Jump to content

Nangang Software Park metro station

Coordinates: 25°03′36″N 121°36′57″E / 25.059934°N 121.615874°E / 25.059934; 121.615874
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 115.79.7.98 (talk) at 04:49, 16 October 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Nangang Software Park

BR23 南港軟體園區
Nangang Software Park station platform
Chinese name
Traditional Chinese南港軟體園區
Simplified Chinese南港软体园区
Transcriptions
Standard Mandarin
Hanyu PinyinNángǎng Ruǎntǐ Yuánqū
Bopomofoㄋㄢˊ ㄍㄤˇ ㄖㄨㄢˇ ㄊㄧˇ ㄩㄢˊ ㄑㄩ
Hakka
Pha̍k-fa-sṳNàm-kóng Ngiôn-thí Yèn-khî
Southern Min
Tâi-lôLâm-káng Nńg-thé Hn̂g-khu
General information
LocationNo. 183, Jingmao 2nd Rd.
Nangang, Taipei
Taiwan
Operated byTaipei Metro
Line(s) Wenhu line (BR23)
ConnectionsBus stop
Construction
Structure typeElevated
History
Opened4 July 2009
Passengers
11,898 daily (December 2020)[1]
Rank102 out of 109
Services
Preceding station Taipei Metro Following station
Nangang Exhib Center
Terminus
Wenhu line Donghu
towards Taipei Zoo

The Taipei Metro Nangang Software Park station is located in the Nangang District in Taipei, Taiwan. It is a station on the Brown Line.

Station overview

Nangang Software Park station platform

This two-level, elevated station features two side platforms, two exits, and a platform elevator located on the north side of the concourse level.[2] The station is 93 meters long and 53 meters wide, while the platform is 93 meters long and 21.5 meters wide.[3]

As part of the public art project for Brown Line, the theme for this station is "Digital".[4]

History

Construction of the Nangang Software Park station began on 16 June 2003 and completed on 22 February 2009, before full opening on 4 July 2009. This station is named after the Nankang Software Park in its vicinity.[3]

Station layout

3F Connecting Level Overhead Bridge, Machinery
2F
Side platform, doors will open on the right
Platform 1 Wenhu Line toward Taipei Nangang Exhibition Center (BR24 Terminus)
Platform 2 Wenhu Line toward Taipei Zoo (BR22 Donghu)
Side platform, doors will open on the right
Lobby
(to Platform 2
Lobby, information desk, automatic ticket dispensing machines
one-way faregates, Restrooms
1F Street Level Entrance/Exit

References

  1. ^ "Passenger Volume at Taipei Rapid Transit Stations". Taipei Mass Rapid Transit Co., Ltd. 2021-01-15.
  2. ^ "Route Map: Nangang Software Park". Department of Rapid Transit Systems, TCG. Retrieved 2010-06-14.
  3. ^ a b "Route Map: 南港軟體園區站". East District Project Office, Department of Rapid Transit Systems. 2009-06-11. Retrieved 2010-06-14.
  4. ^ "( B10 ) Nangang Software Park". Comprehensive Planning Division, Civil Engineering and Architectural Design Division. 2009-07-04. Archived from the original on 2016-03-03. Retrieved 2009-07-12.

25°03′36″N 121°36′57″E / 25.059934°N 121.615874°E / 25.059934; 121.615874