location=New Hampshire, United States |isbn=0-738-53736-5 |month=July |ref=harv}}
* {{cite news |first=Gee |last=Denise |title=Underground Railroad expert set to develop museum in Niagara Falls |url=http://www.buffalonews.com/cityregion/niagaracounty/story/445338.html |work=[[The Buffalo News]] |publisher=Stanford Lipsey |location=New York, United States |date=September 22, 2008 |accessdate=September 27, 2008 }}
* {{cite news |first=Denise |last=Gee |title=Underground Railroad Expert Set to Develop Museum in Niagara Falls |url=http://www.buffalonews.com/cityregion/niagaracounty/story/445338.html |work=[[The Buffalo News]] |publisher=Stanford Lipsey |location=New York, United States |date=September 22, 2008 |accessdate=September 27, 2008 |ref=harv}}
* {{cite book|last=Grant|first=John|coauthors=Jones, Ray|title=Niagara Falls: An Intimate Portrait|date=June 1, 2006|url=http://books.google.com/?id=xQDo2HvBQv8C|accessdate=September 17, 2008|publisher=Globe Pequot|location=Connecticut, United States|isbn=0-762-74025-6|chapter=Suspended by Steel Ropes}}
* {{cite book |last1=Grant |first1=John |last2=Jones |first2=Ray |title=Niagara Falls: An Intimate Portrait |date=June 1, 2006 |url=http://books.google.com/?id=xQDo2HvBQv8C |accessdate=September 17, 2008 |publisher=Globe Pequot |location=Connecticut, United States |isbn=0-762-74025-6 |chapter=Suspended by Steel Ropes |ref=harv}}
* {{cite journal|last=Griggs|first=Francis|year=2006|month=October|title=Great Achievements&mdash;Charles Ellet, Jr.|journal=Structure|publisher=[[National Council of Structural Engineers Associations]]|location=Illinois, United States|issn=0969-2126|url=http://www.structuremag.org/article.aspx?articleID=158|format=PDF|accessdate=July 14, 2008}}
* {{cite journal |last=Griggs |first=Francis |year=2006a |month=October |title=Great Achievements&mdash;Charles Ellet, Jr. |journal=Structure |publisher=[[National Council of Structural Engineers Associations]] |location=Illinois, United States |issn=0969-2126 |url=http://www.structuremag.org/article.aspx?articleID=158 |format=PDF |accessdate=July 14, 2008 |ref=harv}}
* {{cite journal|last=Griggs|first=Francis|year=2006|month=November|title=Great Achievements&mdash;John A. Roebling|journal=Structure|publisher=National Council of Structural Engineers Associations|location=Illinois, United States|issn=0969-2126|url=http://www.structuremag.org/article.aspx?articleID=180|format=PDF|accessdate=July 14, 2008}}
* {{cite journal |last=Griggs |first=Francis |year=2006b |month=November |title=Great Achievements&mdash;John A. Roebling| journal=Structure |publisher=National Council of Structural Engineers Associations |location=Illinois, United States |issn=0969-2126 |url=http://www.structuremag.org/article.aspx?articleID=180 |format=PDF |accessdate=July 14, 2008 |ref=harv}}
* {{cite book|last=Holley|first=George|title=The Falls of Niagara with Supplementary Chapters on the Other Famous Cataracts of the World|year=1883|url=http://www.niagara.edu/library/nfguides/holley.html|accessdate=July 22, 2008|publisher=A.C. Armstrong & Son|location=New York, United States|chapter=Chapter XVI|chapterurl=http://www.niagara.edu/library/nfguides/hol137-143.pdf}}
* {{cite book |last=Holley |first=George |title=The Falls of Niagara with Supplementary Chapters on the Other Famous Cataracts of the World |year=1883 |url=http://www.niagara.edu/library/nfguides/holley.html |accessdate=July 22, 2008 |publisher=A.C. Armstrong & Son |location=New York, United States |chapter=Chapter XVI |chapterurl=http://www.niagara.edu/library/nfguides/hol137-143.pdf |ref=harv}}
* {{cite book|last=Irwin|first=William|title=The New Niagara: Tourism, Technology, and the Landscape of Niagara Falls, 1776&ndash;1917|year=1996|month=March|url=http://books.google.com/?id=yarkTJGfL2IC|accessdate=July 30, 2008|publisher=[[Penn State University Press]]|location=Pennsylvania, United States|isbn=0-271-01593-4|chapter=Bridge to a New Niagara}}
* {{cite book |last=Irwin |first=William |title=The New Niagara: Tourism, Technology, and the Landscape of Niagara Falls, 1776&ndash;1917 |year=1996 |month=March |url=http://books.google.com/?id=yarkTJGfL2IC |accessdate=July 30, 2008 |publisher=[[Penn State University Press]] |location=Pennsylvania, United States |isbn=0-271-01593-4 |chapter=Bridge to a New Niagara |ref=harv}}
* {{cite book|last=Kostoff|first=Robert|title=Remembering Niagara: Tales from Beyond the Falls|year=2008|url=http://books.google.com/?id=FOxu-VVr04oC|accessdate=September 17, 2008|publisher=The History Press|location=South Carolina, United States|isbn=1-596-29451-5|chapter=Suspension Bridge}}
* {{cite book |last=Kostoff |first=Robert |title=Remembering Niagara: Tales from Beyond the Falls |year=2008 |url=http://books.google.com/?id=FOxu-VVr04oC |accessdate=September 17, 2008 |publisher=The History Press |location=South Carolina, United States |isbn=1-596-29451-5 |chapter=Suspension Bridge |ref=harv}}
* {{cite news |first=Mark |last=MacKenzie |title=Let's Go Drive a Kite |url=http://findarticles.com/p/articles/mi_qn4159/is_20030803/ai_n12743186 |work=[[The Independent|The Independent on Sunday]] |publisher=[[Independent News & Media]] |location=London, United Kingdom |date=August 3, 2003 |accessdate=July 7, 2008 }}
* {{cite news |first=Mark |last=MacKenzie |title=Let's Go Drive a Kite |url=http://findarticles.com/p/articles/mi_qn4159/is_20030803/ai_n12743186 |work=[[The Independent|The Independent on Sunday]] |publisher=[[Independent News & Media]] |location=London, United Kingdom |date=August 3, 2003 |accessdate=July 7, 2008 |ref=harv}}
* {{cite book|last=McCullough|first=David|authorlink=David McCullough|title=The Great Bridge: The Epic Story of the Building of the Brooklyn Bridge|origyear=1972|url=http://books.google.com/?id=bOM93rb22YEC|accessdate=July 24, 2008|edition=Classic|year=2001|month=June|publisher=[[Simon & Schuster]]|location=New York, United States|isbn=0-743-21737-3}}
* {{cite book |last=McCullough |first=David |authorlink=David McCullough |title=The Great Bridge: The Epic Story of the Building of the Brooklyn Bridge |origyear=1972 |url=http://books.google.com/?id=bOM93rb22YEC |accessdate=July 24, 2008 |edition=Classic |year=2001 |month=June |publisher=[[Simon & Schuster]] |location=New York, United States |isbn=0-743-21737-3 |ref=harv}}
* {{cite book|last=Merritt|first=Jedediah|title=Biography of the Hon. W. H. Merritt, M. P.: Of Lincoln, District of Niagara, Including an Account of the Origin, Progress and Completion of Some of the Most Important Public Works in Canada|year=1875|url=http://books.google.com/?id=09EOAAAAYAAJ|accessdate=July 15, 2008|publisher=E. S. Leavenworth|location=Ontario, Canada}}
* {{cite book |last=Merritt |first=Jedediah |title=Biography of the Hon. W. H. Merritt, M. P.: Of Lincoln, District of Niagara, Including an Account of the Origin, Progress and Completion of Some of the Most Important Public Works in Canada |year=1875 |url=http://books.google.com/?id=09EOAAAAYAAJ |accessdate=July 15, 2008 |publisher=E. S. Leavenworth |location=Ontario, Canada |ref=harv}}
* {{cite book|last=Middleton|first=William|title=The Bridge at Québec|year=2001|month=May|url=http://books.google.com/?id=JjdRuG7xmlwC|accessdate=July 18, 2008|publisher=[[Indiana University Press]]|location=Indiana, United States|isbn=0-253-33761-5|chapter=A Bridge at the Narrowing}}
* {{cite book |last=Middleton |first=William |title=The Bridge at Québec |year=2001 |month=May |url=http://books.google.com/?id=JjdRuG7xmlwC |accessdate=July 18, 2008 |publisher=[[Indiana University Press]] |location=Indiana, United States |isbn=0-253-33761-5 |chapter=A Bridge at the Narrowing |ref=harv}}
* {{cite book|last=Nye|first=David|title=American Technological Sublime|origyear=1994|url=http://books.google.com/?id=LrdbOJFxWIoC|accessdate=September 16, 2008|edition=New|date=May 2, 1996|publisher=[[MIT Press]]|location=Massachusetts, United States|isbn=0-262-64034-1|month=February}}
* {{cite book |last=Nye |first=David |title=American Technological Sublime |origyear=1994 |url=http://books.google.com/?id=LrdbOJFxWIoC |accessdate=September 16, 2008 |edition=New |date=May 2, 1996 |publisher=[[MIT Press]] |location=Massachusetts, United States |isbn=0-262-64034-1 |ref=harv}}
* {{cite book|last=Pairpoint|first=Alfred|title=Uncle Sam and His Country, or, Sketches of America, in 1854-55-56|year=1857|url=http://books.google.com/?id=HLC19ltLMeYC|accessdate=July 16, 2008|publisher=Simpkin, Marshall, and Co|location=London, United Kingdom|chapter=The Niagara Suspension-Bridge}}
* {{cite book |last=Pairpoint |first=Alfred |title=Uncle Sam and His Country, or, Sketches of America, in 1854&ndash;55&ndash;56 |year=1857 |url=http://books.google.com/?id=HLC19ltLMeYC |accessdate=July 16, 2008 |publisher=Simpkin, Marshall, and Company |location=London, United Kingdom |chapter=The Niagara Suspension-Bridge |ref=harv}}
* {{cite book|last=Powell|first=James|title=A History of the Canadian Dollar|year=1999|url=http://www.bank-banque-canada.ca/en/dollar_book/|format=PDF|accessdate=August 25, 2008|publisher=[[Bank of Canada]]|location=Ontario, Canada|isbn=0-662-28123-3|chapter=Currency Reforms (1841&ndash;71)}}
* {{cite book |last=Powell |first=James |title=A History of the Canadian Dollar |year=1999 |url=http://www.bank-banque-canada.ca/en/dollar_book/ |format=PDF |accessdate=August 25, 2008 |publisher=[[Bank of Canada]] |location=Ontario, Canada |isbn=0-662-28123-3 |chapter=Currency Reforms (1841&ndash;71) |ref=harv}}
* {{cite book|last=Reier|first=Sharon|title=The Bridges of New York|origyear=1977|date=September 8, 2000|url=http://books.google.com/?id=q06H7PP-Q9sC|accessdate=July 20, 2008|publisher=[[Dover Publications]]|location=New York, United States|isbn=0-486-41230-X|chapter=Brooklyn Bridge}}
* {{cite book |last=Reier |first=Sharon |title=The Bridges of New York |origyear=1977 |date=September 8, 2000 |url=http://books.google.com/?id=q06H7PP-Q9sC |accessdate=July 20, 2008 |publisher=[[Dover Publications]] |location=New York, United States |isbn=0-486-41230-X |chapter=Brooklyn Bridge |ref=harv}}
* {{cite journal|last=Robertson|first=Joseph|date=January 25, 1851|title=Niagara Suspension Bridge|journal=The Mechanics' Magazine, Museum, Register, Journal and Gazette|volume= 54|issue= 1433|publisher=Robertson and Co.|location=London, United Kingdom|url=http://books.google.com/?id=Suc3AAAAMAAJ|accessdate=September 15, 2008}}
* {{cite journal |last=Robertson |first=Joseph |date=January 25, 1851 |title=Niagara Suspension Bridge |journal=The Mechanics' Magazine, Museum, Register, Journal and Gazette |volume=54 |issue=1433 |publisher=Robertson and Company |location=London, United Kingdom |url=http://books.google.com/?id=Suc3AAAAMAAJ |accessdate=September 15, 2008 |ref=harv}}
* {{cite web |url=http://www.niagarakite.com/history.html |title=The Kite that Bridged the Niagara |accessdate=July 7, 2008 |last=Robinson |first=Meg |year=2005 |publisher=Niagara International Kite Festival |location=Niagara Falls, United States |archiveurl=http://web.archive.org/web/20080618043751/http://www.niagarakite.com/history.html |archivedate=2008-06-18}}
* {{cite web |url=http://www.niagarakite.com/history.html |title=The Kite that Bridged the Niagara |accessdate=July 7, 2008 |last=Robinson |first=Meg |year=2005 |publisher=Niagara International Kite Festival |location=Niagara Falls, United States |archiveurl=http://web.archive.org/web/20080618043751/http://www.niagarakite.com/history.html |archivedate=June 18, 2008 |ref=harv}}
* {{cite book|last=Roebling|first=Washington|authorlink=Washington Roebling|editor-first=Donald|editor-last=Sagenya|editor-link=Donald Sayenga|title=Washington Roebling's Father: A Memoir of John A. Roebling|year=2008|url=http://books.google.com/?id=mB8er1ajraUC|accessdate=July 27, 2009|publisher=[[American Society of Civil Engineers]]|location=Virginia, United States|isbn=0-784-40948-X}}
* {{cite book |last=Roebling |first=Washington |authorlink=Washington Roebling |editor-first=Donald |editor-last=Sagenya |editor-link=Donald Sayenga |title=Washington Roebling's Father: A Memoir of John A. Roebling |year=2008 |url=http://books.google.com/?id=mB8er1ajraUC |accessdate=July 27, 2009 |publisher=[[American Society of Civil Engineers]] |location=Virginia, United States |isbn=0-784-40948-X |ref=harv}}
* {{cite journal|last=Ryerson|first=Egerton|authorlink=Egerton Ryerson|coauthors=Hodgins, John|year=1854|title=The Niagara Suspension Bridge|journal=The Journal of Education for Upper Canada|volume= 8|issue= 10|publisher=Lovell and Gibson|location=Toronto, Canada|url=http://books.google.com/?id=iOsBAAAAYAAJ|accessdate=July 17, 2008}}
* {{cite journal |last1=Ryerson |first1=Egerton |authorlink=Egerton Ryerson |last2=Hodgins |first2=John| year=1854 |title=The Niagara Suspension Bridge |journal=The Journal of Education for Upper Canada |volume=8 |issue=10 |publisher=Lovell and Gibson |location=Toronto, Canada |url=http://books.google.com/?id=iOsBAAAAYAAJ |accessdate=July 17, 2008 |ref=harv}}
* {{cite book|last=Scott|first=Richard|title=In the Wake of Tacoma: Suspension Bridges and the Quest for Aerodynamic Stability|year=2001|month=June|url=http://books.google.com/?id=DnQOzYDJsm8C|accessdate=July 18, 2008|publisher=American Society of Civil Engineers|location=Virginia, United States|isbn=0-784-40542-5}}
* {{cite book |last=Scott |first=Richard |title=In the Wake of Tacoma: Suspension Bridges and the Quest for Aerodynamic Stability |year=2001 |month=June |url=http://books.google.com/?id=DnQOzYDJsm8C |accessdate=July 18, 2008 |publisher=American Society of Civil Engineers |location=Virginia, United States |isbn=0-784-40542-5 |ref=harv}}
* {{cite book|last=Skempton|first=Alec|authorlink=Alec Skempton|coauthors=Chrimes, Mike|title=A Biographical Dictionary of Civil Engineers in Great Britain and Ireland: 1500 to 1830|date=February 28, 2002|url=http://books.google.com/?id=jeOMfpYMOtYC|accessdate=September 4, 2008|volume=Vol. 1|publisher=Thomas Telford|location=London, United Kingdom|isbn=0-727-72939-X|chapter=Biographical Dictionary}}
* {{cite book |last1=Skempton |first1=Alec |authorlink=Alec Skempton |last2=Chrimes |first2=Mike |title=A Biographical Dictionary of Civil Engineers in Great Britain and Ireland: 1500 to 1830 |date=February 28, 2002 |url=http://books.google.com/?id=jeOMfpYMOtYC |accessdate=September 4, 2008 |volume=Vol. 1 |publisher=Thomas Telford |location=London, United Kingdom |isbn=0-727-72939-X |chapter=Biographical Dictionary |ref=harv}}
* {{cite book|last=Strand|first=Ginger|title=Inventing Niagara: Beauty, Power, and Lies|year=2008|url=http://books.google.com/?id=RlTXgSWJcxQC|accessdate=August 30, 2008|publisher=[[Simon & Schuster]]|location=New York, United States|isbn=1-416-54656-1|chapter=The Other Side of Jordan}}
* {{cite book |last=Strand |first=Ginger |title=Inventing Niagara: Beauty, Power, and Lies |year=2008 |url=http://books.google.com/?id=RlTXgSWJcxQC |accessdate=August 30, 2008 |publisher=[[Simon & Schuster]] |location=New York, United States |isbn=1-416-54656-1 |chapter=The Other Side of Jordan |ref=harv}}
* {{cite book|last=Switala|first=William|title=Underground Railroad in New Jersey and New York|year=2006|url=http://books.google.com/?id=CKjSCjMKhmYC|accessdate=September 15, 2008|publisher=Stackpole Books|location=Pennsylvania, United States|isbn=0-811-73258-4|chapter=Operation of the Railroad|month=July}}
* {{cite book |last=Switala |first=William |title=Underground Railroad in New Jersey and New York |year=2006 |url=http://books.google.com/?id=CKjSCjMKhmYC |accessdate=September 15, 2008 |publisher=Stackpole Books |location=Pennsylvania, United States |isbn=0-811-73258-4 |chapter=Operation of the Railroad |month=July |ref=harv}}
* {{cite web |url=http://www.biographi.ca/009004-119.01-e.php?&id_nbr=4597&&PHPSESSID=5lr783nlhnoq51kss1o7o0v9t6 |title=Merritt, William Hamilton |accessdate=September 17, 2008 |last=Talman |first=James |year=2000 |work=[[Dictionary of Canadian Biography|Dictionary of Canadian Biography Online]] |location=Canada }}
* {{cite web |url=http://www.biographi.ca/009004-119.01-e.php?&id_nbr=4597&&PHPSESSID=5lr783nlhnoq51kss1o7o0v9t6 |title=Merritt, William Hamilton |accessdate=September 17, 2008 |last=Talman |first=James |year=2000 |work=[[Dictionary of Canadian Biography|Dictionary of Canadian Biography Online]] |location=Canada |ref=harv}}
* {{cite book|last=Tesmer|first=Irving|coauthors=Bastedo, Jerold|title=Colossal Cataract: The Geologic History of Niagara Falls|year=1981|month=June|url=http://books.google.com/?id=_IFDxu0oGQMC|accessdate=September 15, 2008|publisher=[[State University of New York Press]]|location=New York, United States|isbn=0-873-95522-6|chapter=Operation of the Railroad}}
* {{cite book |last1=Tesmer |first1=Irving |last2=Bastedo |first2=Jerold| title=Colossal Cataract: The Geologic History of Niagara Falls |year=1981 |month=June |url=http://books.google.com/?id=_IFDxu0oGQMC |accessdate=September 15, 2008 |publisher=[[State University of New York Press]] |location=New York, United States |isbn=0-873-95522-6 |chapter=Operation of the Railroad |ref=harv}}
* {{cite book|last=Trachtenberg|first=Alan|title=Brooklyn Bridge: Fact and Symbol|origyear=1965|url=http://books.google.com/?id=WnHlYj6ApiEC|accessdate=September 18, 2008|edition=Second|date=July 15, 1979|publisher=University of Chicago Press|location=Illinois, United States|isbn=0-226-81115-8|chapter=An American Dream}}
* {{cite book |last=Trachtenberg |first=Alan |title=Brooklyn Bridge: Fact and Symbol |origyear=1965 |url=http://books.google.com/?id=WnHlYj6ApiEC |accessdate=September 18, 2008 |edition=Second |date=July 15, 1979 |publisher=University of Chicago Press |location=Illinois, United States |isbn=0-226-81115-8 |chapter=An American Dream |ref=harv}}
* {{cite book|last=Troyano|first=Leonardo Fernández|title=Bridge Engineering: A Global Perspective|date=September 22, 2003|url=http://books.google.com/?id=0u5G8E3uPUAC|accessdate=September 4, 2008|publisher=Thomas Telford|location=London, United Kingdom|isbn=0-727-73215-3}}
* {{cite book |last=Troyano |first=Leonardo Fernández |title=Bridge Engineering: A Global Perspective |date=September 22, 2003 |url=http://books.google.com/?id=0u5G8E3uPUAC |accessdate=September 4, 2008 |publisher=Thomas Telford |location=London, United Kingdom |isbn=0-727-73215-3 |ref=harv}}
* {{cite book|last=Tyrrell|first=Henry|title=History of Bridge Engineering|year=1911|url=http://books.google.com/?id=0FNVAAAAMAAJ|accessdate=July 25, 2008|publisher=Self-published|location=Chicago, United States|chapter=Suspension Bridges}}
* {{cite book |last=Tyrrell |first=Henry |title=History of Bridge Engineering |year=1911 |url=http://books.google.com/?id=0FNVAAAAMAAJ |accessdate=July 25, 2008 |publisher=Self-published |location=Chicago, United States |chapter=Suspension Bridges |ref=harv}}
* {{cite web |url=http://best-breezes.squarespace.com/homan-walsh/ |title=Homan Walsh&mdash;Bridging the Niagara River Gorge With a Kite |first=Bob |last=White |year=2010 |work=Best Breezes |publisher=Self-published |location=Onatario, Canada |archiveurl= |archivedate= |accessdate=July 19, 2010 |quote= |ref=harv}}
* {{cite book|last=Wilson|first=Ken|title=Everybody's Heard of Blondin|year=1990|month=March|url=http://books.google.com/?id=WPW2zlXeovQC|accessdate=September 3, 2008|publisher=Pond View Books|location=Peterborough, United Kingdom|isbn=1-871-04435-9}}
* {{cite book |last=Wilson |first=Ken |title=Everybody's Heard of Blondin |year=1990 |month=March |url=http://books.google.com/?id=WPW2zlXeovQC |accessdate=September 3, 2008 |publisher=Pond View Books |location=Peterborough, United Kingdom |isbn=1-871-04435-9 |ref=harv}}
{{refend}}
{{refend}}


==External links==
== External links ==
{{commons|Niagara Falls Suspension Bridge}}
{{commons|Niagara Falls Suspension Bridge}}
* [http://www.iaw.com/~falls/bridges.html Bridges Over Niagara Falls] at Niagara Falls Thunder Alley
* [http://www.iaw.com/~falls/bridges.html Bridges Over Niagara Falls] at Niagara Falls Thunder Alley

Revision as of 06:06, 23 July 2010

Niagara Falls Suspension Bridge
A man and a woman stand in the foreground, viewing a bridge that spans a river. The bridge is suspended on lines that are supported by two stone towers on each side of the river. The bridge has two levels; a train travels on the top level, while people and horse-drawn carriages cross on the bottom. In the far distance is a waterfall.
Hand-colored lithograph of the Suspension Bridge as seen from the American side; the bridge's architecture, the distant Niagara Falls, and the Maid of the Mist below the bridge are visible.
Coordinates43°06′33″N 79°03′30″W / 43.1092°N 79.0583°W / 43.1092; -79.0583
CarriesTrains and carriages
CrossesNiagara River
LocaleNiagara Falls, New York and Niagara Falls, Ontario
Official nameInternational Suspension Bridge (United States)
Niagara Falls Suspension Bridge (Canada)
Maintained byNiagara Falls International Bridge Company (United States)
Niagara Falls Suspension Bridge Company (Canada)
Characteristics
DesignSuspension bridge
MaterialWood, limestone, cast iron, and wrought iron (gradually replaced with steel)
Longest span825 feet (251 m)
Load limit450 short tons (410 t)
Clearance below250 feet (76 m)
History
DesignerCharles Ellet, Jr.
(1847–48)
John A. Roebling
(1851–55)
Leffert L. Buck
(1877–86)
OpenedAugust 1, 1848 (temporary bridge)
March 18, 1855 (railway)
ClosedAugust 27, 1897
Statistics
Daily traffic45 trains per day (1860)
Toll25 cents per person, 50 cents per horse-carriage, 50 cents per carriage passenger (1873)
Location
Map

The Niagara Falls Suspension Bridge was the world's first working railway suspension bridge. It spanned 825 feet (251 m) and stood 2.5 miles (4.0 km) downstream of Niagara Falls from 1855 to 1897. Connecting Niagara Falls, Ontario to Niagara Falls, New York (the two cities assimilated the towns at the ends of the bridge by 1892), the bridge carried mixed traffic on its two decks across the Niagara River; trains crossed over the river by way of the bridge's upper deck while pedestrians and carriages used the lower. As the bridge was the result of a collaboration of two companies from two countries, it was also known by its American name, the International Suspension Bridge. The bridge had other names including the Niagara Railway Suspension Bridge and Niagara Suspension Bridge, but the most common and definitive was simply the Suspension Bridge.

The Suspension Bridge was part of Canadian politician William Hamilton Merritt's vision to promote trade within his country and with its neighbor the United States. When Merritt and company invited the engineering community to bid for the bridge project, they encountered heavy criticism. Many bridge builders, and the general public, did not believe a suspension bridge could allow the safe passage of trains. Nonetheless, the bridge companies engaged several well-known civil engineers to build and maintain the bridge. Charles Ellet, Jr. was first hired to construct the bridge. Using a line laid by a kite across the 800-foot (240 m) chasm, he built a temporary suspension bridge in 1848 as the first part of his plan. Not long after, Ellet left the project after a bitter financial dispute with the bridge companies. A three-year hiatus followed before the companies hired John Augustus Roebling to complete the project. Roebling used Ellet's bridge as scaffolding to build the double-decked bridge. By 1854 his bridge was nearly complete, and the lower deck was opened for pedestrian and carriage travel. On March 18, 1855, a fully laden passenger train drove across the upper deck at 5 miles per hour (8.0 km/h), and officially opened the completed bridge.

As a border crossing between Canada and the United States, the Suspension Bridge played significant roles in the histories of the Niagara region and the two countries. Three railway lines crossed over the bridge, connecting cities on both sides of the border. The Great Western Railway, New York Central Railroad, and New York and Erie Rail Road differed in the width of their tracks; the bridge used a triple gauge system to conserve space, overlapping two tracks on top of each other and using a rail of each to form the third track. The railroads brought a large influx of trade and tourists into the region around the Niagara Falls. Growing quickly from the traffic, the small towns at the ends of the bridge were integrated into the Niagara Falls cities. Many tourists flocked to the bridge to view the acclaimed marvel of engineering, as well as tightrope-walking daredevils who performed against the backdrop of the falls. In the time leading to the American Civil War, the Underground Railroad helped slaves in the United States escape across the Suspension Bridge to freedom in Canada. After the war, the bridge became a symbol of inspiration to Americans, encouraging them to rebuild their country and pushing them to quickly industrialize their nation.

Throughout its years of service, the Suspension Bridge stood strong and allowed thousands of passengers and trains to pass over it safely. Its success proved that, contrary to general opinion, a safe and operational railway suspension bridge was tenable, and allayed concerns induced by the 1854 collapse of the Wheeling Suspension Bridge. Slowly decaying, the bridge's wooden structures were replaced with steel and iron versions by 1886, and the renovated bridge was stronger, capable of bearing a heavier load. By the end of the 19th century, the weight of trains had increased greatly and far exceeded the maximum capacity of the bridge. The Suspension Bridge was finally replaced by the Steel Arch Bridge, which was later renamed the Whirlpool Rapids Bridge, on August 27, 1897. When the Suspension Bridge was dismantled, its wire cables were found not to have noticeably degraded, a testament to its strength and design.

Conception and building

In the middle of the 19th century, the hinterlands of the North American East Coast were opened up rapidly; colonists moved further inland, pushing back the wilderness and establishing settlements that grew into towns and cities. The growth of these centers of civilization was fueled by the increasing number of routes set up to facilitate trade among the settlements.[1] Canadian entrepreneur and politician William Hamilton Merritt was a major contributor to the establishment of several trade routes in his country. His primary focus was on the lakes and the dredging of waterways to open up trade between the lake cities. He also showed interest in railroads, envisioning a network that connected cities on both sides of the United States–Canadian border from the Atlantic coast in the East to the new territories in the West. Merritt's dream would lead to the creation of a man-made structure, a railway suspension bridge, that spanned the Niagara River alongside the river's acclaimed natural feature, the Niagara Falls.[2]

A white-haired man in a suit and bowtie faces the right.
William Hamilton Merritt was the chief proponent for the Suspension Bridge, persevering to obtain charters for the bridge.

Merritt's vision for the Niagara Suspension Bridge was conceived at the Niagara River itself.[nb 1] In the summer of 1844 while taking a picnic on the river shores, near what was then the town of Clifton, Merritt read a letter from his sons to his wife. The younger Merritts were touring Europe and visited the town of Fribourg, Switzerland. Amazed by the Freiburg Suspension Bridge,[4] they wrote to their parents, describing the wonders of the bridge in eloquent terms. Their writing had a profound effect on their parents, and the elder Merritts wondered if such a suspension bridge could be built across the Niagara.[5] Merritt was driven to realize that vision, and he approached the relevant authorities, including the Queen of England,[6] for permission to start the construction of the suspension bridge. His efforts were rewarded in 1846; the state of New York and the government of Canada approved the charters to form the Niagara Falls International Bridge Company and the Niagara Falls Suspension Bridge Company, respectively.[7]

In the years before the first bridge was built over the Niagara River, the river was crossed entirely by boats. Powered by steam engines, vessels ferried people and carriages across the raging river at calmer points of the water. One of these vessels was the Maid of the Mist, the first tourist boat to ply the waters of the Niagara River. Named after a local legend, the steamer began service in 1846.[8] Launching from a point 2 miles (3.2 km) below the Horseshoe Falls, it chugged up to the base of the falls, offering a close-up view of the natural wonder to its passengers, before moving to the opposite shore. The site for the Suspension Bridge was half a mile (0.8 km) from the Maid of the Mist's landings.[9] The selection of the bridge site was based more on aesthetics than technical ease; it was the narrowest point of the gorge—800 feet (240 m) across and 230 feet (70 m) deep—that allowed a full view of the falls from the American side.[10][nb 2]

After the bridge companies were founded, they invited engineers to submit plans and cost estimates for a suspension bridge that carried a railway. The invitation was met with skepticism among the engineering community. At that time, there was not a suspension bridge that could allow a train to pass over it safely.[12] While the Europeans were erecting suspension bridges by the hundreds,[13] the Americans mostly ignored them out of safety concerns; in 1831 Sir Samuel Brown's Broughton Suspension Bridge in Britain had collapsed under the marching feet of a troop of soldiers, sending those on its deck into the River Irwell.[14][nb 3] Furthermore, many American bridges had collapsed without experiencing weight and pressure equivalent to railroad traffic, and American engineers feared that any railway bridge would likely fail—especially a suspension bridge.[16]

Four engineers responded: Edward Serrell, Samuel Keefer, Charles Ellet, Jr., and John Augustus Roebling. All submitted designs for a suspension bridge. At the time of the bidding, Ellet and Roebling were acknowledged as masters of suspension bridge building in America. Roebling submitted two designs, a conservative single-deck suspension bridge and a double-decked version,[17] both with meticulous calculations and drawings. Instead of relying solely on submissions, Charles Ellet, Jr. took a proactive approach. When he got wind of the project in 1845, he wrote to Charles B. Stuart, chief engineer of the Great Western Railway,[nb 4] boldly proclaiming that he could build a bridge for any likely purpose across the Niagara. After the charters had been obtained, Ellet helped Stuart to sell the bridge companies' stock and offered to buy US$30,000[nb 5] worth of stock himself. His efforts earned him the $190,000 bridge contract on November 9, 1847.[19]

Charles Ellet, Jr.'s temporary bridge

Side profile of a man who has his hair combed back
Charles Ellet, Jr., the first American-born civil engineer with European education in engineering, campaigned for suspension bridges in United States.

While growing up on a farm in Pennsylvania, Charles Ellet, Jr. scraped through odd jobs, but saved enough money to finance an education at the École nationale des Ponts et Chaussées in France.[20] After attending four months of lectures, he toured Europe before returning to the United States as the only native-born American with European education in engineering. Ellet announced his ambitions to build suspension bridges in his country of birth by proposing to span the Potomac River with one. His proposal was ignored; few were willing to heed a young, inexperienced and impetuous engineer.[21] To gain experience, Ellet started to work on railroads and canals, and later became the chief engineer on the James River and Kanawha Canal project. He further improved his reputation by contributing articles about suspension bridges to respected engineering journals, such as American Railroad Journal; eventually, Ellet built his first suspension bridge over the Schuylkill River, Pennsylvania, in 1842.[22]

Ellet had the looks of an actor,[23] which were complemented by his entertaining oratorical skills.[16] He took advantage of these characteristics, and used showmanship and dramatics to market his proposals. These skills helped to win him attention and raise his profile both in the public and within the industry. However, his imperiousness also ruffled the feathers of people, which caused conflicts.[24] Nonetheless, his capability to promote himself had won him the contracts for the Suspension Bridge and the later Wheeling Suspension Bridge; the Wheeling contract was won in July 1847 while Ellet's plan for the Niagara Suspension Bridge was still in its initial stages of construction. Ellet's initial design for the bridge at Niagara placed all forms of transportation on a single deck. The railway track was in the middle of the deck, sandwiched between carriageways and footpaths on the outer sides.[25] Moreover, trains would not go over the bridge; their cars would be disconnected from the heavy locomotives and pulled across the bridge by horses, cables, or lighter 6-short-ton (5.4 t) engines.[26] Before the work could begin, Ellet faced the problem of all suspension bridge construction: getting a line across the gap.

Ellet's brainstorming sessions with his men raised several ideas that could enable a line to be suspended across the gorge; these included firing cannon balls with the line attached, towing it across the river with a steamer, and tying it to a rocket that would then be launched across the gorge. Ultimately the bridge engineer chose an idea inspired by Benjamin Franklin's experiment with a kite.[27] It was similar to 15th century inventor Leonardo da Vinci's plan to span a gap.[28] Ellet also took the opportunity to generate publicity for his project. Organizing a kite-flying contest, he offered $5[nb 6] to any boy who flew a kite across the gorge and secured the kite string to the other side.[23] Youths from nearby towns flocked in to participate. Unlike the other boys who flew their kites from the United States side of the gorge, 16-year-old Homan Walsh[nb 7] crossed the river by a ferry upstream and walked to the Canadian side of the bridge site to launch his kite. He almost succeeded on his first attempt; his kite flew across but crashed just short of the shore. After resting several days at a friend's house, Walsh finally got his kite across the gorge and secured its line to a tree.[30]

A basket made of iron bars sit among artefacts, such as plaques, portrait collages, and cannon.
The basket, in which Charles Ellet crossed the Niagara Gorge, is on display at the Buffalo Historical Society.

Charles Ellet and his team tied a heavier line to the kite string and pulled the joined lines across. They pulled successive heavier and stronger lines across until the final bridge cable—78 inch (2.2 cm) thick—was hanging across the gorge. The cable was suspended between two wooden towers 40 feet (12 m) feet tall, and it was attached to an iron basket. Ellet planned to use this system as a basket ferry to shuttle workers and materials across the gorge, saving time that would otherwise have been spent on land and ferry travel.[31] Through media coverage and word-of-mouth, many people knew of Ellet's efforts and flocked to the site to watch the construction. On March 13, 1848, the system was completed, and the team planned to test it by pulling the empty basket across. They hit a snag when the basket kept getting stuck halfway and could not move ahead. Pulling back the basket, Ellet decided to assure the watching crowd that the system was workable. He stepped into the basket, and it moved towards the opposite shore. When Ellet reached the problematic spot, he spotted the issue; the basket's rollers could not pass over a portion of the cable that had been accidentally flattened during the construction.[32] He fixed the problem and proceeded to cross to the Canadian side and back, becoming the first person to cross the gorge.[33] Although the bridge companies had prohibited Ellet from collecting tolls, he charged each person $1.00[nb 8] for the chance to "observe first hand the engineering wonder of bridging the Niagara".[30] On some days, the basket ferry conveyed up to 125 people across the gorge.[34]

Continuing his construction, Ellet built two footbridges and joined them together to form an 8-foot (2.4 m) wide suspension bridge. He intended to use this temporary bridge as a scaffold for the construction of the permanent railway bridge.[36] On July 29, 1848, the bridge builder inaugurated the span in his typical manner; standing in his horse-buggy like a gladiator in his chariot, Ellet sped across the bridge, which had railings for only a third of its length at that time. His stunt garnered further publicity for the bridge, and the toll collected from the span proved lucrative; $5,000 was collected in less than a year since its official opening on August 1, 1848. Disputes arose between the bridge companies and Ellet over their shares of the money, and their relations turned bitter. The companies charged that Ellet was late in his schedule and withheld payment. Ellet retaliated by mounting cannons at the bridge to claim ownership over it. In the end the matter went to court. The bridge companies paid $10,000 to Charles Ellet, and he left the project to work full-time on the Wheeling Suspension Bridge.[37]

The Niagara Suspension Bridge project was in hiatus for three years before the bridge companies engaged another renowned civil engineer, John Augustus Roebling, to complete it. The delay caused Roebling to miss out on the honor of building the first permanent bridge to span the Niagara; Serrell completed the Lewiston Suspension bridge in 1851.[38] Roebling would, however, achieve other honors in building his Niagara Railway Suspension Bridge.[39]

John Augustus Roebling's railway bridge

On the top is a cross-sectional sketch of a river. Spanning the gap is a wire, which is suspended between two posts; the ends of the wire are attached to two devices on the opposing banks. At the bottom-left is a wheel traveling on the wire, and at the bottom-right is the cross-sectional view of the wheel.
Roebling's patent no. 4945 for the method to draw wires across gaps. This device was used to build the Suspension Bridge.

Born in Prussia (later a part of Germany), John Augustus Roebling obtained his first conditional engineering degree (Feldmesserprüfung) at Erfurt in 1824. He attended two semesters of lessons at Berlin's Bauakademie and worked for the Prussian government, constructing military roads.[40] Tired of the bureaucracy, he resigned his position and left for the United States in 1830, arriving with his brother in Philadelphia on August 6, 1831. Instead of continuing an engineering profession, he took up farming for a living. After five years he married a tailor's daughter, and had eight children with her over the next decade. Agrarian work was unsatisfactory to John Roebling, and in 1837, after the death of his brother and the birth of his first child, he returned to engineering.[41]

Roebling first signed on as a surveyor for the Beaver River canal system, launching his career with a string of canal and railroad projects.[42] Aside from writing articles in engineering journals, Roebling designed his own wire cables[43] and started his own company to manufacture them; the John A. Roebling Company was the first wire rope manufacturer in the United States.[44] Gradually gaining fame for his civil engineering,[45] Roebling finally got to build suspension bridges.[43] His first bridge was the Allegheny Suspension Aqueduct in Pittsburgh. The structure, completed in 1845, was the first suspension aqueduct in the world and the first large American suspension bridge that had multiple spans. Furthermore, it was the first suspension structure built with modern cable spinning techniques—Roebling's own invention.[46] Earlier bridge building techniques involved fabricating the main cables at a factory, transporting them to the bridge site, and then stretching the heavy cables over the gap to erect them over the bridge. Roebling, during his experiments with wire ropes, conceived and patented a new construction method for these main cables. A long line—the traveler rope—formed a loop around two horizontal wheels, one on each side of the gorge. A lightweight wheel, "the traveling wheel", was attached to this line, and a wire threaded around this wheel. Like a belt in a mechanical system, the traveler rope and its wheel moved across the gap as the horizontal wheels turned, pulling the wire along. The traveling wheel effectively hauled two lengths of the same wire (running above and under the traveling wheel) across the gap at a time. The lengths of wire were collected and bound at intervals to form thicker strands, which were later compressed together into the main cables.[47] which supported themselves and later the proportional weight of the bridge as they were formed.[48] The method became the standard for suspension bridge construction, and remained unchanged for many years. In the 20th century, suspension bridges were still built with this pulley winding system, albeit with more sophisticated equipment.[49]

A man in a suit and bowtie looks to the front. His hairline has receded to the top of his head and he sports a short beard and mustache.
John Augustus Roebling built several prominent suspension bridges in the United States, earning him the esteem of the engineering community.

John Roebling was a contrasting character to Charles Ellet. Whereas Ellet embellished his proposals with fanciful words and deeds, Roebling presented papers filled with meticulous calculations and drawings.[33] The elder engineer was stern and driven to achieve, taking a scientific approach to all interests.[46] Rarely did he show emotions in his dealings, even to his closest associates.[50] The man, however, dared to confront his detractors and make bold exaltations about his work. He openly called European suspension bridges—including American suspension bridges built with European techniques—weak, and occasionally sniped at Ellet's and Stephenson's works.[51][52] He announced that his Brooklyn Bridge, when completed, "will not only be the greatest bridge in existence, but it will be the greatest engineering work of this continent, and of the age."[39] Roebling's history with Ellet started before the bidding for the Niagara Suspension Bridge, early in their careers. During the bidding for the Schuylkill Suspension Bridge project, Ellet had written a proposal that was published in the American Railroad Journal. Mistakenly believing Ellet had won the contract, Roebling wrote to offer his congratulations and requested to be Ellet's assistant. He received a formal reply without any reference to his request, and his subsequent letter was ignored.[23] When Roebling learned that a contractor had won the bid, he successfully applied to be the contractor's chief engineer. Ellet, however, persisted with his tactics and snatched the project away from the contractor; he promoted himself to the bridge company and offered to accept land instead of cash as payment. From then on, Ellet and Roebling became rivals, vying with each other for suspension bridge projects in North America. Roebling learned from their rivalry. His losses to Ellet showed him that he needed to promote himself and gain backers to effectively secure the contracts he desired.[53]

When Roebling was called to the Niagara Suspension Bridge project in 1851, he had six suspension structures to his name.[54] He found Ellet's final plan to be impractical; the bridge would have been too heavy and expensive.[55] Roebling had another design in mind: the double-deck bridge he had proposed earlier during the bidding.[nb 9] The lower deck, level with the edge of the chasm, would convey passengers and carriages, and the upper deck, 18 feet (5.5 m) above, would allow fully laden trains to continue their journeys non-stop,[57] albeit at a speed of 5 miles per hour (8.0 km/h). Roebling reasoned that the decks and sufficient trusses would form a rigid tube, making the bridge stiffer than a normal suspension bridge. The theory was similar to that of the tubular bridge but implemented at a lower cost.[58] The engineering community was critical of Roebling's project. Robert Stephenson, builder of the tubular Britannia Bridge, was among those short-listed to complete the Niagara Suspension Bridge before Roebling's selection. Stephenson had submitted a design for a tubular bridge, and in 1859 he built a large and expensive tubular bridge for the Grand Trunk Railway at Montreal, Quebec. The bridge builder then said in derision of Roebling's suspension railway, "If your bridge succeeds, mine is a magnificent blunder."[59]

In the face of criticism, Roebling completed the project in four years, using Ellet's bridge as scaffolding. The railway deck was stress-tested by the crossing of the 23-short-ton (21 t) steam engine London at a speed of 8 miles per hour (13 km/h) on March 8, 1855.[30] Ten days later the upper deck of the bridge was officially opened;[60] the lower deck had been opened to the public a year earlier.[26] As the first commercial passenger train trundled over the bridge, the two countries were finally connected by railroad across the Niagara River. The successful crossings of these and later trains made Roebling's Suspension Bridge the first working suspension railway bridge in history.[39][nb 10]

Engineering

Roebling's bridge was supported by two limestone towers on each side of the gorge. These Egyptian-style towers[62] stood 88 feet (27 m) tall on the American shore and 78 feet (24 m) tall on the Canadian shore.[63] With their foundations 28 feet (8.5 m) in the earth, the limestone structures could support up to 12 million pounds (5.4 million kg).[56] Four 10.5-inch (27 cm) thick main cables held up the bridge; two cables ran through iron saddles at the top of each tower. Each cable comprised 3,059 wires that were spun with Roebling's patented technique used in his Allegheny Suspension Aqueduct. The ends of each cable were secured to 6-square-foot (0.56 m2) cast-iron plates sunk 20–30 feet (6.1–9.1 m) deep in the bedrock.[64] Support lines hung down from iron clamps that encircled the main cables, and held up the decks. Deep trusses—never before seen on a large suspension bridge[nb 11]—lined the sides of the bridge, and joined the two decks so that the structure looked like a cage.<[66] The trussed sides and the upper and lower decks, which spanned 825 feet (251 m),[nb 12] formed a "hollow straight beam", reinforcing the rigidity of the bridge.[55]

The Suspension Bridge was further stiffened by guy-wires which ran from its upper deck to the top of its towers. Criticism of suspension bridges was growing after the Wheeling Suspension Bridge collapsed under strong winds in 1854. To address these concerns, Roebling added more guy-wires to secure the lower deck to the shores below.[62] Roebling's efforts ensured that his Suspension Bridge remained standing while other suspension bridges across the Niagara River collapsed because of strong winds.[nb 13] Although he was not the first engineer to appreciate the need for a suspension bridge to be sufficiently rigid or to implement the methods to do so, Roebling was the first to understand the principles behind the methods and combine them in the building of a suspension bridge.[56] Roebling proved that despite popular opinion, properly built suspension bridges can safely support the passage of heavy railway traffic. The engineer's combination of stiffening methods created the first modern suspension bridge.[68] Such was the rigidity of the Suspension Bridge that it withstood the shockwave caused by the nearby fall of a 5,000-short-ton (4,500 t) mass of rock in 1863; the force of the impact manifested itself as a wave, rippling through the decks of the bridge from the American side to the Canadian side and back.[69]

Three railway lines merge into one, crossing a bridge. A train engine has crossed the bridge and is moving into the left-most line.
The Suspension Bridge used combinations of four rails to serve three different railroads.

From the United States, the New York and Erie Rail Road's Canandaigua and Niagara Falls Railroad and New York Central Railroad's Buffalo and Niagara Falls Railroad crossed over the bridge and reached into Ontario. Similarly, the Great Western Railway in Canada extended its network from Canada into New York. At the time of the bridge's opening, the three railroads were of different gauges: 4 ft 8+12 in (1,435 mm) standard gauge on the New York Central, 66 on the Great Western, and 72 on the Erie.[70] Instead of accommodating three railways side-by-side on a single wide deck, the bridge saved space by overlapping the tracks over each other. This method used only four rails; one pair formed the track for one railway, and the other pair formed another. One rail from each pair would then form the final track.[64] In the first year of the bridge's operation, an average of 30 trains trundled across it each day.[71] Five years later, 45 trains passed over the structure daily.[72]

Roebling mandated that the trains be limited to a maximum speed of 5 miles per hour (8.0 km/h) to ensure absolute safety. He was confident the bridge could handle faster train traffic, but he preferred a safe operation.[73] In his tests the bridge supported a 326-short-ton (296 t) train, bending 10.5 inches (27 cm) under the weight.[74] This was within the maximum load of 450 short tons (410 t) specified in the design of the bridge.[nb 14] The figure was a conservative estimate.[62] The cables and guy-wires could support 7,300 short tons (6,600 t),[64] and travel journalist Alfred J. Pairpoint commented that it was normal to see 1,200-short-ton (1,100 t) trains pass over the bridge without danger.[75] The bridge shook whenever a train trundled over it, although this had no effect on its integrity. When the frequency of passing trains was high, the trembling was noticeable to travelers on the lower deck and proved uncomfortable to some; writer Mark Twain noted, "You drive over to Suspension Bridge and divide your misery between the chances of smashing down two hundred feet into the river below, and the chances of having a railway-train overhead smashing down onto you. Either possibility is discomforting taken by itself, but, mixed together, they amount in the aggregate to positive unhappiness."[38] Despite such commentaries, thousands of people crossed over the bridge safely every day.[64]

A square opening forms the entrance to the bridge's lower level. Vertical wooden supports line the level. Flagstones pave the entrance and a booth stands to the left. A man stands at the booth, another sits in front of the entrance, and another is walking up the stairs on the right.
View of the bridge's lower deck entrance, with a toll booth at left; deep trusses that helped reinforce the bridge's rigidity are visible.

American engineers regard the Suspension Bridge as a major achievement of efficiency. In a fledgling country where resources—material and financial—were limited, they had to make do with whatever was available. This goal was espoused by the American Society of Civil Engineers, which opined, "That is the best engineering, not which makes the most splendid, or even the most perfect work, but that which makes a work that answers the purpose well, at the least cost." Roebling had built a bridge that rivaled grander bridges of leading European nations at a much lower cost.[76] His Suspension Bridge used only one-sixth the material of Stephenson's Brittania Bridge, but was twice as long and had a capacity that exceeded the tubular bridge.[77] Moreover, the expenditure on Roebling's Suspension Bridge was $400,000, whereas a tubular bridge of equivalent length and load-bearing capability would have cost $4 million.[76] Roebling's success established him as the master of suspension bridges. The inclined guy-wires that stretched from the top of towers to the roadway of the Suspension Bridge became the signature of his future works.[78]

Although the Suspension Bridge proved that the suspension system could be safely used to carry railroads, no more suspension railway bridges were built. The outbreak of the American Civil War diverted attention from such civil engineering ventures,[79] and by the time attention was paid to building bridges again, cantilever bridges were in vogue for railway bridges.[80] Regardless, the Suspension Bridge's success made it a model for suspension railway bridges. When the city of Quebec called for a structure to span the St. Lawrence River in 1850, it looked to the Suspension Bridge for inspiration.[81] Seventeen years later, the British journal Engineering called for a suspension railway to bridge the Straits of Messina and also referred to Roebling's bridge.[82] Lastly, Stuart opened his 1871 work on the history of American engineering, Lives and Works of Civil and Military Engineering in America, with an illustration of the bridge.[76]

Legacy

As a border crossing between two large growing countries, the Suspension Bridge had throngs of travelers passing over it. Furthermore, it was the intersection of three major railroads. Coupled with its vicinity to a natural wonder, the Niagara Falls, the bridge brought a lot of railroad traffic into the region once it was opened. The towns at the ends of the bridge benefited greatly from this heavy movement of people and goods. The village of Suspension Bridge, United States, grew quickly within a few years after the opening of the bridge, acquiring shops, factories, and a hotel. Its tourism and commerce soon rivaled the town of Niagara Falls, New York;[83] eventually, the village was merged into the town in 1892. Similarly, Clifton on the Canadian end of the bridge was integrated into the town of Niagara Falls, Ontario.[84] The two Niagara Falls cities boasted commerce that surpassed neighboring settlements. Around the time of its official opening, the bridge was one of the busiest points of trade on the United States–Canadian border, carrying $12 million of transitory goods and $2 million of bonded materials into Canada.[64] To handle the large amount of goods exchanged over the border, the Lewiston customs house—the primary customs for the Niagara region—was relocated to the Niagara Suspension Bridge in 1863.[85][nb 15]

A train crosses the top of the double-deck bridge. In the background is a waterfall.
Advertisement for Great Western Railway travel via the Niagara Falls Suspension Bridge, c. 1876

The bridge's depiction as an engineering marvel and beautiful sight lured many visitors to the Falls. Travelers could, while crossing the bridge, enjoy a view of the Falls enhanced by the sensation of standing 250 feet (76 m) in the air. The Falls, however, proved distant and indistinct to some when there was overcast weather. On the whole, the Suspension Bridge was considered as an attraction that must be seen by visitors to Niagara Falls.<[88] In paintings and prints of the bridge, the Suspension Bridge became the focus, pushing the Falls into the background. Unlike paintings of the Falls that capture the viewer's eye with their majestic views of the natural wonder, pictures of the bridge impressed viewers with the utilitarian design of the structure.[89] By 1897, the inbound trains to Niagara Falls brought 276,900 visitors during the months of May to August.[90] A streetcar system was established in 1882 to handle the increasing cross-border pedestrian traffic. Initially pulled by horses, the trolleys were converted to run on electricity in 1892.[91] The Suspension Bridge was the pride and symbol of the Great Western Railway,[92] which touted it as the "only Route via Niagara Falls & Suspension Bridge".[nb 16]

A woman is crossing on a rope over a river. She wears a wide-brim hat and holds a pole to balance herself while her feet are in buckets. A double-deck bridge, filled with audience on the lower deck, is in the background.
Daredevils such as Maria Spelterini, the only woman to cross the Niagara gorge on a tightrope, performed their stunts to crowds on the shore and the Suspension Bridge.

Travelers on the Suspension Bridge witnessed several death-defying stunts performed across the Niagara Gorge. On June 30, 1859, they saw Charles Blondin's feat of becoming the first man to cross the chasm on a tightrope.[93] In mid-crossing Blondin sat down on the rope and lowered a line to retrieve a drink from the deck of the Maid of the Mist below.[94] In his later tightrope acts at the same spot, the acrobat would perform a different stunt on each occasion. One time he cooked and ate an omelette in mid-crossing; another time he carried his manager Harry Colcord on his back. While giving Colcord a piggyback ride, Blondin stopped five times on the tightrope to rest and recover his strength; each time Colcord gingerly got off Blondin's back and stood on the tightrope, climbing back on after the acrobat had enough rest.[95] Blondin's success inspired other acrobats, such as William Leonard Hunt ("The Great Farini"), Samuel Dixon, Clifford Calverly, and Signorina Maria Spelterini, to emulate and try to surpass his acts at the same spot. The Signorina, the only woman to walk across the Niagara on a tightrope, once crossed while blindfolded and another time with her hands and legs in manacles.[96]

Another group of people in America had their own risky crossings over the Niagara Gorge as they fled over the border into Canada. They were enslaved African-Americans who sought freedom by escaping to a country that declared the liberation of any slave who entered it.[97] The bridge was part of the Underground Railroad, a network of routes designed to smuggle slaves in the United States to freedom in Canada. Before the American Civil War, fleeing slaves had only four main routes into Canada, of which one was crossing the Niagara River.[98] Slaves who escaped along the Niagara route had help from several quarters. The state of New York generally favored granting freedom to slaves; this attitude emboldened African-American workers in Niagara, who frequently helped slaves flee to Canada. Before the Suspension Bridge was completed, fugitives either crossed the raging river on a boat or risked their lives by swimming at calmer points of the river. The Suspension Bridge made escape across the river easier and safer, although there was still risk. To avoid getting caught and sent back to their owners, slaves had to sneak across on foot or hide aboard trains and oxcarts.[99] Antislavery activist Harriet Tubman guided fugitives at night and bribed custom officials to turn a blind eye.[100] As a result, many slaves crossed the Suspension Bridge to freedom before the United States was engulfed in civil war.[101]

When the war ended and the United States turned its focus toward rebuilding, Roebling started building his Brooklyn Bridge. As the monumental task could affect naval navigation, it required state approval, and the government wanted a thorough review of the engineer's credentials; hence, a Bridge Party was organized. Comprising Roebling and his son, as well as their fellow bridge engineers, generals, businessmen, and high society figures, the party toured the country to review four bridges Roebling had built before the civil war.[102] The final item on their itinerary was Roebling's Niagara Suspension Bridge. At the dinner to commemorate the end of the bridge tour, civil war veteran General Henry Warner Slocum gave a toast and called the Suspension Bridge a symbol of inspiration for the United States in its rebuilding efforts. This sentiment was shared by the guests and was expressed at later dinners across the United States.[103] The achievement of building a large suspension bridge over a gorge in the face of overwhelming adversity—constant put-downs by the professional community, American and European—gave the United States a sense of pride. Nationalism rose as the country lauded the bridge. The completion of the bridge that had been deemed impossible by the Western world gave Americans, who had lesser technical accomplishments than Europe at that time, a trophy that stood above any other.[104] The Suspension Bridge became the American symbol to brave the toughest of challenges and do the impossible, pushing their drive for industrialization even harder. Charles W. Woodman specifically drew attention to the Suspension Bridge in his 1865 address to the United States Senate for approval to build a rail system to transport a ship out of the water and up around the Niagara Falls.[76]

Maintenance and replacement

Towers, made of steel beams, hold up the cables that suspend a bridge.
The Suspension Bridge in 1886, after its wooden components had been replaced with steel

Budget concerns forced Roebling to build the Suspension Bridge primarily with wood;[66] the cost of casting the components out of iron and transporting them "[way] out West" was exorbitant.[34] The organic material decayed and rotted because of the moisture present around Niagara Falls. As the industrialization of the United States moved forward rapidly, the introduction of the Bessemer process greatly lowered the cost of the more durable steel and iron.[105] By 1880, the Suspension Bridge's wooden trusses, beams, and flooring were replaced with steel.[106] The wire cables were not replaced; their cores were still in pristine condition. The outer layer of wires in the cables was, however, lightly corroded and had to be replaced.[107] Due to severe deterioration, the limestone towers were replaced in 1886 with steel framed versions.[26] These renovations increased the bridge's strength and helped it handle heavier loads for a few more years.[44]

The weight of trains in North America had greatly increased by the mid-1890s. Larger and more powerful locomotives were required to pull cars that handled an increasing number of passengers and goods; compared to the 23-short-ton (21 t) locomotives crossing the bridge in the 1850s, 170-short-ton (150 t) locomotives were the common engines 40 years later.[90] The weight of these trains exceeded the specifications of the Suspension Bridge, and the bridge companies took the opportunity to review and request the replacement of the bridge. Civil engineer Leffert L. Buck, who had been hired to maintain the Suspension Bridge, was selected to design the replacement bridge. He settled for a bridge of the arch design. At that time, arch bridges were the new models for railway bridges and were more cost-efficient than suspension bridges. Buck built the new bridge around and below the Suspension Bridge, replacing it a piece at a time. His plan allowed bridge traffic—train and pedestrian—to continue without disruption.[80] By August 27, 1897, the last pieces of the Suspension Bridge were dismantled, leaving the Lower Steel Arch Bridge—later renamed the Whirlpool Rapids Bridge—in its stead.[34] On inspection, the cores of the cables that formerly held up the Suspension Bridge were found to be as sound as on the day the bridge was built.[56]

Notes and references

Notes

  1. ^ Merritt was not alone in dreaming of a suspension bridge across the Niagara. Engineers Francis Hall, Charles Ellet, Jr., and Charles B. Stuart had individually spoke about such an idea in the years before the Suspension Bridge was started.[3]
  2. ^ The Horseshoe Falls have receded 3–6 feet (0.9–1.8 metres) per year before the 1950s and are receding at a rate of 1–2 feet (0.3–0.6 metres) per year thereafter. Due to this erosion, it may no longer be visible from the location stated in the article.[11]
  3. ^ According to the Skempton source, the Broughton Suspension Bridge's designer could instead be Thomas Cheek Hewes, a manufacturer who also built bridges.[15]
  4. ^ Stuart and Merritt, at this time, were leading the joint ventures that formed the bridge companies.[10]
  5. ^ All monetary units in this article are of the United States dollar. According to the Bank of Canada, the US$ was used in Canada up to the 1850s and '60s; moreover, the Canadian dollar—during its inception in the 1860s and '70s—was equal in value to the US$.[18]
  6. ^ The prize money was stated to be $5 or $10 among various sources. This article follows the McCullough source.[23]
  7. ^ Similarly, Homan Walsh was either a 10-year-old or 15-year-old boy depending on the source. Bob White, a kite flying enthusiast and authority, found that Walsh's birth was inscribed as March 24, 1831 on his tombstone. This article follows the age as determined from the tombstone.[29]
  8. ^ Although Robinson stated the "toll" as $1.25,[30] this article follows the $1.00 fee stated by Crabtree and Tyrell.[34][35]
  9. ^ A railway bridge with a double-deck design was suggested by civil engineer Squire Whipple during the early planning stage of the project.[56]
  10. ^ Sir Samuel Brown's Stockton Railway Bridge in the United Kingdom was the first suspension bridge designed to carry railway traffic, but it could not support the weight of a locomotive. Hence, it was non-operational as a railway bridge. Built in 1829, the bridge was closed in 1830.[61]
  11. ^ A similar design, proposed by engineer John Trautwine, was exhibited 18 months before the construction of the Suspension Bridge. It was not used in any suspension bridges.[65]
  12. ^ The bridge's span has been given lengths that ranged from 800 to 825 ft by various sources. This article takes the length stated by McCullough.[38]
  13. ^ Serrell's Lewiston Suspension Bridge collapsed in 1864, and Keefer's Falls View Suspension Bridge in 1889.[67]
  14. ^ The difference between "Weight of superstructure" and "Weight of superstructure and maximum loads".[64]
  15. ^ The Niagara customs house was added to the list of National Register of Historic Places in 1973;[86] thirty-five years later, renovation was started to transform the building into a railway station and history museum for the region.[87]
  16. ^ As pictured in the advertisement for the Great Western Railway shown in this article.

References

  1. ^ Grant & Jones 2006, p. 43.
  2. ^ Talman 2000.
  3. ^ Irwin 1996, pp. 32–33; Bianculli 2003, pp. 68–69
  4. ^ Buck & Buck 1898, p. 125.
  5. ^ Merritt 1875, p. 279.
  6. ^ Merritt 1875, p. 313.
  7. ^ Tyrrell 1911, pp. 222–223.
  8. ^ Wilson 1990, pp. 26–27.
  9. ^ Disturnell 1864, p. 121.
  10. ^ a b Irwin 1996, p. 33.
  11. ^ Tesmer & Bastedo 1981, pp. 90, 199.
  12. ^ Irwin 1996, p. 34.
  13. ^ Scott 2001, pp. 2–7.
  14. ^ Scott 2001, p. 3.
  15. ^ Skempton & Chrimes 2002, p. 321.
  16. ^ a b McCullough 2001, p. 73.
  17. ^ Griggs 2006b, p. 81.
  18. ^ Powell 1999.
  19. ^ Griggs 2006a, pp. 51–52.
  20. ^ Griggs 2006a, p. 50.
  21. ^ Trachtenberg 1979, p. 53.
  22. ^ Griggs 2006a, pp. 50–51.
  23. ^ a b c d McCullough 2001, p. 74.
  24. ^ Trachtenberg 1979, pp. 51, 54.
  25. ^ Griggs 2006a, p. 52.
  26. ^ a b c Bianculli 2003, p. 70.
  27. ^ Robertson 1851, p. 73.
  28. ^ MacKenzie 2003.
  29. ^ White 2010.
  30. ^ a b c d Robinson 2005.
  31. ^ Kostoff 2008, p. 117.
  32. ^ Kostoff 2008, p. 119.
  33. ^ a b McCullough 2001, p. 75.
  34. ^ a b c d Crabtree 1901, p. 360.
  35. ^ Tyrrell 1911, p. 223.
  36. ^ Irwin 1996, p. 36.
  37. ^ Griggs 2006a, p. 52; McCullough 2001, p. 75
  38. ^ a b c McCullough 2001, p. 69.
  39. ^ a b c Reier 2000, p. 11.
  40. ^ Roebling 2008, p. 8.
  41. ^ Griggs 2006b, p. 79.
  42. ^ Roebling 2008, p. 37.
  43. ^ a b Griggs 2006b, p. 80.
  44. ^ a b Troyano 2003, p. 567.
  45. ^ Reier 2000, p. 13.
  46. ^ a b Scott 2001, p. 8.
  47. ^ McCullough 2001, pp. 63, 377–381.
  48. ^ Troyano 2003, p. 251.
  49. ^ Carson 2005.
  50. ^ McCullough 2001, pp. 36–37.
  51. ^ Scott 2001, pp. 9–10.
  52. ^ Billington 1985, pp. 76–77.
  53. ^ Trachtenberg 1979, pp. 51, 54–55.
  54. ^ Buck & Buck 1898, p. 126.
  55. ^ a b Bianculli 2003, p. 69.
  56. ^ a b c d Bianculli 2003, p. 71.
  57. ^ Holley 1883, p. 138.
  58. ^ Billington 1985, p. 77.
  59. ^ Irwin 1996, pp. 37, 40, 51.
  60. ^ Roebling 1860, p. 3.
  61. ^ Skempton & Chrimes 2002, p. 87.
  62. ^ a b c Irwin 1996, p. 39.
  63. ^ Disturnell 1864, p. 124.
  64. ^ a b c d e f Ryerson & Hodgins 1854, p. 146.
  65. ^ Tyrrell 1911, p. 225.
  66. ^ a b Irwin 1996, p. 40.
  67. ^ Scott 2001, p. 10.
  68. ^ McCullough 2001, p. 72.
  69. ^ Holley 1883, pp. 141–142.
  70. ^ Baer 2005, p. 4.
  71. ^ Roebling 1855, p. 3.
  72. ^ Scott 2001, p. 9.
  73. ^ Roebling 1860, p. 5.
  74. ^ Roebling 1855, p. 11.
  75. ^ Pairpoint 1857, p. 112.
  76. ^ a b c d Irwin 1996, p. 49.
  77. ^ McCullough 2001, pp. 79–80.
  78. ^ Trachtenberg 1979, pp. 55–56.
  79. ^ Nye 1996, p. 79.
  80. ^ a b Griggs 2006b, p. 82.
  81. ^ Middleton 2001, pp. 8–9.
  82. ^ Scott 2001, p. 322.
  83. ^ Irwin 1996, p. 50.
  84. ^ Dubinsky 1999, p. 109.
  85. ^ Brightly 1869, p. 468.
  86. ^ National Park Service 2004.
  87. ^ Gee 2008.
  88. ^ Irwin 1996, pp. 36, 42–43.
  89. ^ Irwin 1996, p. 46.
  90. ^ a b Irwin 1996, p. 55.
  91. ^ Dumych 1996, p. 97.
  92. ^ Irwin 1996, p. 60.
  93. ^ Wilson 1990, p. 35.
  94. ^ Wilson 1990, p. 39.
  95. ^ Strand 2008, pp. 105–107.
  96. ^ Dumych 1996, pp. 91–93.
  97. ^ Switala 2006, p. 20.
  98. ^ Strand 2008, p. 112.
  99. ^ Strand 2008, pp. 114–115, 128.
  100. ^ Strand 2008, p. 114.
  101. ^ Switala 2006, pp. 130–131.
  102. ^ McCullough 2001, pp. 34–36.
  103. ^ McCullough 2001, pp. 80–81.
  104. ^ Irwin 1996, p. 31.
  105. ^ Irwin 1996, p. 53.
  106. ^ Tyrrell 1911, p. 226.
  107. ^ Buck 1880, pp. 11–14.

Bibliography

Primary sources

  • Buck, Leffert (December 13, 1880). "Report on the Renewal of Niagara Suspension Bridge". New York, United States: C. W. Ames & Co. Retrieved July 3, 2008. {{cite journal}}: Cite journal requires |journal= (help); Invalid |ref=harv (help)
  • Buck, Richard; Buck, Leffert (December 20, 1898). "The Niagara Railway Arch: With Discussion". Self-published. Retrieved July 3, 2008. {{cite journal}}: Cite journal requires |journal= (help); Invalid |ref=harv (help)
  • National Park Service (2004). "New York—Niagara County". Washington, D.C., United States: National Register of Historic Places. Retrieved September 26, 2008.{{cite web}}: CS1 maint: ref duplicates default (link)
  • Roebling, John (May 1, 1855). "Final Report of John A. Roebling, Civil Engineer, to the Presidents and Directors of the Niagara Falls Suspension and Niagara Falls International Bridge Companies". New York, United States: Steam Press of Les, Mann & Co. Retrieved July 3, 2008. {{cite journal}}: Cite journal requires |journal= (help); Invalid |ref=harv (help)
  • Roebling, John (August 1, 1860). "Report of John A. Roebling, Civil Engineer, to the Presidents and Directors of the Niagara Falls Suspension and Niagara Falls International Bridge Companies, on the Condition of the Niagara Railway Suspension Bridge". New York, United States: Murphy and Bechtel. Retrieved July 3, 2008. {{cite journal}}: Cite journal requires |journal= (help); Invalid |ref=harv (help)

Secondary sources