Rail transport in Northamptonshire: Difference between revisions
Appearance
Content deleted Content added
m DimensionalFusion moved page Draft:Railways in Northamptonshire to Draft:Rail transport in Northamptonshire: WP:CONSISTENT |
Change |
||
Line 1: | Line 1: | ||
{{AfC submission|t||ts=20240701125440|u=DimensionalFusion|ns=118|demo=}} |
{{AfC submission|t||ts=20240701125440|u=DimensionalFusion|ns=118|demo=}} |
||
The '''railway system |
The '''railway system in Northamptonshire''' contains within it main lines, branch lines, former lines, and heritage railways. |
||
== History == |
== History == |
Revision as of 11:15, 27 July 2024
This article, Rail transport in Northamptonshire, has recently been created via the Articles for creation process. Please check to see if the reviewer has accidentally left this template after accepting the draft and take appropriate action as necessary.
Reviewer tools: Inform author |
The railway system in Northamptonshire contains within it main lines, branch lines, former lines, and heritage railways.
History
Current operations
Northamptonshire currently has six railway stations: Northampton, Kettering, Corby, Wellingborough, Kings Sutton, and Long Buckby.
Future operations
High Speed 2 will pass through the south of the county,[1][2] however no stations will serve the new line.
References
- ^ "HS2 Phase One plan and profile maps: index and key plans". GOV.UK. 2019-03-01. Retrieved 2024-07-26.
- ^ "HS2 in Northamptonshire". HS2. Retrieved 2024-07-26.