←Created page with '==Origin of Flicker== The voltage of public power networks is changing over time. The source of this is the voltage drop generated over the source impedance of the…' Tag: possible conflict of interest |
No edit summary |
||
Line 29: | Line 29: | ||
* Flicker is generated by load changes. Only the amplitude of the load change is relevant, not the absolute value. |
* Flicker is generated by load changes. Only the amplitude of the load change is relevant, not the absolute value. |
||
* A reduction in Pst can only be attained through: |
* A reduction in Pst can only be attained through: |
||
** less load changes n |
|||
** smaller load changes dP |
|||
** soft (F < 1) instead of hard (F = 1) load changes (e.g. by the help of power electronics) |
|||
* The relationship between amplitude of load changes and Pst is linear, i.e. halving the switched load results in half the Pst |
* The relationship between amplitude of load changes and Pst is linear, i.e. halving the switched load results in half the Pst |
||
* The relationship between number of load changes per time (n/ Tp) and Pst is non-linear. A halving of load changes reduces Pst by only about 20%. In order to have half the Pst, the number of load changes must be reduced by a factor of 9! |
* The relationship between number of load changes per time (n/ Tp) and Pst is non-linear. A halving of load changes reduces Pst by only about 20%. In order to have half the Pst, the number of load changes must be reduced by a factor of 9! |
Revision as of 07:14, 12 June 2009
Origin of Flicker
The voltage of public power networks is changing over time. The source of this is the voltage drop generated over the source impedance of the grid by the changing load current of an equipment or facility.
These fluctuations in time generate flicker, i.e. changes in the luminous flux of a lamp or illuminant. The effects of flicker can range from disturbance to epileptic attacks of photosensitive persons.
Measurement of Flicker
The requirements of a flicker measurement equipment are defined in the standard IEC 61000-4-15. The flicker meter is subdivided in several function blocks which simulate a 230 V/60 W incandescent lamp (reference lamp) an the human perception system (eye-brain model). From the resulting momentary value of flicker the short term flicker value Pst is generated in the last block according to a statistic process over a predefined observation interval. Long term flicker Plt is calculated as the cubic average of several Pst values. In the standard IEC 61000-3-3 the observation intervals and the limiting values for Pst and Plt are specified:
Value | Observation Interval | Limiting Value |
---|---|---|
Pst | 10 min | 1.0 |
Plt | 2 h | 0.65 |
Operating Condition of the EUT
The flicker standard states that the EUT (Equipment Under Test) has to be operated during the test in a way which is the worst case state with respect to flicker. If the EUT is operated in a (relatively) constant fashion during the whole test, Plt = Pst will result. If this state is is feasible and realistic this means Pst has to fulfill the limits for Plt (which are lower!) Estimation A purely analytical calculation of Pst is almost impossible. In the standard there are formulas which allow the estimation of the Pst values to be expected.
Flicker Facts
- Flicker is generated by load changes. Only the amplitude of the load change is relevant, not the absolute value.
- A reduction in Pst can only be attained through:
- less load changes n
- smaller load changes dP
- soft (F < 1) instead of hard (F = 1) load changes (e.g. by the help of power electronics)
- The relationship between amplitude of load changes and Pst is linear, i.e. halving the switched load results in half the Pst
- The relationship between number of load changes per time (n/ Tp) and Pst is non-linear. A halving of load changes reduces Pst by only about 20%. In order to have half the Pst, the number of load changes must be reduced by a factor of 9!
References
- IEC 61000-4-15, Testing and measurement techniques – Flickermeter – Functional and design specifications, Edition 1.1, 2003-03
- IEC 61000-3-3, Limits – Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤16 A per phase and not subject to conditional connection, Edition 2.0, 2008-06
- Wilhelm Mombauer: "Messung von Spannungsschwankungen und Flickern mit dem IEC-Flickermeter", ISBN 3-8007-2525-8, VDE-Verlag