Matiltan Hydropower Project

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Chongkian (talk | contribs) at 12:43, 8 October 2023 (add other stub tag per WP:STUBTAGS). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Matiltan Hydropower Project is a proposed run-of-the-river hydro-power generation project which is located in the Gorkin Matiltan region of Kalam valley, District Swat, Khyber Pakhtunkhwa province of Pakistan, on the left tributary of Suvastu River. The power station has a planned generating capacity of 84 MW.[1][2]

Construction[edit]

In October 2020, the project was estimated to be 47 percent complete. The project has faced obstructive tactics from various government factions in an attempt to delay the project. [3]

References[edit]

  1. ^ "84 MW GORKIN-MATILTAN HYDROPOWER PROJECT". Barqaab. 2012-04-17. Retrieved 2022-09-04.
  2. ^ "Energy & Power". www.kpkep.gov.pk. Archived from the original on 2015-05-26.
  3. ^ Report, Bureau (2020-10-11). "CM orders timely completion of hydropower projects". DAWN.COM. Retrieved 2021-10-07.