Jump to content

Central Interceptor

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Panamitsu (talk | contribs) at 11:53, 1 September 2023 (top: WP:TOHUTO). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Map
Approximate route

The Central Interceptor is a sewerage infrastructure project in Auckland, New Zealand. The project is being undertaken by Watercare Services and involves boring a 4.5 metres (15 ft) diameter wastewater pipe underneath the Auckland central isthmus, to carry wastewater flows from parts of the city to the Māngere Wastewater Treatment Plant.

The project allows for population growth in Auckland and the resulting increased wastewater demands, and also aims to reduce the amount of wastewater overflows from the older combined wastewater/stormwater systems in western Auckland, which currently, on strong rainfall days, are forced to dump excess water (contaminated by faeces) into the Waitematā Harbour. One typical example was on 27 January 2023, when a water quality alert was issued for 11 Auckland beaches because of wastewater overflows in heavy rain.[1] The new capacity of the central interceptor is expected to reduce these overflows by at least 80%, reducing the times per year that contaminated stormwater is dumped into the harbour from 52 days a year to 10 or fewer days.[2] Sixteen access shafts, up to 65 metres (213 ft) deep, will be constructed.[3]

The new interceptor will be Auckland's largest wastewater project in history, costing approximately $1.2B,[4] and is 13 km long (plus side branches).[2] It is to run from Western Springs to Māngere.[4]

Construction

The construction contract was signed in March 2019 with the Ghella Abergeldie Joint Venture. Construction is expected to be from 2019 to 2024.[2]

Construction will be via tunnel boring machine, and the course will take the tunnel 15 metres (49 ft) underneath the Manukau Harbour, though (due to the height of the central isthmus). In other areas it will be as much as 110 metres (360 ft) below properties.[4]

In May 2021, Watercare reported that the project was 8 months into what was expected to be a 5 year construction period. A 200 metres (660 ft) long tunnel boring machine had been delivered and was being prepared for service. Local school children have gifted a name for the tunnel boring machine: Hiwa-i-te-rangi.[5]

References

  1. ^ "Black alert at 11 Auckland beaches due to wastewater overflows". RNZ. 27 January 2023. Retrieved 27 January 2023.
  2. ^ a b c Tapped In (newsletter). Watercare. Autumn 2019.
  3. ^ Clarke, Jennie (2018). "100 not out". EG (4): 32.
  4. ^ a b c "Central Interceptor: Auckland's new $1.2 billion sewer tunnel to clean up beaches". The New Zealand Herald. 14 March 2019. Retrieved 31 March 2019.
  5. ^ Ternouth, Louise (28 May 2021). "New pipeline to make Auckland's polluted beaches a thing of the past". RNZ. Retrieved 1 June 2021.