Jump to content

Indore Bus Rapid Transit System

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by AdarshJain2 (talk | contribs) at 11:39, 19 December 2009. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Indore BRTS
Overview
LocaleIndore, India
Transit typeRapid transit
Number of lines10
Operation
Operator(s)Government of Madhya Pradesh
Indore Municipal Corporation
Indore City Transport Services Limited
Technical
System lengthTemplate:Km to mi

The Indore Bus Rapid Transit System (BRTS) is the bus transit system proposed for the city of Indore, Madhya Pradesh by ICTSL.

Corridors

The following corridors were proposed to be executed under JNNURM.[1]

Corridor 1: AB. Road [23.8 km]
Corridor 2: Eastern Ring Road [23.65 km]
Corridor 3: M.R. 10 Corridor [8.71 km]
Corridor 4: River Side Road Corridor [14.5 km]
Corridor 5: Western Ring Road [15.9 km]
Corridor 6: Badaganpti — Airport [5.3 km]
Corridor 7: RW2 Ujjain Road — Airport [9.5 km]
Other Corridors: M.G Road, RNT Road and YN Road [together 19.1 km]

Project Status

23 June 2009 :

  • Six consultants have been shortlisted for Phase-I of BRTS.[2]

References