Dau Giay–Dalat Expressway
This article needs additional citations for verification. (February 2020) |
CT.27 Expressway | |
---|---|
Đường cao tốc %paddedRoute% | |
Dau Giay-Dalat Expressway | |
Route information | |
Length | 124 mi (200 km) |
Existed | 2008–present |
Major junctions | |
South end | at Dau Giay Interchange, Thống Nhất District, Dong Nai |
North end | at Da Lat, Lâm Đồng Province |
Location | |
Country | Vietnam |
Highway system | |
The Dau Giay-Dalat Expressway (Vietnamese: Đường cao tốc Dầu Giây–Đà Lạt) is a partially completed expressway in Vietnam. It will connect Dong Nai Province with Da Lat. It is a four-lane expressway with a maximum speed of 100 km/h,[1] roughly paralleling National Road 20. The road is expected to be a strong stimulus for the development of Vietnam's Central Highlands region.[2]
Development
[edit]The route yet to be built has been divided into three sections by the Ministry of Transport. The investment budget is sourced from a mixture of Build, Operate and Transfer contracts, Japanese development loans from JICA and direct state investment.[1]
- Dau Giay-Tan Phu
Construction of the 59.6 km long section between Dau Giay and Tan Phu is scheduled to begin in 2020 with a total investment of 7,000 billion VND.[3]
- Tan Phu-Bao Loc
The Tan Phu-Bao Loc section is planned at a development cost of 17,000 billion VND.
- Bao Loc-Lien Khuong
This planned section has a total budget of 13,000 billion VND.
- Lien Khuong-Da Lat
The 19.2 km long section between Lien Khuong Airport and Pass Prenn near Da Lat was completed in 2008.[2]
References
[edit]- ^ a b "Cao tốc Dầu Giây - Liên Khương khởi công năm 2019 với nguồn vốn 65.000 tỉ đồng". Báo Thanh Niên. May 6, 2019.
- ^ a b "LỘ TRÌNH XÂY DỰNG TUYẾN ĐƯỜNG CAO TỐC DẦU GIÂY – ĐÀ LẠT". Live Real.
- ^ "Bộ GTVT: Dự án Dầu Giây - Liên Khương đang gặp khó". 31 August 2019.