Rail lengths
It has been suggested that this article be merged with Track (rail transport). (Discuss) Proposed since December 2017. |
This article is missing information about Error: you must specify what information is missing..(October 2011) |
The rails used in rail transport are produced in sections of fixed length. Rail lengths are made as long as possible, as the joints between rails are a source of weakness. Throughout the history of rail production, lengths have increased as manufacturing processes have improved.
Timeline
The following are lengths of single sections produced by steel mills, without any thermite welding. Shorter rails may be welded with flashbutt welding, but the following rail lengths are unwelded.
- (1825) 15 feet (4.57 m) Stockton and Darlington Railway 5.6 lb/yd (2.78 kg/m)
- (1830) 15 feet (4.57 m) Liverpool and Manchester Railway
- fish-belly rails at 35 lb/yd (17.4 kg/m), laid mostly on stone blocks.
- (1880) 39 feet (11.89 m) United States to suit 40-foot (12.19 m) long gondola waggons
- (1950) 60 feet (18.29 m) British Rail
- (1953) 45 feet (13.72 m) Australia [1]
- (1900) 71 ft (21.6 m) - steel works weighing machine for rails (Steelyard balance)[2]
- (1940s) 78 feet (23.77 m) US [3]
Welding of rails into longer lengths was first introduced around 1893, making train rides quieter and safer.[4]
- (1895) Hans Goldschmidt developed Thermit welding[4]
- (1935) Charles Cadwell, non-ferrous Thermit welding
- (1950) 240 ft (73.2 m) welded - (4 x 60 feet or 18.3 metres) [5]
Modern production techniques allowed the production of longer unwelded segments.
- (2011) 120 metres (393.7 ft) Voestalpine, [6]
- (2011) 121 metres (397.0 ft) Jindal [7]
- (2013) 108 metres (354.3 ft) Tata Steel Europe [8]
Multiples
Newer longer rails tend to be made as simple multiples of older shorter rails, so that old rails can be replaced without cutting. Some cutting would be needed as slightly longer rails are needed on the outside of sharp curves compared to the rails on the inside.
Boltholes
Rails can be supplied pre-drilled with boltholes for fishplates or without where they will be welded into place.
There are usually 2 boltholes or 3 boltholes.
See also
References
- ^ "Surveys Of New Rail Link". The Advertiser. Adelaide, SA. 17 June 1953. p. 5. Retrieved 3 October 2012 – via National Library of Australia.
- ^ "Big Weighing Machines". Australian Town and Country Journal (NSW : 1870 - 1907). NSW. 4 August 1900. p. 19. Retrieved 8 October 2011 – via National Library of Australia.
- ^ McGonigal, Robert (1 May 2014). "Rail". ABC's of Railroading. Trains. Retrieved 10 September 2014.
- ^ a b "Thermit®". Evonik Industries. Evonik Industries AG.
- ^ "Opening Of S.-E. Broad Gauge line". The Advertiser. Adelaide, SA. 2 February 1950. p. 1. Retrieved 8 December 2011 – via National Library of Australia.
- ^ "Ultra-long rails". voestalpine. voestalpine AG. Retrieved 10 September 2014.
- ^ "Rails". Jindal Steel & Power Ltd. Retrieved 10 September 2014.
- ^ "Tata Steel opens French plant to heat treat 108-meter train rail". International Organization on Shape Memory and Superelastic Technologies (SMST). ASM International. 30 October 2014. Retrieved 10 September 2014.