Jump to content

Limbongan–Klebang Highway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ong Kai Jin (talk | contribs) at 16:26, 28 March 2024 (Created page with '{{Infobox road | country = MYS | state = Malacca | type = M | length_km = 5.7 | length_ref = <ref name=":1" /> }} '''Limbongan–Klebang Highway''' is a major road in Malacca, Malaysia. == Background == The highway is part of the Malacca Coastal Highway as the second phase.<ref name=":0">{{Cite news |date=2016-05-06 |title=纾解柠檬眼与吉里望交通 次阶沿海大道年杪通车 |language=zh-MY |url=https://www.enanyang.my/%E5%9C%B0%E6...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Melaka Route {{{route}}}
Route information
Length5.7 km[1] (3.5 mi)
Location
CountryMalaysia
Highway system

Limbongan–Klebang Highway is a major road in Malacca, Malaysia.

Background

The highway is part of the Malacca Coastal Highway as the second phase.[2]

On 23 July 2022, the parliament member of Kota Melaka, Khoo Poay Tiong, and state assembly member of Kota Laksamana, Low Chee Leong, demanded explanation from the Malacca state government over the no progress of last kilometer of the road for seven years. In 2015, the Chief Minister of Malacca at the time gave the developer the land title before the developer build the road.[3]

History

On 5 January 2012, the groundbreaking of the project was officiated by Chief Minister of Malacca, Mohd Ali Rustam. He said that the project costs 50 million ringgit and will be beared by private sector.[1]

On 16 April 2015, the construction of the bridge which crosses the Klebang River was started. The bridge costed around 20 million ringgit.[2]

On 17 July 2015, the road was opened access for vehicles, but it was placed with few warning signs that mentioned driver's own risks for accidents on this road. On 20 July 2015, the state assembly member of Bachang pointed out that the road has not been commissioned and has not been transferred to the local government, the insurance companies has the right to not compensate the drivers for accidents on the road. On his visit, at the entrance from 1Malaysia Square roundabout, there was a warning sign which mentioned it is a private road and the developer is not responsible for accidents. He pointed out he road was not listed in the Malaysian Public Works Department's roads blueprint.[4][5]

References

  1. ^ a b "Projek Lebuhraya Limbongan-Klebang Atasi Kesesakan Di Melaka". mStar. 2012-01-05. Retrieved 2024-03-18.
  2. ^ a b "纾解柠檬眼与吉里望交通 次阶沿海大道年杪通车". 南洋商报 [Nanyang Siang Pau] (in Chinese (Malaysia)). 2016-05-06. Retrieved 2024-01-25.
  3. ^ "沿海替代公路讲了7年 最后一公里何时建?". 中國報 [China Press] (in Chinese (Malaysia)). 2022-07-23. Retrieved 2024-01-10.
  4. ^ "通往柠檬眼 道路通车未宪报". 东方日报 [Oriental Daily News (Malaysia)] (in Chinese (Malaysia)). 2015-07-20. Retrieved 2024-01-25.
  5. ^ ""小沙漠"未宪报 有意外保险不赔". 东方日报 [Oriental Daily News (Malaysia)] (in Chinese (Malaysia)). 2016-01-21. Retrieved 2024-02-23.