Xianggang Road station
Appearance
Xianggang Road 香港路 | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||
Location | Jiang'an District, Wuhan, Hubei China | ||||||||||||||||||||
Coordinates | 30°36′28″N 114°16′45″E / 30.6077°N 114.27926°E | ||||||||||||||||||||
Operated by | Wuhan Metro Co., Ltd | ||||||||||||||||||||
Line(s) | |||||||||||||||||||||
Platforms | 6 (2 side platforms, 2 island platforms) | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | December 28, 2015 (Line 3) December 28, 2016 (Line 6) October 1, 2018 (Line 7) | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Xianggang Road (Chinese: 香港路站) is a transfer station on the Wuhan Metro. It entered revenue service on December 28, 2015. It is located in Jiang'an District.[1] This station is an interchange between Line 3, Line 6 and Line 7.
Station layout
G | Entrances and Exits | Exits A, B, D-H | |
B1 | Concourse | Faregates, Station Agent | |
B2 | Transfer Corridor | ||
Side platform, doors will open on the right | |||
Northbound | ← Line 6 towards Xincheng 11th Road (Sanyanqiao) | ||
Southbound | Line 6 towards Dongfeng Motor Corporation (Miaoli Road) | → | |
Side platform, doors will open on the right | |||
Transfer Corridor | |||
B3 | Southbound | ← Line 3 towards Zhuanyang Boulevard (Lingjiaohu) | |
Island platform, doors will open on the left/right | |||
Northbound | ← Line 7 towards Garden Expo North (Qushuilou) | ||
B4 | Northbound | Line 3 towards Hongtu Boulevard (Huiji 2nd Road) → | |
Island platform, doors will open on the left/right | |||
Southbound | Line 7 towards Qinglongshan Ditiexiaozhen (Sanyang Road) | → |
Gallery
-
Entrance D
-
Concourse
-
Line 6 platform
-
Line 3 & 7 platform
References
- ^ "武汉即将地铁成环 "环金时代"重构商业地理". 长江日报. 2015-12-24. Archived from the original on December 24, 2015. Retrieved 2015-12-24.