Jump to content

Kenmore station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
387mqr (talk | contribs)
m changed "Emerald Necklace" overflowed to "Muddy River" overflowed
Line 36: Line 36:


==Incidents and accidents==
==Incidents and accidents==
The station was closed for two months in 1996, after the [[Muddy River|Emerald Necklace]] overflowed it banks, completely submerging the platform and some of the mezzanine.<ref name="MBTA Flood">{{cite news | author = Julie Masis | url =http://www.boston.com/news/local/articles/2007/08/26/rivers_revival_is_more_than_a_pipe_dream/ | title = River's revival is more than a pipe dream | publisher = [[The Boston Globe]]| accessdate = 2007-08-29}}</ref><ref name="MBTA Flood 2">{{cite web |url=http://members.aol.com/netransit8/flood/flood.html |title=The Green Line Flood of 1996 |accessdate=2007-08-29 |author=Scott Moore |coauthors=George Chiasson, Jonathan Belcher |format=HTML |work=NETransit}}</ref>
The station was closed for two months in 1996, after the [[Muddy River|Muddy River]] overflowed it banks, completely submerging the platform and some of the mezzanine.<ref name="MBTA Flood">{{cite news | author = Julie Masis | url =http://www.boston.com/news/local/articles/2007/08/26/rivers_revival_is_more_than_a_pipe_dream/ | title = River's revival is more than a pipe dream | publisher = [[The Boston Globe]]| accessdate = 2007-08-29}}</ref><ref name="MBTA Flood 2">{{cite web |url=http://members.aol.com/netransit8/flood/flood.html |title=The Green Line Flood of 1996 |accessdate=2007-08-29 |author=Scott Moore |coauthors=George Chiasson, Jonathan Belcher |format=HTML |work=NETransit}}</ref>


==Fares==
==Fares==

Revision as of 21:49, 28 February 2008

Template:Future

Kenmore
Entrance to Kenmore Station
General information
Location500 Commonwealth Avenue @ One Brookline Avenue, Boston
Owned byMassachusetts Bay Transportation Authority
Line(s)
  Green Line "B," "C," and "D" branch
Construction
Bicycle facilitieseight spaces
History
OpenedOctober 23, 1932
Passengers
19971.978 million Steady 0%
Services
Preceding station   MBTA   Following station
Template:MBTA lines
"B" Branch
Template:MBTA lines
"D" Branch
Template:MBTA lines
"C" Branch

Kenmore (also known as Kenmore Square) is an dual-island platform rapid transit station in the Kenmore Square area of Boston, Massachusetts. The station, owned and managed by the Massachusetts Bay Transportation Authority, lies on the Green Line's "B," "C," and "D" branches. It is located at the intersection of four major road and rail transport arteries: Commonwealth, Beacon, and Brookline Avenues, and Boylston Street.[1] The station is five stops and a twelve minute journey from Park Street, the hub of the Green and Red Lines.

Services

The station serves as the branching off point for the B, C, and D trains on the Green Line. While all trains follow the same route going inbound (with the exception of the E train which doesn't join the others until Copley Square), going outbound they split at Kenmore branching off into different above-ground routes.

Nearby attractions

Kenmore station is the primary station for passengers wishing to go to Fenway Park, located just one block away. However, many travel to Fenway station despite its longer distance from the stadium.

Incidents and accidents

The station was closed for two months in 1996, after the Muddy River overflowed it banks, completely submerging the platform and some of the mezzanine.[2][3]

Fares

Until January 1, 2007, Kenmore was the last Green Line station heading outbound where passengers were required to pay a fare upon boarding, as boarding outbound trains at surface stops was free. Passengers now pay fares at surface stops regardless of whether they are going inbound or outbound. It was for this reason that fans going home from the game to the Newton Highlands region (serviced by the D) were advised to use the 'Fenway' stop.

2005-2009 accessibility improvements

The architect and urban designer for the project is DiMella Shaffer, Boston, MA.[4]

Since 2005, Kenmore has been undergoing re-construction in order to meet ADA accessibility requirements. Despite the almost constant work, the station has remained open. Major works include raised platforms for level boarding with Green Line trains,[4] elevators and escalators, [4], a new bus shelter with a transparent semi-arched canopy,[4] and a new glass canpoy will be placed in the middle of the intersection. The Boston Globe reported that there were severe delays in construction and that the construction would be completed by November 2007;[5] work is still ongoing in 2008.

Bus connections

References

  1. ^ Kenmore station map Google Maps Retrieved 2008-02-02
  2. ^ Julie Masis. "River's revival is more than a pipe dream". The Boston Globe. Retrieved 2007-08-29.
  3. ^ Scott Moore. "The Green Line Flood of 1996" (HTML). NETransit. Retrieved 2007-08-29. {{cite web}}: Unknown parameter |coauthors= ignored (|author= suggested) (help)
  4. ^ a b c d Kenmore Station MBTA-T Projects Retrieved 2008-02-03
  5. ^ Mac Daniel. "Kenmore T work now in extra innings". The Boston Globe. Retrieved 2007-04-17.