Jump to content

Altay–Fuyun–Zhundong railway

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Timothytyy (talk | contribs) at 09:28, 2 September 2023 (Added link). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Altay–Fuyun–Zhundong railway
Overview
StatusOperational
Termini
Service
TypeHeavy rail
History
Opened30 December 2019 (Fuyun to Zhundong North)
6 December 2020 (Altay to Fuyun)
Technical
Line length419 km (260 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed120 km/h (75 mph)

The Altay–Fuyun–Zhundong railway is a single-track passenger and freight railway in China.

At Zhundong, the line meets the Ürümqi–Dzungaria railway. At Altay, it meets the Kuytun–Beitun railway.

History

[edit]

Construction of the railway began in August 2016.[1] The section from Fuyun to Zhundong North opened on 30 December 2019. The remaining 148 kilometres (92 mi) section from Altay to Fuyun opened on 6 December 2020.[2]

References

[edit]
  1. ^ "中铁十局承建新疆阿富准铁路开工建设 - 资讯中心 - 中铁鲁班商务网 - 鲁班电子商务网 -". 2019-10-18. Archived from the original on 2019-10-18. Retrieved 2020-12-07.
  2. ^ "北疆铁路环线全线贯通-贵阳网". www.gywb.cn. Retrieved 2020-12-07.