Sheffield and Lincolnshire Junction Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Buidhe (talk | contribs) at 21:57, 13 February 2021 (Disambiguating links to Chesterfield (link changed to Chesterfield, Derbyshire) using DisamAssist.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Sheffield and Lincolnshire Junction Railway
Cutting the first sod of the railway, in 1846
Overview
Dates of operation1846–1847
SuccessorManchester, Sheffield and Lincolnshire Railway
Technical
Track gauge4 ft 8+12 in (1,435 mm)

The Sheffield and Lincolnshire Junction Railway was an early British railway company which opened in 1849 between Sheffield and Gainsborough and Lincoln. It amalgamated with the Sheffield, Ashton-Under-Lyne and Manchester Railway and the Great Grimsby and Sheffield Junction Railway, the three being renamed the Manchester, Sheffield and Lincolnshire Railway in 1847. It is now the Sheffield to Lincoln Line.

Plans

The line originated with a plan in 1836 to connect the SA&MR at Sheffield with the proposed Midland Counties Railway at a time when the latter was planning to run to Chesterfield. This was changed to proposal for Sheffield Union Railway to connect instead with the North Midland Railway at Woodhouse Mill. This plan, in turn, was superseded by one for a connection to Chesterfield. At this point, in 1844, it was suggested that the people of Sheffield would be better served by extending the SA&MR eastwards. This was supported, not only by the SA&MR, but by the councillors of Retford and Worksop.

Authorisation

The line received approval in 1846, along with the Sheffield and Lincolnshire extension, which was the branch to Lincoln, which would run from near Retford. Parliamentary decree meant that the way from Saxilby to Lincoln would be shared with the Great Northern. The latter built this part of the line and shared it with the S&LE with the agreement that it could have running powers from Retford to Sheffield.

Construction

The first board meeting of the amalgamated Manchester, Sheffield and Lincolnshire Railway took place on 6 January 1847. Construction had begun on 15 October 1846[1] with the section between Sheffield and to what was by then the Midland Railway at Beighton. The final link in the line between Sheffield and Gainsborough was completed in 1849 with stations at Kiveton Park, Shireoaks, Worksop, Retford and Sturton.

Officers

  • John Jobson Smith (Chairman)[2]: 271 
  • John Woodcroft (Deputy Chairman)
  • John Hambly Humfrey (Secretary)
  • John Fowler (Engineer)