Jump to content

ECN: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Grj23 (talk | contribs)
m Merged Engineering Change Notice to Engineering Change Order. Fixed Double Redirect
Line 6: Line 6:
* [[Encoding Control Notation]], a standard notation that allows the specification of custom encoding rules for ASN.1 types
* [[Encoding Control Notation]], a standard notation that allows the specification of custom encoding rules for ASN.1 types
* [[Energy Research Centre of the Netherlands]] (Energieonderzoek Centrum Nederland)
* [[Energy Research Centre of the Netherlands]] (Energieonderzoek Centrum Nederland)
* [[Engineering Change Notice]], a form that records the details of an engineering change
* [[Engineering Change Order|Engineering Change Notice]], a form that records the details of an engineering change
* [[Contingent Convertible Bond|Enhanced Capital Note]], a debt instrument convertible into equity given certain trigger conditions
* [[Contingent Convertible Bond|Enhanced Capital Note]], a debt instrument convertible into equity given certain trigger conditions
* [[Environmental Change Network]], a UK system for monitoring long-term environmental change
* [[Environmental Change Network]], a UK system for monitoring long-term environmental change

Revision as of 21:25, 27 March 2018

ECN may refer to: