Indore Bus Rapid Transit System
Appearance
Indore BRTS | |
---|---|
Overview | |
Locale | Indore, India |
Transit type | Rapid transit |
Number of lines | 10 |
Operation | |
Operator(s) | Government of Madhya Pradesh Indore Municipal Corporation Indore City Transport Services Limited |
Technical | |
System length | Template:Km to mi |
The Indore Bus Rapid Transit System (BRTS) is the bus transit system proposed for the city of Indore, Madhya Pradesh by ICTSL.
Corridors
The following corridors were proposed to be executed under JNNURM.[1]
Corridor 1: AB. Road [23.8 km]
Corridor 2: Eastern Ring Road [23.65 km]
Corridor 3: M.R. 10 Corridor [8.71 km]
Corridor 4: River Side Road Corridor [14.5 km]
Corridor 5: Western Ring Road [15.9 km]
Corridor 6: Badaganpti — Airport [5.3 km]
Corridor 7: RW2 Ujjain Road — Airport [9.5 km]
Other Corridors: M.G Road, RNT Road and YN Road [together 19.1 km]
Project Status
23 June 2009 :
- Six consultants have been shortlisted for Phase-I of BRTS.[2]