Jump to content

Yuribey Bridge

Coordinates: 68°55′24″N 70°18′35″E / 68.923333°N 70.309722°E / 68.923333; 70.309722
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by UkNicky (talk | contribs) at 08:07, 12 August 2023 (Construction). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bridge over Yuribey
Мост через Юрибей
Coordinates68°55′24″N 70°18′35″E / 68.923333°N 70.309722°E / 68.923333; 70.309722
CarriesObskaya–Bovanenkovo Line
CrossesYuribey River
LocaleYamalo-Nenets Autonomous Okrug
Characteristics
DesignRailroad bridge
Total length3892.9 metres
Width25 metres each bridge
Longest span150 metres
No. of spans2
History
Opened2009
Location
Map

The Yuribey Bridge (Russian: мост через Юрибей) is a 3.9-kilometre long (2.4 mi) railway bridge on the Obskaya–Bovanenkovo Line. It has two main spans of 150 metres (490 ft). The bridge was completed in 2009. It is the longest bridge above the Arctic Circle.

The bridge was constructed by Gazprom in a harsh environment including the need to build on permafrost, which required an innovative approach to the construction technique and bridge design. The bridge has to be much longer than the river width, because on permafrost, the water from melting snow does not sink into the ground, so the spring flows get quite strong.

Construction

In accordance with information provided by the media, the construction of the bridge was successfully accomplished within a remarkably brief timeframe of 349 days, an impressive feat considering the complexity and magnitude of such structural endeavors. The completion of this remarkable project was marked in the month of April in the year 2009, and on the momentous date of June 4, 2009, the bridge witnessed its inaugural passage of esteemed individuals, including the distinguished presidential envoy in the Urals Federal District, Nikolai Vinnichenko, the esteemed Governor of Yamal, Jury Neyolov, as well as the accomplished CEO of Gazpromtrans, Vyacheslav Tyurin.

The completion of the bridge was a crucial step in the construction of the railway to the Bovanenkovo and marked the beginning of development at the Bovanenkovo oil and gas condensate field. The bridge itself is made up of 107 standard spans, each measuring 34.2 meters in length, along with 2 through trusses that are 110 meters long. These spans and trusses are supported by 110 bridge arms, which are constructed using metal pipes ranging from 1.2 to 2.4 meters in diameter and filled with reinforced concrete.[1] In order to ensure the stability of the pillars in the permafrost, holes were drilled to depths of 20 to 40 meters. The total weight of the bridge exceeds 30,000 tons and it is designed to have a service life of 100 years.[2]

References

  1. ^ "Bridge Crossing Over Yuribey River Floodplain". www.gazprom.com.
  2. ^ Конструкция моста через Юрибей на Ямале позволит сохранить экосистему реки : ИТАР-ТАСС Урал

68°55′24″N 70°18′35″E / 68.923333°N 70.309722°E / 68.923333; 70.309722

Records
Preceded by
?
Russia’s longest railway bridge
2009 – 2019
Succeeded by