Gallatin Fossil Plant

Coordinates: 36°18′53″N 86°24′01″W / 36.31472°N 86.40028°W / 36.31472; -86.40028
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Citation bot (talk | contribs) at 05:00, 19 March 2023 (Alter: url. URLs might have been anonymized. | Use this bot. Report bugs. | Suggested by AManWithNoPlan | #UCB_CommandLine). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Gallatin Fossil Plant
Gallatin Fossil Plant
Map
Location of the Gallatin Fossil Plant
CountryUnited States
LocationGallatin, Tennessee
Coordinates36°18′53″N 86°24′01″W / 36.31472°N 86.40028°W / 36.31472; -86.40028
StatusOperational
Commission dateCoal units
Unit 1: 1956
Unit 2: 1957
Units 3–4: 1959
Natural gas units
Units 1-4: 1975
Units 5-8: 2000
Construction costCoal units
$143,377,000[1] (equivalent to $1,231,089,000 in 2023)
OwnerTennessee Valley Authority
OperatorTennessee Valley Authority
Thermal power station
Primary fuelCoal, natural gas
Power generation
Nameplate capacity976 MW (coal)[2]
600 MW (natural gas)[3]

The Gallatin Fossil Plant is a coal and natural gas-fired power plant near Gallatin, Tennessee operated by the Tennessee Valley Authority (TVA). The plant was originally entirely a coal-fired plant, constructed in the 1950s, and natural gas units were added later.

Description

The Gallatin Fossil Plant is located on 1,950 acres of land on the Cumberland River The plant consists of four coal-fired units, with a combined generating capacity of 976 net megawatts (MW).[4] The plant contains four Westinghouse and four GE combustion turbine units, with a combined capacity of 600 MW net, and these units, located adjacent to the coal units, are sometimes referred to separately from the coal units as the Gallatin Combustine Turbine Plant.[3]

History

Gallatin was originally entirely a coal-fired plant. Groundbreaking for the plant occurred on May 11, 1953. Unit one began operation on November 8, 1956, unit two on June 27, 1957, unit three on May 22, 1959, and unit four on August 9, 1959.[4] The first four gas-fired units was added in 1975, and the last four in 2000.[3] Electrostatic precipitators were first installed on the plant in 1970.[1] In 2019, TVA agreed to remove 12 million tons of coal ash at a cost of $640 million during 20 years.[5]

References

  1. ^ a b TVA Gallatin Steam Plant, Knoxville: Tennessee Valley Authority, 1974, retrieved September 1, 2021 – via Google Books
  2. ^ "TVA - Gallatin Fossil Plant". www.tva.gov. Retrieved 2020-01-13.
  3. ^ a b c "Gallatin Combustion Turbine Plant". tva.gov. Tennessee Valley Authority. 2017. Retrieved 2019-02-15.
  4. ^ a b "Gallatin Fossil Plant". tva.gov. Tennessee Valley Authority. 2018. Retrieved 2018-05-29.
  5. ^ Morehouse, Catherine (2019-06-14). "TVA agrees to excavate 12M tons of coal ash after 5-year battle". Utility Dive.