Jump to content

SSB DT 8

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by John of Reading (talk | contribs) at 10:25, 8 September 2023 (top: Typo fixing, replaced: inlcuding → including). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

SSB DT 8
DT 8 vehicle
DT 8 street running in September 1995
In service1985–present
ManufacturerDuewag (DT8.4–DT8.9)
Siemens/ADtranz (DT8.10)
Bombardier (DT8.11)
Stadler (DT8.12–DT8.15)
Refurbished2007–2017 (DT8.5–DT8.9)
Number in service204 sets (As of 2019)[1]
Number preserved2 cars
Formation2 cars per trainset
Capacity108 seated, 138 standing (DT8.10)[2]
106 seated, 144 standing (DT8.12)[3]
Specifications
Train length38,050 mm (124 ft 10+116 in)[4]
39,110 mm (128 ft 3+34 in) (DT8.12)[5]
Car length18,400 mm (60 ft 4+716 in)[4]
Width2,650 mm (8 ft 8+516 in)[4]
Height3,715 mm (12 ft 2+14 in)[4]
Floor height1,000 mm (39+38 in)[4]
Doors2 pairs per car (per side)
Wheel diameter74 cm (29 in) (new)
66 cm (26 in) (worn)[5]
Maximum speed80 km/h (50 mph)
Steep gradient9%[5]
Power output4 × 222 kW (298 hp)[4]
8 × 130 kW (170 hp) (DT8.12)[5]
Acceleration1.3 m/s/s (2.9 mph/s)
Deceleration1.3 m/s/s (2.9 mph/s)
Electric system(s)750 V DC overhead catenary
Current collector(s)Pantograph
Minimum turning radius50 m (160 ft)
Coupling systemScharfenberg
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The DT 8, also known as S-DT 8, is a type of light rail vehicle used on the Stuttgart Stadtbahn system, produced in multiple iterations by various manufacturers, including Duewag and Stadler, since 1985.

Technical specifications

The trains are formed as two-car sets, with steel car bodies. Up to three sets can operate in multiple.[4]

Variants

First generation: DT8.4 & DT8.S

Testing of three prototype trains began in 1982 on the Alb Valley Railway.[4]

Additional batches of Duewag-built DT8 cars were delivered in 1998, 1989–1990, 1992, 1993, and 1996; these were initially designated DT8.5, DT8.6, DT8.7, DT8.8, and DT8.9, respectively.[6] These variants were all largely identical, aside from the removal of retractable steps from the DT8.6 onward.

From 2007 to 2017, the DT8.5, DT8.6, DT8.7, DT8.8, and DT8.9 cars were thoroughly refurbished by Bombardier. The motors on each were replaced with AC motors, and the interiors were redesigned to resemble those of the DT8.10 and DT8.11. Following the refurbishment, all five batches were renumbered (from 3087–3234 to 4087–4234), and officially redesignated as the DT8.S.

Second generation: DT8.10 & DT8.11

The second generation of the DT8, dubbed the DT8.10, was built jointly by ADtranz and Siemens.[7] 24 units were ordered, with deliveries beginning in April 1999.[2][8] Visually, they are largely identical to their predecessors, inside and out, though they include a number of improvements, such as the addition of IGBT inverters and AC motors, open gangways, LCD information displays, and air conditioning.[2]

Later, an additional 27 units, designated DT8.11, were ordered from Bombardier. Delivered from 2004 to 2005, they are almost completely identical to the prior DT8.10s.[6]

Third generation: DT8.12 – DT8.15

Built by Stadler Rail, the third-generation DT8 is based on the company's Tango model. Its exterior design differs greatly from prior DT8 variants, with a streamlined, aerodynamic front fascia, though its interior is similar to that of its predecessors.

DT8.12 exhibited at InnoTrans 2012

Like the second-generation units, the third-generation DT8 has AC motors, air conditioning, and open gangways between cars.[3][5] They are equipped with sliding plug doors, a departure from the swinging doors of earlier variants.

The first twenty, designated DT8.12, were ordered in 2010.[9] 20 additional sets (DT8.14) were ordered in 2014,[10] followed by twenty more (DT8.15) in 2017.[11] 30 units, tentatively called DT8.16, are currently on order for delivery beginning in 2025; they are intended to replace the remaining original DT8.4 units.[6]

Preserved examples

Two prototype cars were formerly stored at Heslach depot, and were to be moved to the Straßenbahnwelt Bad Cannstatt in 2018.[12]

References

  1. ^ "Stuttgart". Blickpunkt Straßenbahn (in German). Vol. 2/2019, no. 242. Arbeitsgemeinschaft Blickpunkt Straßenbahn e.V. 2019. p. 94. ISSN 0173-0290.
  2. ^ a b c "Stuttgart goes AC motored". railwaygazette.com. DVV Media International. June 1, 1999. Archived from the original on June 4, 2020. Retrieved June 4, 2020.
  3. ^ a b Schulz-Braunschmidt, Wolfgang (January 15, 2014). "Die Stadtbahn-Flotte wächst weiter" [The Stadtbahn fleet keeps growing]. Stuttgarter Zeitung (in German). Archived from the original on March 2, 2017. Retrieved June 7, 2020.
  4. ^ a b c d e f g h Schleife, Hans-Werner; et al. (1992). Metros der Welt [Metros of the world] (in German) (2nd ed.). transpress Verlagsgesellschaft. pp. 340, 341. ISBN 3-344-70715-9.
  5. ^ a b c d e "DT 8.12 - Stuttgarter Strassenbahnen AG" (PDF). stadlerrail.com. Archived (PDF) from the original on January 15, 2020. Retrieved July 26, 2022.
  6. ^ a b c "tram-info Wagenparkliste Stuttgart". www.tram-info.de (in German). Retrieved July 15, 2023.
  7. ^ Stadtbahnwagen S-DT8.10. ADtranz.
  8. ^ AG, SSB. "Stadtbahn". www.ssb-ag.de (in German). Retrieved July 14, 2023.
  9. ^ "Stuttgart to order more light rail and rack railway vehicles". railwaygazette.com. DVV Media International. September 28, 2017. Archived from the original on June 7, 2020. Retrieved June 7, 2020.
  10. ^ Barrow, Keith (January 13, 2014). "Stuttgart orders more Stadler Tango LRVs". railjournal.com. Simmons-Boardman Publishing. Retrieved June 7, 2020.
  11. ^ Barrow, Keith (September 29, 2017). "Stuttgart Tramways approves order for 20 LRVs". railjournal.com. Simmons-Boardman Publishing. Retrieved June 7, 2020.
  12. ^ Bilger, Christine (July 18, 2018). "Auf den letzten Metern aus dem Gleis gesprungen" [Derailed on the last meters]. Stuttgarter Zeitung (in German). Archived from the original on June 7, 2020. Retrieved June 7, 2020.